1.             2011 DRAFT OPERATING AND CAPITAL bUDGET – tRANSPORTATION cOMMITTEE

 

                budgetS PRÉLIMINAIRES de fonctionnement et d’immobilisations de

2011– COMITÉ DES TRANSPORT

 

 

COMMITTEE RECOMMENDATIONS AS AMENDED

 

That Council, sitting as Committee of the Whole, approve the Transportation Committee portion of the 2011 Operating and Capital Budgets as amended by replacement pages 131-149 of the Transportation Committee Budget document and as amended by the following:

 

TRAFFIC MANAGEMENT AND OPERATIONAL SUPPORT

(pg. 17-18)

 

1.         Whereas the City of Ottawa is promoting safe streets and sidewalks;

 

And Whereas the City is encouraging more walking for children on their way to school;

 

And Whereas the forecast in the budget included a $60,000 pressure for 10 new crossing guards;

 

Therefore Be It Resolved that the $60,000 be reinstated for school crossing guards.

 

ROADS AND TRAFFIC MAINTENANCE

(pg. 25)

 

2.         That the budget be reduced by 2 FTEs and associated costs.

 

FLEET SERVICES

(pg. 41)

 

3.         That the budget be reduced by 1 FTE and associated costs.

 

 

RecommandationS MODIFIÉES DU Comité

 

Que le Conseil, siégeant à titre de Comité plénier, approuve les parties pertinentes des budgets de fonctionnement et d’immobilisation de 2011 relatives au Comité des transports telles que modifiées par le remplacement des pages 131 à 149 du document budgétaire du Comité des transports et telles que modifiées par ce qui suit :

 

GESTION DE LA CIRCULATION ET SOUTIEN OPÉRATIONNEL

(p. 17-18)

 

1.         Attendu que la Ville d’Ottawa fait la promotion de la sécurité dans les rues et sur les trottoirs;

 

Et attendu que la Ville encourage les enfants à marcher davantage pour se rendre à l’école;

 

Et attendu que les prévisions énoncées dans le budget indiquent un besoin de 60 000 $ pour l’embauche de 10 nouveaux brigadiers scolaires;

 

Par conséquent, il est résolu de rétablir les crédits de 60 000 $ pour l’embauche de brigadiers scolaires.

 

ENTRETIEN DES ROUTES ET CIRCULATION ROUTIÈRE

(p. 25)

 

2.         Que le budget soit réduit de 2 ÉTP et des coûts connexes.

 

SERVICES DU PARC AUTOMOBILE

(p. 41)

 

3.         Que le budget soit réduit de 1 ÉTP et des coûts connexes.

 

 

 

 

Documentation

 

1.                  Transportation Committee Coordinator’s report dated 24 January 2011 (ACS2011-CCS-TRC-0004);

 

2.                  Extract of Draft Minutes of the Transportation Committee meeting of 2 February 2011 immediately follows the Transportation Committee Coordinator’s report;

 

3.                  Deputy City Manager, City Operations, report entitled 2011 Vehicle Growth - Annual Report - Information Supplemental to the Budget Estimates and dated 2 February 2011 (ACS2011-COS-PWS-0004) is attached as Annex 1;

 

4.                  Deputy City Manager, City Operations, report entitled 2011 Municipal Vehicle and Equipment Capital Replacement Plan - Information Supplemental to the Budget Estimates and dated 2 February 2011 (ACS2011-COS-PWS-0002) is attached as Annex 2.

 


Report to/Rapport au :

 

Transportation Committee / Comité des transports

   

and Council / et au Conseil  

 

24 January 2011 / le 24 janvier 2011

 

Submitted by/Soumis par : Committee Coordinator / Coordonnatrice du comité

 

Contact Person/Personne ressource : Rosemary Theriault, Committee Coordinator

City Clerk and Solicitor/Greffier et Chef du contentieux

(613) 580-2424 x21624

 

City Wide/à l'échelle de la Ville

Ref N°: ACS2011-CCS-TRC-0004

 

 

SUBJECT:

2011 DRAFT OPERATING AND CAPITAL BUDGET - TRANSPORTATION COMMITTEE

 

 

OBJET :

budgetS PRÉLIMINAIRES de fonctionnement et d’immobilisations de 2011– COMITÉ DES TRANSPORT

 

 

REPORT RECOMMENDATION

 

That the Transportation Committee consider the relevant portions of the 2011 Operating and Capital Budgets and forward its recommendations to Council, sitting as Committee of the Whole, for consideration at the meeting to be held March 8 to 10, 2011, as required.

 

 

RECOMMANDATION DU RAPPORT

 

Que le Comité des transports examine les sections pertinentes des Budgets d’immobilisations et de fonctionnement de 2011 et qu’il présente ses recommandations au Conseil, siégeant à titre de Comité plénier, aux fins d’examen lors de sa réunion prévue du 8 au 10 mars 2011, au besoin.

 

 

BACKGROUND

 

City Council, on December 8, 2010, while considering the 2010-2014 Council Governance Review report, approved the 2011 Budget process which indicated that the individual Committees, Board and Commission would hold meetings to listen to public delegations, review their respective budgets and make recommendations to Council. 

 

At that meeting, Council also approved a motion directing the City Treasurer to report back to Council on 15 December 2010 with a more detailed timetable, including suggested Standing Committee review dates, and budget development guidelines. 

 

On December 15, 2010 Council considered and approved the City Treasurer’s report entitled “2011 Budget Timetable and Process”, together with the following motion:

 

MOTION NO. 2/9

 

Moved by Mayor J. Watson

Seconded by Councillor S. Desroches

 

WHEREAS this Council is committed to promoting a culture of fiscal responsibility at City Hall; and

 

WHEREAS this Council wishes to proceed with the development of its 2011 Budget as soon as possible; and

 

WHEREAS budget directions with respect to any taxation target have not yet been provided to either staff or Standing Committees responsible for preparing and reviewing budget submissions; and

 

WHEREAS City Council’s first budget will set the pace and tone for all four budgets we will fashion together; and

 

WHEREAS Council is mindful of the tough choices many of its citizens must make every day in this economy and is prepared to make the same tough choices when deciding how to spend taxpayers’ dollars in 2011 and beyond; and

 

WHEREAS the Long Range Financial Plan that is to be developed after the adoption of the 2011 budget provides a term of Council forecast of the City’s financial situation;

 

THEREFORE BE IT RESOLVED that the 2011 Draft Budget for all of the City’s tax-supported programs be prepared on the basis of a maximum 2.5% total tax increase; and

 

BE IT FURTHER RESOLVED that the Mayor and the City Manager present a budget overview report to Council that details how that tax target objective can be achieved at a Special Meeting on January 19, 2011; and

 

BE IT FURTHER RESOLVED that City Council direct each Standing Committee to work within the funding envelope for the budgets in their mandates, and that  any additions to the budget will require offsetting reductions; and

 

BE IT FURTHER RESOLVED that City Council request the Ottawa Police Services Board and the Ottawa Public Library Board deliver budgets that would have no more than 2.5% increase on their  tax requirement; and

 

BE IT FURTHER RESOLVED that the Long Range Financial Plan be developed with a maximum tax increase of 2.5% for the years 2012 to 2014.

 

                                                                                                            CARRIED

 

Of particular note to Committees, is the second resolutionof this motion, namely:

 

“BE IT FURTHER RESOLVED that City Council direct each Standing Committee to work within the funding envelope for the budgets in their mandates, and that any additions to the budget will require offsetting reductions;"

 

City Council at its meeting of 19 January 2011, tabled the 2011 Draft Operating and Capital Budgets and referred the budgets within each Standing Committee's mandate, to that Committee for consideration and recommendation to Council.   

 

 

DISCUSSION

 

The 2011 Transportation Committee Draft Operating and Capital Budget is now before the Committee for the purpose of hearing from public delegations and to consider and make recommendations to Council. 

 

 

RURAL IMPLICATIONS

 

The Agriculture and Rural Affairs Committee will review and make recommendations on those portions of the budget with Rural Implications.

 

 

CONSULTATION

 

This meeting was advertised in the three daily newspapers and public delegations will be received by the Committee.  As well, there will be five multi-ward bilingual budget consultation meetings held in late February and early March, 2011 (i.e. in advance of Council's consideration of the Budget to be held March 8 to 10, 2011).  

 

 

COMMENTS BY THE WARD COUNCILLOR(S)

 

N/A

 

 

LEGAL/RISK MANAGEMENT IMPLICATIONS

 

There are no legal/risk management impediments to implementing the recommendations int his report.

 

 

CITY STRATEGIC PLAN

 

N/A

 

 

TECHNICAL IMPLICATIONS

 

N/A

 

 

FINANCIAL IMPLICATIONS

 

Financial Implications are identified in the 2011 Draft Operating and Capital Budgets, as well as in the City Treasurer's Transmittal Report dated 17 January 2011 and entitled "2011 Draft Operating and Capital Budgets - Tax Support Programs", tabled with Council on 19 January 2011.

 

 

SUPPORTING DOCUMENTATION

 

Document 1 - City Treasurer's report dated 17 January 2011, entitled 2011 Draft Operating and Capital Budgets - Tax Support Programs (issued previously.)

 

Document 2 -  2011 Transportation Committee Draft Operating and Capital Budgets (issued previously.)

 

 

DISPOSITION

 

The Committee Coordinator will forward the Committee's recommendations to Council for consideration, at the meeting of March 8 to 10, 2011.  Budgets will be amended as per Council deliberation and adoption.

 


2011 DRAFT OPERATING AND CAPITAL bUDGET – tRANSPORTATION cOMMITTEE

budgetS PRÉLIMINAIRES de fonctionnement et d’immobilisations de 2011– COMITÉ DES TRANSPORT

ACS2011-CMR-TRC-0004                            CITY WIDE / À L'ÉCHELLE DE LA VILLE

 

Moved by Councillor B. Monette

 

WHEREAS the Standing Committee Budget books were aligned with Standing Committees based on the former Terms of Reference; and

 

WHEREAS on 26 January 2011 Council directed that staff review the Books to ensure that the budget items are addressed by the Standing Committee with the mandate under the new Terms of Reference; and

 

WHEREAS the City Treasurer, in conjunction with the City Clerk and Solicitor and affected Committee Chairs, were delegated the authority to route budget pages to the appropriate Standing Committee;

WHEREAS in a memo dated 31 January 2011 the aforementioned budget pages were distributed to all members of Council;

 

THEREFORE BE IT RESOLVED THAT pursuant to Section 84(3) of the Procedure By-law (being By-law No. 2006-462), the Transportation Committee consider the amended pages reflected in the memo to members of Council.

 

                                                                                                CARRIED

 

The Committee received a joint presentation from the City Treasurer, Marian Simulik, John Manconi, General Manager, Public Works and John Moser, General Manager of Planning and Growth Management on the Draft Tax Supported Budget for the Transportation Committee.  A correction was made to the slide entitled 2011 Capital Funding Source, whereby the term “Tax supported Debt” was identified as having to be replaced with “Development Charge Debt”.  The Committee confirmed this revision.  A copy of the joint presentation is held on file.

 

Following a brief question and answer period from Committee members as a result of the presentation, the following public delegations were received:

 

Michael Powell, Chair, Roads and Cycling Advisory Committee (RCAC)

·         Supported the $2.8M in the budget for cycling initiatives; the funding goes a long way towards implementing the Ottawa Cycling Plan; ongoing investments will be required to maintain the network

·         The City takes advantage of shared opportunities to include cycling projects on existing road works; this can save money but it also creates an unusual situation where there will be discontinuity between cycling facilities

·         Filling in the gaps in cycling routes is important and creates a stronger network that people use, thereby making better use of the City’s investment

·         RCAC is excited about the prospect of a bike sharing service and they encourage the City to continue to explore that project, in consultation with the NCC and the City of Gatineau

·         Education is an important key towards encouraging cycling and encouraging safe cycling; funds that go towards encouraging the use of the City’s CanBike program and Bike to Work Week should be targeted as much as possible.

 

Garry Lindberg, Brenda Ellicott, Alta Vista Drive Residents Association spoke in support of the funding to complete Phase 1 of the Alta Vista Parkway.  Highlights of their presentation were as follows:

·         this Phase 1 Hospital link has been in the detailed design phase since 2006 and the need has been clearly established for decades

·         it will provide badly needed additional access to the ever-expanding Hospital campus and to reduce traffic volumes on Alta Vista Drive and Smyth Road

·         a second access road will ensure timely access to the hospital complex, especially for emergency vehicles

·         vehicular volumes on Alta Vista Drive will only increase as development continues to the south and the Hospital complex expands; little can be done to reduce this traffic and the associated cut through traffic problems until this Parkway is completed

·         Phase 1 provides for direct linkage to the Southeast Ottawa Transitway so that bus service to the hospital can be enhanced; the hospital Link and the Cumberland Transitway Westerly Planning Study determined that direct linkage is essential and that this need will be met by this leg of the Alta Vista Parkway, thereby removing the need to construct a separate bus transitway

 

A copy of their written submission is held on file.

 

Ron Rose, Riverview Park Community Association read a prepared statement on behalf of the Chair of the Community Association.  Details of their concerns about funding the Hospital Link” in the Alta Vista Transportation Corridor were voiced and are contained in detail in a written presentation.  The RPCA made the following recommendations:

 

·         Use the funds presently budgeted for new roads to repair existing roadways

·         Restore $3.5M in 2011 funding to allow for the implementation of the Pedestrian Plan which the City approved in 2008

·         Provide sufficient funding to fully implement the Ottawa Cycling Plan ($5M per year)

·         Provide funding for the Segregated Bike Lane Pilot project along Laurier

·         Approve funding to construct the Coventry Overpass to the Train Station

 

A copy of their written submission is held on file.

 

John Dance, Old Ottawa East Cycling Committee voiced their concerns about the inadequate cycling/pedestrian investment in this budget.  He stated that while there have been significant accomplishments, e.g. Corktown Footbridge, there is still a lot of discontinuity and many gaps in the system.  They were concerned about the status of the cycling initiatives which are listed below the cut-off line, including missing links for Sawmill Creek, Hampton Park, Champagne/O-Train Corridor and others.  In addition, the Rideau River Western Pathway is a critical link that needs to be addressed sooner rather than later because of the benefits it can bring to the city.  Mr. Dance also spoke briefly in opposition to any funding for the Alta Vista Corridor and suggested that any funding should be going towards cycling and pedestrian facilities.  In attendance with this delegation, Chris Osler from the Sandy Hill Community Health Centre added that the Alta Vista Corridor would effectively sever about 3000 residents from a well-used greenspace.  It would leave them to be surrounded by other roadways and transitways thereby isolating them even further.  A copy of Mr. Dances’ PowerPoint presentation is held on file.

 

Eric Darwin, Dalhousie Community Association spoke in support of putting the Somerset underpass back into the 2011 budget.  This link was part of a series of priority links originally approved by Council in 2010.  The main impediment to completing the path north to the Ottawa River was the lack of an underpass at Somerset, where the O-Train uses an existing underpass too narrow and old to expand.  He noted that Somerset Street is going to be reconstructed in this very location this year, but instead of completing this underpass during that time, there is a proposal in the budget to remove that funding.  In the coming year or two when the underpass is constructed, the new road will have to be dug up and all utilities will be affected again.  This is not money well spent.  A copy of his presentation is held on file.

 

In response to this presentation, Wayne Newell, General Manager, Infrastructure Services advised that the underpass is west of the limits where the Somerset road reconstruction is to occur this year.  He further confirmed that the facility is not programmed for the several years and would have to be a separate item in the budget.  Councillor Holmes noted that they have been working with the community for the Somerset Street reconstruction for about 18 months and she recalled many discussions on the underpass.  She presumed it would have been part of the road reconstruction.

 

Lori Mellor, Preston Street BIA also spoke in support of the Multiple Use Pathway between Somerset and Bayview, stating that this link would create a cycling and pedestrian link that would connect the south side of Somerset Street with Bayview Station.  She added that the Carling-Bayview Community Design Plan clearly defined this connection as a critical pedestrian and cycling link through this neighbourhood and once completed, the pathway will make the connection for cyclists and pedestrians between Dow’s Lake and the Ottawa River Parkway.  She recognized that disruption caused by the reconstruction of Somerset Street will affect businesses and to ask them to go through yet another reconstruction when the underpass is finally completed is unreasonable.  She maintained that financial efficiencies can be gained by doing both projects this year.  A copy of her written submission is held on file.

 

John Brennan, Canterbury Community Association spoke in support of the funding for Phase 1 of the Alta Vista Transportation Corridor.  He indicated that this link connects the hospitals to Riverside Drive and will bring people where they want to go.  It is the first step towards eventual completion of the project.  For many, it will provide a more efficient route to get downtown, and for others, a more efficient route to Highway 417.  This corridor will meet the growth in the south and at the hospital complexes and will help to reduce greenhouse gasses by making a more direct route for the traffic.  A copy of his written submission is held on file.

 

Lyall Steele, Graydex gave a PowerPoint presentation on the economic contributions construction companies, namely:  the National Capital Heavy Construction Association, give to the municipality.  He remarked on the investment in transportation infrastructure and the obligation of the City has to take care of the assets it owns so costs are not passed down to future taxpayers.  He illustrated how road renewal funding has decreased over the years.  Mr. Steele pointed out that the priorities for taxpayers are keeping tax increases under control and repairing road, bridge, water and sewer infrastructure.  The cost of putting off rehabilitating road infrastructure can be staggering.  Together with Dale Harley from the NCHCA, they put forward a number of recommendations for the Committee’s consideration.  A copy of their presentation is held on file.

 

 

The Committee then proceeded to consider the Operating and Capital budget pages.

 

PUBLIC WORKS GENERAL MANAGER’S OFFICE (pgs. 11-13)

 

The Committee approved these pages as presented.

 

TRAFFIC MANAGEMENT AND OPERATIONAL SUPPORT (pgs. 15-20)

 

Councillor Bloess indicated that he wanted to put back $60,000 for the Adult Crossing Guard program.  The Chair reminded members of Council direction that Committees are to “work within the funding envelope for the budgets in their mandates, and that any additions to the budget will require offsetting reductions”.  The Committee voted on the Motions on FTE reductions first prior to dealing with the following Motion:

 


Moved by Councillor R. Bloess

 

Whereas the City of Ottawa is promoting safe streets and sidewalks;

 

And Whereas the City is encouraging more walking for children on their way to school;

 

And Whereas the forecast in the budget included a $60,000 pressure for 10 new crossing guards;

 

Therefore Be It Resolved that the $60,000 be reinstated for school crossing guards.

 

                                                                                                CARRIED

 

TRAFFIC MANAGEMENT AND OPERATIONAL SUPPORT (pgs. 15-20)

 

The Committee approved these pages as presented.

 

ROADS AND TRAFFIC MAINTENANCE (pgs. 21-26)

 

Councillor Clark did not feel it was necessary to add all those FTEs and suggested a reduction in that request by two.  Mr. Manconi explained that overall, the Department has reduced their requirement by 13 because of efficiencies in parking operations.  Their net increase is only 10.5 FTE.  In this area with CUPE they have actually reduced their resource requirement because they have established a casual labour force so those numbers would have been higher two years ago.  When asked what the impact would be of a reduction in staff, the General Manager advised that it would be marginal.

 

Moved by Councillor P. Clark

 

That the budget be reduced by 2 FTEs and associated costs.

 

 

                                                                                                CARRIED

 

PARKING OPERATIONS (pgs. 27-31)

 

The Committee approved these pages as presented.

 

FLEET SERVICES (pgs. 37-42)

 

Councillor Clark noted that there is an addition of one FTE on page 40 and one FTE is removed on page 41.  He asked if the Department could reduce this program by one FTE and Mr. Manconi agreed they could do that.

 

Moved by Councillor P. Clark

 

That the budget be reduced by 1 FTE and associated costs.

 

                                                                                                CARRIED

 

In response to a query for staff follow-up about this portion of the budget, the Chair advised that staff intend to bring forward reports periodically on these and other matters.

 

TRANSPORTATION PLANNING (pgs. 43-54)

 

The Committee approved these pages as presented.

 

CAPITAL BUDGET (pgs. 55-136, including replacement pages 131-149)

 

Councillor Fleury proposed a Motion about the Somerset multi-use pathway on behalf of Councillor Holmes, the operative portion being:

 

That residual funds from 905929 Cycling Initiatives be dedicated to the Champagne/O-Train Corridor pathway up to a limit of $700,000, with a recognition that should additional funds become available, that this pathway tunnel could be built in 2011 in conjunction with the Somerset reconstruction.

 

Vivi Chi, Manager of Transportation Planning indicated that the $1.6M shown at page 126 is the City’s share of funding this facility, with additional support coming from the NCC.  Staff will be meeting with Commission representatives about this later in the year.  The Chair asked if that could be done first and then report back to the Committee before the construction season begins so the Committee knows what the status is.  Ms. Chi confirmed they would undertake to do this.

 

Councillor Holmes stated that the design for the tunnel is underway so if the NCC agree and the City moves forward this tunnel should be built because it will save costs and major aggravation for the businesses on Somerset Street.  The hope is to have it constructed this year to reduce financial loss to those businesses.  Alain Gonthier, Manager of Assessment Management explained that the tunnel has been identified as a need and the only design work on the tunnel and pathway is on a functional level.  There is no funding available for the detailed design of the tunnel or pathway so any funding could be used for the design.  He agreed that if the NCC comes through with funding they could do that.

 

Further discussion ensued on the items on the list which are ahead of this particular pathway and Ms. Chi did explain that the last five projects listed at the bottom of page 126 and the top of page 126 are cost-shared with the NCC; they are not listed in a priority order and are dependent on funding and discussions with the NCC.  Ms. Schepers added that Council has given direction to staff to include these in the budget and once the budget is approved, staff would bring forward a report on those projects to discuss with the NCC.

 

Noting this, Councillor Deans suggested the Motion be tabled pending further input from the NCC.  Ms. Chi advised that staff should be able to report back in a couple of months.

 

Moved by Councillor M. Fleury

 

WHEREAS the design for the Champagne/O-Train Corridor multi-use pathway (Somerset to Bayview) is being completed as part of the Somerset reconstruction occurring in 2011 between Bayswater and Booth Streets;

 

AND WHEREAS this corridor involves a tunnel under Somerset Street;

 

AND WHEREAS savings can be realized by achieving an economy of scale, and reductions in impacts to residents and the business community are made through the coordination of roadworks and construction projects;

 

AND WHEREAS the projected cost of this segment of the Champagne/O-Train Corridor pathway is $1.6 million;

 

THEREFORE BE IT RESOLVED that residual funds from 905929 Cycling Initiatives be dedicated to the Champagne/O-Train Corridor pathway up to a limit of $700,000, with a recognition that should additional funds become available, that this pathway tunnel could be built in 2011 in conjunction with the Somerset reconstruction.

 

                                                                                                TABLED

 

The Committee approved the Capital budget, as amended by the replacement pages.

 

That the Transportation Committee consider the relevant portions of the 2011 Operating and Capital Budgets (as amended above) and forward its recommendations to Council sitting in Committee of the Whole to be held March 8 to 10, 2011, as required.

 

                                                                                                            CARRIED, as amended