Current Roadwork and Street Closures


 
Transit service and fare discounts    Transit service and fare discounts »
Interactive Traffic Map  Interactive Traffic Map »
Seasonal Load Restrictions    Seasonal Load Restrictions »

Through this search tool you can access information on current road closures and detours due to construction and/or special events. Dates and times provided below may change due to weather conditions and other factors affecting construction. Although this list is intended to be comprehensive, unavoidable emergency closures and minor closures are not listed.

To begin, simply choose the appropriate search field or enter a keyword and "search". The option is also available to view all activities.

by Keyword:
by Date: between

and
by Traffic Impact:
by Activity Type:
by Ward:

All current projects:


All Activities

Found 113 Results.


Activity Location  Date Time  Project Impact and Description Ward
Construction
LRT Stage 2 
174 W/B between Montreal and Blair Roads  Thursday, September 24 to Saturday, September 26, 2020
 
High
Reduced to one lane 
2, 11 
Construction
Rehabilitation and widening of Highway 417  
417 between west of Maitland Avenue and east of Island Park Drive   Sunday, October 1, 2017
To November 2020 
Medium
Lane closures 
15 
Construction
MTO Project 
417 and Ramsayville Road  Thursday, June 6, 2019
Until 2022 
Low
Lane Reductions 
10 
Construction
LRT Stage 2 
Ramp - Airport Parkway N/B to Hunt Club Road  Thursday, September 24 to Monday, September 28, 2020
Nightly from 8pm to 6am on weekdays 
Low
Road closed 
16 
Construction
LRT Stage 2 
Ramp - Montreal Road E/B to 174 W/B   Saturday, September 26 to Sunday, September 27, 2020
from 7pm to 6am  
High
Road closed 
11 
Construction
Bridge renewals 
8th Line Road between Lawrence Street and Marvelville Road  Monday, September 3, 2029 to Friday, October 2, 2020
 
Low
Road closed 
20 
Construction
Sewer rehabilitation 
Acacia Avenue between Thorold Road and Sir George-Étienne Cartier Parkway  Monday, August 24 to Friday, October 2, 2020
 
Low
Road closed 
13 
Construction
Mnhole Rebuilds 
Albert and O'Connor Intersection  Monday, September 28 to Friday, October 9, 2020
 
Medium
Lane reductions in the North/West corner 
14 
Construction
Road resurfacing 
Albirch Drive between Ballie Avenue and Dead end  Monday, August 24, 2020
Until September 2020 
Low
Intermittent lane closures 
5 
Construction
Traffic calming 
Amiens Street between Prestone Drive and St-George Street  Thursday, October 1 to Wednesday, October 21, 2020
 
Low
Road closed 
2 
Construction
Traffic calming 
Amiens Street between Prestwick Drive and Tammy Street  Thursday, October 1 to Wednesday, October 21, 2020
 
Low
Road closed 
2 
Construction
Watermain rehabilitation 
Ashburn Drive between Wigan Drive and Ness Street  Friday, May 15 to Friday, November 20, 2020
 
Low
Road closed 
8 
Construction
Crack sealing 
Asphark Crescent between the S/E Bend and the North Bend  Tuesday, September 29, 2020
From 9am to 3:30pm 
Low
Lane reductions 
10 
Construction
Integrated road, sewer and watermain reconstructiom 
Attwood Crescent East  Tuesday, September 22 to Monday, September 28, 2020
 
Low
Road closed 
9 
Construction
Road resurfacing 
Baird Street between Constance Bay Road and Macmillan Lane  Tuesday, August 25, 2020
Until september 2020 
Low
Intermittent lane closures 
5 
Construction
Watermain construction 
Barnsdale Road between Greenbank and Viewbank roads  Wednesday, August 5 to Friday, November 13, 2020
 
Medium
Road closed 
3, 21 
Construction
Installation of a trunk sewer 
Bayfield Avenue between Herzberg Road and Carling Avenue  Monday, July 30, 2018 to Saturday, October 31, 2020
 
High
Road closed 
4 
Construction
Overpass rehabilitation 
Beech Street between Railway Street and Preston Street  Monday, August 24 to Tuesday, November 10, 2020
 
Low
Road closed 
15 
Construction
Integrated road, sewer and watermain replacement project 
Belmont Avenue between Riverdale Avenue and Fairbairn Street   Monday, August 24 to Tuesday, December 15, 2020
 
Low
Road closed 
17 
Construction
Installation of a new gas main  
Besserer Street between King-Edward and Nelson Street  Monday, September 21 to Friday, October 2, 2020
 
Low
Road closed 
12 
Construction
Hydro poles and duct bank Insallation 
Blais Road from Bank Street to Hawthorne Road  Tuesday, September 29, 2020
From 9am to 3:30pm 
Low
Lane reductions 
20 
Construction
Hydro poles and duct bank Insallation 
Blais Road from Bank Street to Hawthorne Road  Monday, October 5 to Friday, November 27, 2020
 
Low
Road closed 
20 
Construction
Sewer rehabilitation 
Borthwick Avenue between Clarke and Gardenvale Avenues  Monday, May 11 to Thursday, October 15, 2020
 
Low
Road closed 
13 
Construction
Connecting new services 
Breezehill Avenue between Hickory Street and Beech Street  Tuesday, October 13 to Thursday, October 15, 2020
 
Low
Road closed 
15 
Constgruction
Road resurfacing 
Bronson Avenue between Brookfield and Colonel By  Tuesday, August 11, 2020
Until October 
Medium
Intermittent Lane Closures - Night Work 
16, 17 
Construction
Transit priority improvements 
Bronson Avenue between Riverside and University drives  Monday, July 20, 2020
Until mid-October 
High
Reduced to 2 lanes during peak hours and one lane during off peak hours in northbound 
17 
Construction
Development construction 
Bronson Avenue between Gloucester Street and Nepean Street  Tuesday, April 30, 2019
Until December 2019 
Medium
Reduced to 1 lane in the southbound direction 
14 
Construction
LRT Stage 2 
Byron Avenue between Richardson Avenue and Redwood Avenue  Monday, September 28 to Wednesday, December 23, 2020
 
Low
Road closed 
7, 15 
Construction
Sewer rehabilitation 
Cambridge Street north between Cambridge Street and Somerset Street West  Monday, March 16 to Friday, November 27, 2020
 
Low
Road closed 
14 
Construction
Montreal Road Revitalization 
Cantin Street between Montfort Street and Montreal Road  Monday, June 29 to Friday, November 20, 2020
 
Low
Road closed 
12 
Construction
Crack sealing 
Capreol Street between Boisfranc Circle and Portobello Boulevard  Monday, September 21 to Friday, September 25, 2020
 
Low
Reduced to one lane with alternating traffic 
19 
Construction
Mobile crane 
Cathcart Street between Sussex Drive and Gilberte Paquette Avenue  Saturday, October 3, 2020
closed for one day 
Low
Road closed 
12 
Construction
Staging area 
Champagne Avenue between Beech Street and Hickory Street  Monday, July 20 to Sunday, November 1, 2020
 
Low
Road closed 
15 
Construction
Road resurfacing 
Chapman Boulevard between Doral Avenue and Othello Avenue  Monday, July 13, 2020
Until end of September from 7 am to 10 pm 
Low
Intermittent lane closures 
18 
Construction
Strandherd Drive widening 
Chapman Mills Drive betweeen Strandherd Drive and Waterlilly Way  Monday, September 14 to Saturday, October 10, 2020
 
Low
Road closed 
3 
Construction
Crack sealing 
Cherington Crescent   Monday, September 21 to Friday, September 25, 2020
 
Low
Reduced to one lane with alternating traffic 
19 
Construction
Bridge renewal 
Church Street between Perkins Drive and Carolin Court  Thursday, June 25 to Thursday, October 15, 2020
 
Low
Road closed 
21 
Construction
Connecting new services 
Cobourg Street between and Tormey and Rideau streets  Saturday, September 26 to Sunday, September 27, 2020
 
Low
Road closed 
12 
Construction
Sewer rehabilitation 
Coltrin Road between Acacia Avenue and Springfield Road  Monday, September 28, 2020
closed for one day 
Low
Road closed 
13 
Construction
Integrated road, sewer and watermain replacement project 
Claymor Avenue between Falaise Road and Normandy Crescent  Tuesday, August 4 to Monday, November 30, 2020
 
Low
Road closed 
16 
Construction
Integrated road, sewer and watermain reconstruction 
Claymor Avenue between Falaise Road and Greenbriar Avenue  Tuesday, August 4 to Friday, October 30, 2020
 
Low
Road closed 
9 
Construction
Installation of a new fire hydrant 
Clearbrook Drive between Longfields and Beatrice Drives  Wednesday, September 23 to Friday, September 25, 2020
 
Medium
Road closed 
22 
Construction
Culvert renewals 
Craig Side Road between Carp Road and Farmland Road  Monday, October 5 to Friday, October 16, 2020
 
Medium
Road closed 
5 
Construction
Combined Sewer Storage Tunnel (CSST) Project 
Cumberland Street between Stewart Street and Wilbrod Street  Monday, September 9, 2019 to Wednesday, September 30, 2020
 
Low
Road closed 
12 
Construction
Integrated road, sewer and watermain reconstruction 
Deer Park Road between Fisher Avenue and Millbrook Crescent  Monday, August 10 to Thursday, December 31, 2020
 
Low
Road closed in the westbound direction 
9 
Construction
Integrated road, sewer and watermain replacement project 
Fairbrain Street between Sunnyside Avenue and Belmont Avenue   Tuesday, August 25 to Tuesday, December 15, 2020
 
Low
Road closed 
17 
Construction
Renewal of culverts 
Fallowfield Road between Conley Road and Huntley Road  Monday, September 21 to Friday, October 2, 2020
 
Low
Road closed 
21 
Construction
Crack sealing 
Fisher Avenue between Baseline Avenue and Carling Avenue  Monday, September 28, 2020
From 9am to 3:30pm 
Low
Lane reductioons  
16 
Construction
Connecting new services 
Foley Avenue between Dakota Avenue and St Laurent Boulevard  Friday, April 10 to Sunday, October 25, 2020
 
Low
Road closed 
18 
Construction
Stage 2 LRT 
Fraser Avenue between Skead Street and Richmond Road  Monday, August 31 to Friday, October 30, 2020
 
Low
Road closed 
15 
Construction
Watermain construction 
Gardenvale Road between Cummings and Trojan avenues  Monday, May 25 to Thursday, October 15, 2020
 
Low
Road closed 
13 
Construction
Sewer and Watermain Rehabilitation 
Gilchrist Avenue between Scott and Spencer streets  Monday, September 28 to Friday, October 2, 2020
 
Medium
Road closed 
15 
Construction
New traffic pattern 
Greenbank Road between Kilbirnie Drive and Barnsdale Road  Monday, July 6 to Friday, October 30, 2020
 
Medium
Intermittent lane reductions 
21 
Construction
Watermain construction 
Hamlet Road between Haig and Saunderson Drive  Monday, July 20 to Friday, October 30, 2020
 
Low
Road closed 
18 
Construction
Road work 
Hawthorne Road between Hunt Club and Stevenage Drive  Monday, October 5 to Friday, October 9, 2020
 
High
Intermittent Lane reductions 
10 
Construction
Integrated road, sewer and watermain reconstruction 
Hilliard Avenue between Barlyn Avenue and Vanson Avenue  Wednesday, August 5 to Thursday, December 31, 2020
 
Low
Road closed 
9 
Construction
Connecting new services 
Hilson Avenue between Wesley Avenue and Geoffrey Street   Monday, September 21 to Friday, September 25, 2020
 
Low
Road closed 
15 
Construction
NCC Project 
Hogs Back Road between Colonel By Drive and Prince of Wales Drive  Wednesday, August 12 to Thursday, October 1, 2020
 
High
Road closed 
16 
Construction
NCC Project 
Hogs Back Road between Colonel By Drive and Riverside Drive  Monday, May 4 to Thursday, December 31, 2020
 
High
Road closed 
16 
Construction
Connecting new services 
Hudson Avenue between Lexington Street and Morley Avenue  Tuesday, September 22 to Monday, September 28, 2020
 
Low
Road closed 
16 
Construction
Intersection Modification/Roundabout Construction 
Huntmar Drive W/B between Richardson Side and Bradley Side Road  Friday, October 2 to Monday, October 5, 2020
 
Low
Road closed 
5 
Construction
MTO Project 
Innes Road at (MTO) 417  Wednesday, August 19 to Friday, November 27, 2020
 
Medium
Reduced to one lane in each direction 
11 
Construction
Flood wall repair 
Jamieson Street bewtween Kehoe Street and Death End  Wednesday, September 2 to Wednesday, September 30, 2020
 
Low
Road closed 
7 
Construction
Mobile crane 
Kingsford Crescent  Wednesday, September 30, 2020
closed for one day 
Low
Road closed 
4 
Construction
Road resurfacing 
Laurier Avenue between Waller Street and King Edward Avenue  Tuesday, August 11, 2020
Until October 
Medium
Reduced to one lane in each direction 
12 
Construction
Resurfacing 
Leitrim Road between Albion Road and Bank Street   Monday, August 10 to Wednesday, September 30, 2020
from 7pm to 6am  
Medium
Nightly lane closures between 7 pm and 6 am  
10 
Construction
Connecting new services 
Lexington Street between Hudson and Chandler Avenues  Tuesday, September 29 to Tuesday, October 6, 2020
 
Low
Road closed 
16 
Construction
Upgrades at 344 Wellington Street 
Lyon Street between Wellington Street and Sparks Street  Sunday, September 20, 2020
Road closed for one day 7am to3pm 
Medium
Southbound lane closure 
14 
Construction
Road Resurfacing  
Macmillan Lane between Constance Bay Road and Allbirch Drive  Tuesday, August 25, 2020
Untill september 2019 
Low
Intermittent lane reductions 
5 
Construction
Resurfacing 
Malakoff Road between Roger Stevens Drive and Pollock Road  Wednesday, July 29, 2020
Untill september 2020 
Low
Intermittent lane reductions 
21 
Construction
Stage 2 LRT 
Manfield Avenue between Skead Street and Richmond Road  Monday, August 31 to Saturday, October 31, 2020
 
Low
Road closed 
15 
Construction
Watermain rehabilitation 
Mann Avenue between Range Road and Chapel Street  Monday, May 11 to Tuesday, December 15, 2020
 
Low
Road closed 
12 
Construction
Montreal Road Revitalization 
Marier Avenue between Deschamps Avenue and Montreal Road  Monday, May 25 to Wednesday, September 30, 2020
 
Low
Road closed 
12 
Construction
Combined Sewer Storage Tunnel (CSST) 
McLeod Street between Lyon Street and Kent Street  Tuesday, June 19, 2018 to Friday, October 16, 2020
 
Low
Road closed 
14 
Construction
Integrated road, sewer and watermain reconstruction 
Millbrook Crescent between Deer Park Road and Hillard Avenue  Sunday, September 20 to Thursday, December 31, 2020
 
Low
Road closed 
9 
Construction
Integrated road, sewer and watermain reconstruction 
Millbrook Crescent between Deer Park Road and Greenwich Avenue  Friday, September 25 to Friday, October 2, 2020
 
Low
Road closed 
9 
Construction
Rehabilitation of a bridge culvert 
Mitch Owens Road between Anderson Road and 9th Line Road   Monday, August 10 to Friday, September 25, 2020
 
Medium
Reduced to one lane with alternating traffic 
20 
Construction
Mobile Crane 
Monk Street between Thornton Avenue and Holmwood Avenue  Wednesday, June 3 to Wednesday, September 30, 2020
 
Low
Road closed 
17 
Construction
Road resurfacing 
Old Richmond Road between Roberston and Longwood   Wednesday, August 19, 2020
Until October 2020 
Low
Interminent Lane closures 
8 
Construction
Kanata South Links Capital Construction Project  
Old Richmond between Hope Side Road and West Hunt Club  Friday, February 1, 2019
Until November 2020 
Medium
Lane reductions 
8, 21, 23 
Construction
Culvert renewals 
Old Second Line Road between Murphy Side Road and Thomas A.Dolan Parkway  Wednesday, September 30 to Wednesday, October 14, 2020
 
Low
Road closed 
5 
Construction
Montreal Road Revitalization 
Olmstead Street between Levis Avenue and Montreal Road  Monday, May 25 to Wednesday, September 30, 2020
 
Low
Road closed 
12 
Construction
Watermain construction 
Quebec Street between Cummings and Borthwick avenues  Monday, May 25 to Thursday, October 15, 2020
 
Low
Road closed 
13 
Construction
Traffic calming 
Provence Avenue between Mulder Avenue and Valin Street  Thursday, October 1 to Wednesday, October 21, 2020
 
Low
Road closed 
2 
Construction
Combined Sewer Storage Tunnel (CSST) Project 
Queen Victoria Street between Stanley Avenue and Crichton Street  Wednesday, June 10 to Friday, October 9, 2020
 
Low
Road closed 
13 
Construction
MTO Project 
Ramsayville Road at Highway 417  Thursday, August 6, 2020
Until May 2022 
Medium
Intermittent off-peak lane reductions 
10 
Construction
Watermain rehabilitation 
Range Road between Somerset Street east and Mann Avenue  Monday, May 11 to Tuesday, December 15, 2020
 
Low
Road closed 
12 
Construction
Intersection Modification/Roundabout Construction 
Richardson Side Road between Huntmar Drive and Terry Fox Drive  Friday, October 2 to Monday, October 5, 2020
 

Road closed 
5 
Construction
Road work 
Richmond Road between Wavell Avenue and Windermere Avenue   Tuesday, September 8 to Tuesday, October 13, 2020
 
Medium
Reduced to one lane eastbound 
15 
Construction
Rideau Street and William Street renewal 
Rideau Street between Sussex Drive and Dalhousie Street  Wednesday, October 19, 2016
Until after station, utility, and streetscaping work is complete  
Medium
Rideau Street between Sussex and Dalhousie is closed to general traffic and cyclists, however remains open to buses and taxis. Pedestrian access to nearby businesses and residences remains available at all times.   
12 
Construction
Flagging operation 
Rideau Valley Drive between Rideau Narrows Drive and Island View Drive  Wednesday, July 1, 2020
Until late September 2020 
Medium
Road Closed 
9 
Construction
Combined Sewer Storage Tunnel (CSST) Project 
River Lane between Union and Keefer streets  Wednesday, June 10 to Friday, October 9, 2020
 
Low
Road Closed 
13 
Construction
Road resurfacing 
Riverside Drive between Hunt Club and Walkley roads  Thursday, September 3 to Friday, September 25, 2020
 
High
Intermittent lane closures 
16 
Construction
Sewer and Watermain Rehabilitation 
Rockhurst Road between Scott Street and Gould Street   Monday, September 28 to Friday, October 2, 2020
 
Medium
Road closed 
15 
Construction
Connecting new services 
Roosvelt Avenue between Kenwood Avenue and Princeton Avenue  Monday, September 21 to Friday, September 25, 2020
 
Low
Road closed 
15 
Construction
Crack sealing 
Rotbourne Road between Carp Road and death end  Monday, September 21 to Friday, September 25, 2020
 
Low
Reduced to one Lane with alternating traffic 
6, 21 
Construction
Watermain rehabilitation 
Russell Avenue between Somerset Street East and Osgoode Street  Monday, May 11 to Tuesday, December 15, 2020
 
Low
Road Closed 
12 
Construction
Road resurfacing 
Sandbay Street between Macmillan Lane and Ballie Avenue  Tuesday, August 25, 2020
Until September 2020 
Low
Intermittent lane closures 
5 
Construction
Sewer and Watermain Rehabilitation 
Scott Street (eastbound) between Island Park Drive and Smirle Avenue  Monday, August 17 to Monday, November 30, 2020
 
Medium
Eastbound direction closed 
15 
Construction
Scott Street Sewer and Water Rehabilitation  
Scott Street between Winona Avenue and Smirle Avenue  Tuesday, August 4, 2020
Until the end of 2020 
Medium
Intermittent lane closures  
15 
Construction
Connecting new services 
Sharp Street between King George Street and Columbus Avenue  Tuesday, July 14, 2020
Until the Fall  
Low
Road closed 
13 
Construction
LRT Stage 2 
Skead Street between Fraser Avenue and Mansfield Avenue  Monday, August 31 to Saturday, October 31, 2020
 
Low
Road closed 
15 
Construction
Capital Project - Combined Sewer Storage Tunnel (CSST) 
Slater Street at Kent Street  Sunday, January 15, 2017
Until spring 2020 
Medium
Lane reductions 
14 
Construction
Road resurfacing 
Strandherd Drive between Greenbank and Jockvale Road  Monday, September 21 to Saturday, September 26, 2020
 
Low
Intermitent lane closure - Nights work 
3 
Construction
Strandherd Drive widening 
Strandherd Drive between Maravista and Jockvale Road  Thursday, September 10, 2020
Untill Fall 2023 
Low
Intermitent lane closure 
3 
Construction
Road resurfacing 
St Laurent Boulevard between Montreal Road and Donald Street  Thursday, July 2 to Friday, November 6, 2020
Daily from 6 am to 3 pm and 7 pm to 6 am 
Low
Lane reductions in each direction 
11, 13 
Construction
Utility work 
Sussex Drive between Rideau and Goerge Streets  Tuesday, September 29 to Wednesday, September 30, 2020
Daily from 9am to 3am 
Medium
Reduced to one lane in each direction 
12 
Construction
Road resurfacing & Culvert repair 
Timm Drive between Moodie Drive and approximately 500 metres west of Moodie Drive  Monday, August 17, 2020
until mid-October 
Medium
Intermitent Lane reductions during Off-Peak hours 
8 
Construction
Road resurfacing  
Torbolton Street between Constance Bay Road and Macmillan   Wednesday, August 26, 2020
Untill September 2020 
Low
Intermittent lane closures 
5 
Construction
Culvert renewals 
Vances Side Road between Dunrobin Road Woodkilton Road  Monday, September 21 to Friday, October 2, 2020
 
Low
Road Closed 
5 
Construction
Kanata South Links Capital Construction Project  
West Hunt Club Road between Old Richmond Road and Moodie   Friday, February 1, 2019
Until November 2020 
Medium
Road closed 
8, 21, 23 
Construction
Sewer and Watermain Rehabilitation 
Western Avenue between Scott and Gould streets  Monday, September 21 to Friday, September 25, 2020
 
Medium
Road Closed 
15 
Construction
Watermain rehabilitation 
Wigan Drive between Inverness and Ness streets  Friday, May 15 to Friday, November 20, 2020
 
Low
Road Closed 
9 

[ top ]

For more information

City of Ottawa

  • Construction projects and local traffic issues: 3-1-1 (TTY: 613-580-2401)
  • Public transit alternatives: 613-741-4390 (TTY: 613-741-5280)
  • For information on future construction projects, view a list of construction projects by ward.