File Number T01-04-04-0502-CR

21 December 2004Date

 

Dear Sir/Madam

 

Re:  Bank Street – Rideau Canal to Wellington Street

        Functional and Preliminary Design

        Project Commencement Notice

        Public Advisory Committee

 

The Construction Services Division-West of the City of Ottawa has initiated a Functional and Preliminary Design assignment to define improvements for Bank Street between the Rideau Canal and Wellington Street.  This project is being planned under Schedule “B” of the Municipal Class EA Planning and Design Process as presented in the “Municipal Class Environmental Assessment; June 2000” as prepared by the Municipal Engineers Association.

 

The assignment will provide the City with a detailed scope of work, functional/preliminary designs and secure environmental clearance for the project in advance of detailed design and tender preparation.

 

Within the noted limits, the following requirements have been identified:

·        Rehabilitation/replacement of the watermain.

·        Rehabilitation/replacement of the sanitary, storm and combined sewers.

·        Rehabilitation/replacement of the road structure and sidewalks.

·        Rehabilitation/replacement of the traffic control signal system and street lighting.

·        Identify modifications and select corridors as required for private utilities.

 

Using the Downtown Urban Design Strategy 2020 as a basis, the City will develop a Streetscape Plan.

 

The project will also provide an opportunity to identify and implement minor traffic operational improvements, transit priority measures, changes to the roadway cross-sectional elements and other features deemed beneficial to the project.

 

The City has retained the services of Cumming Cockburn Limited (CCL) and David McManus Engineering Ltd. (DME), through a joint venture, to complete this assignment.  The Senior Project Manager is Mr. David Hatton of CCL, while Mr. Edson Donnelly is managing DME’s input.

16

Included in the activities is the formation of a Public Advisory Committee (PAC) that will provide valuable community input and feedback to the design team. By way of this letter a request is being extended to you, or your group (one person would attend for your group), to provide representation on the PAC.

 

The first meeting is scheduled for Monday, January 10, 2005 from 4:00 PM to 6:00 PM in the Richmond Room (2nd floor) of 110 Laurier Avenue (City Hall).

 

We have attached a Draft Terms of Reference for the PAC and a general project schedule to this letter to provide you with an overview of the project tasks and timing. Please review the Draft Terms of Reference prior to the meeting, so that they can be finalized subsequent to discussions at the initial PAC meeting.  Please note that there are four (4) formal PAC meetings proposed, with Sub-PAC’s being proposed, to meet as required, to identify opportunities and issues specific to the communities that lie north and south of the Queensway respectively.  

 

If you are interested in participating as a member of the PAC please contact:

 

Philippe Landry, P. Eng.

Project Manager

Construction Services West

City of Ottawa

6th Floor, 100 Constellation Crescent

Ottawa, Ontario   K2G-6J8

Phone: (613) 580-2424 (Ext. 23185)

Fax: (613) 580-2587

E-mail: Philippe.Landry@ottawa.ca

 

 

Finally, a copy of the draft advertisement that will appear in local newspapers providing project commencement notice to the community at large is attached.

 

In the meantime should you have any questions please do not hesitate to contact the undersigned.

 

Sincerely,Closing

 

 

 

Philippe Landry, P.Eng.

Project Manager
Construction Services Division West

 

Author’s Name & Title

Attach.  3

 