Report to/Rapport au:
Planning and Development
Committee/
Comité de l'urbanisme et de
l'aménagement
and Council/et au Conseil
22 February 2001/le 22
fevrier 2001
Submitted by/Soumis par: Ned
Lathrop, General Manager/Directeur générale Development Services Department/Services
d'aménagement
|
|
Ref N° ACS2001-DEV-APR-0020 |
SUBJECT: |
PROPOSED
AMENDMENTS TO THE OFFICIAL PLAN (1997) OF THE REGION OF OTTAWA-CARLETON, THE
CITY OF KANATA’S OFFICIAL PLAN, AND THE COREL CENTRE ZONING BY-LAW (BY-LAW
125-90), TO INCREASE THE AMOUNT OF
OFFICE SPACE AND REDUCE THE AMOUNT OF RETAIL AND HOTEL SPACE AND TO RELOCATE
A PORTION OF THE PARKING AREA; COREL CENTRE, CYCLONE TAYLOR BOULEVARD AND
PALLADIUM DRIVE. |
OBJET: |
MODIFICATIONS PROPOSÉES AU PLAN DIRECTEUR DE
1997 DE LA RÉGION D’OTTAWA-CARLETON, AU PLAN DIRECTEUR DE LA VILLE DE KANATA
ET AU RÈGLEMENT DE ZONAGE DU CENTRE COREL (RÈGLEMENT 125-90) AFIN D’AUGMENTER
LES LOCAUX À BUREAUX ET DE RÉDUIRE LES LOCAUX À MAGASINS DE DÉTAIL ET À HÔTEL
ET DE DÉMÉNAGER UNE PARTIE DU STATIONNEMENT (CENTRE COREL, BOULEVARD CYCLONE
TAYLOR ET PROMENADE PALLADIUM). |
REPORT
RECOMMENDATIONS
That the Planning and
Development Committee recommend that Council approve:
1. That an Amendment to the
former Region of Ottawa-Carleton and former City of Kanata Official Plans as
shown in Document 2 and an amendment to former City of Kanata’s Zoning By-law
No. 125-90 as shown in Document 3 with respect to lands adjacent to the Corel
Centre, be approved.
2. That this report be brought
to City Council’s meeting of 28 February 2001.
Que le comité de l’urbanisme et de l’aménagement recommande au conseil
municipal:
1. Qu’une modification aux Plans directeurs des anciennes Région
d’Ottawa-Carleton et Ville de Kanata, telle qu’indiquée dans le document 2, et
une modification au Règlement de zonage no 125-90 de l’ancienne
Ville de Kanata, telle qu’indiquée dans le document 3, en ce qui concerne les
terrains adjacents au Centre Corel soient approuvées.
2. Que le présent rapport soit présenté à la réunion du Conseil
municipal du 28 février 2001.
In December 2000,
applications were filed to Amend the Official Plan (1997) of the Region of
Ottawa-Carleton, the City of Kanata Official Plan and the Corel Centre Zoning
By-law (By-law 125-90). The Official
Plan Amendments as requested would increase the amount of office floor space
and reduce the amount of retail floor space.
The proposed Amendments would seek a policy change and do not entail a
redesignation of land. The proposed
Zoning By-law Amendment would also increase the amount of office floor space
while decreasing the retail and hotel space permitted within the various zones,
and would relocate these uses and a portion of the parking area within the
Corel Centre Lands.
The Corel Centre occupies a
40 ha. site in the southeast quadrant of the Highway 417 and Huntmar Drive
interchange. The Official Plan
Amendment applications pertain to policies concerning the entire Corel Centre
Lands, however, the Zoning By-law Amendments relate to lands generally located
along Palladium Drive and Cyclone Taylor Boulevard, as shown in Document 1.
DISCUSSION
The Corel Centre is
designated as a “Major Community Facility” (MCF) in the Regional and Kanata
Official Plans and as such, has specific policies relating to the type and
amount of development permitted. The
policies associated with the MCF designations indicate that free-standing
office and retail uses are limited to not more than 12000 m2 and
5580 m2 respectively. The
amendments as requested would modify the policies to permit up to 25200 m2
of office, while reducing the future retail component to 2900 m2
(Document 2). Although neither Official
Plan prescribe the size of the hotel, the implementing Zoning By-law (By-law
125-90) does contain such a provision.
The accompanying Zoning By-law Amendment application also seeks to amend
the provisions relating to the amount of office and retail floor space to be
consistent with the proposed Official Plan Amendments, and to reduce the size
of the hotel permitted on the site to 370 rooms from 400 rooms (Document
3). The proposed amendment also
relocates those uses within the Corel Centre Lands that are zoned to permit office,
retail and hotel land uses, as well as a portion of the parking area.
Development of the Corel
Centre site is determined by site-specific policies set by the Ontario
Municipal Board when it approved the Corel Centre in 1991. The initial application for the Corel Centre
sought approval of 24000 m2 of office space, 5580 m2 of
retail space and a 400 room hotel.
While the Board acknowledged the benefit of a mixed use development, the
final decision reduced the office portion of 12000 m2, in part to
ensure that there would be sufficient space on the site for parking, roads,
stormwater management and landscaping.
The Board indicated that the space initially proposed for offices should
be reserved until the space requirements for these other facilities could be
clearly established. It also directed
that piped services for the site be sized only to accommodate the approved
level of development.
The Corel Centre Facility
was constructed in 1995 and includes several restaurants, offices, meeting
rooms and a fitness facility. In
September 2000, Terrace Corporation received Site Plan Approval (Phase I &
II) for the development of two office buildings totaling 11997 m2
(net) which are scheduled for completion in Spring 2001. Therefore, with the development of Phase I
and II, the maximum amount of office space currently permitted under the
various planning documents will be achieved.
The balance of the Corel Centre Lands are vacant of any buildings or
structures, and are primarily used for parking to serve the Corel Centre
Facility.The absorption of lands suited for office development has accelerated
significantly in the former City of Kanata over the last few years. The average rate of absorption of business
park land over the last 15 years has been 8 hectares per year, however in the
past two years alone 44 hectares has been absorbed. With the recent increase in development activity has come the
demand for serviced land to respond to this growth in the office/high
technology sector. While ROPA 9 will
ultimately provide more land for this purpose, the need for more office space
exists now, while the sector is experiencing unprecedented growth. Phases I and II of the Corel Centre office
development are fully leased, and strong interest has been expressed for the
floor space that could be offered through Phases III and IV. Although these amendments would only add a
small portion of office space to the overall inventory, it would meet the
immediate needs of several office/high technology users.
Since the Corel Centre was
approved in 1991, there has been tremendous change and growth in the area. The unprecedented success of the high
technology sector has significantly influenced the type and pace of development
in the surrounding area. The Terry Fox
Business Park located immediately east of the Corel Centre has, over the last
few years, emerged as a focal point for the high technology industry. Companies such as DY4 Systems, Webplan,
Volex Systems and Nortel Networks Limited have, and are, currently constructing
facilities within the Park. PCM Kanata
South Inc. and Nortel Networks Limited have recently purchased the remaining
two large parcels of land, both of which will be developed for office/high
technology users. The lands north and south of the site are
currently undeveloped, however, in October 2000, Regional Council approved ROPA
9 that will expand the urban area by approximately 730 hectares. This urban expansion and redesignation of
lands will facilitate the development of business park and related uses. ROPA 9 will result in the Corel Centre Lands
being completely surrounded by urban development in the long term. The lands to the west within the interchange
have been approved for an automobile sales facility, office development and a
farmer’s market. Therefore, the
increased office floor space proposed for the Corel Centre Lands is appropriate
in the context of current and future surrounding development.
Within the subject site, the
additional office space and associated parking can be accommodated. The stormwater management ponds serving the
site, in combination with on-site controls as per the initial stormwater
management plan, can accommodate the change in use. The change in use will create a minor increase in peak hour
vehical trips, which can be readily accommodated by existing roads. Using current criteria the amount of
wastewater flow from the development as proposed does not exceed the peak flows
origninally approved for the site originally.
There is also sufficient water supply to handle the peak flows and fire
flow protection.
The proposed Zoning By-law amendment is both a text
and schedule change to By-law 125-90.
Firstly, the appropriate sections and zones would be amended to increase
the office space to 25200 m2 (net) with a reduction in the retail
space to 2900 m2, and, also, to reduce the capacity of the hotel to
370 rooms. Secondly, the amendment
redistributes the zones permitting office, retail, hotel and parking uses,
throughout the site. Document 1
indicates the proposed relocation of the land uses, which primarily affects
lands along Palladium Drive. The
Department is of the opinion that, over time, the office development and future
retail and hotel located adjacent to
Palladium Drive, will provide for a more pleasing streetscape and
pedestrian friendly enviornment. The
lands that are to be rezoned for the parking area to serve the Corel Centre,
although removed from the facility, are currently used as a parking area.
The reductions in the capacity of the hotel and the
amount of retail floor space are unlikely to impair the overall quality or
nature of development on the site. When
built, these facilities and others already within the Corel Centre will offer
goods and services to future employees of the office development.
CONSULTATION
Staff circulated the
applications to various interested agencies, abutting lands owners, and local
community associations requesting their input and comments on the proposed
amendments. None of the technical
agencies responded with any concerns or objections. The March Rural and Katimavik-Hazeldean Community Associations
responded, indicating a concern over the potential increase in traffic on the
adjacent road network. As indicated
earlier in the report the proposed change in land use will only increase the
traffic marginally and therefore, should not be an issue as the existing
roadway system has sufficient capacity.
Staff will be attending the February 5, 2001 meeting of the
Katimavik-Hazeldean Community Association and will bring forward at the
February 22, 2001 Planning and Development Committee meeting any new
information or comments. Notification
of the February 22, 2001 Public Meetings, as required by the Planning Act was
published in the Ottawa Citizen, The Sun, Le Droit and the Kanata Kourier
Standard on February 2, 2001.
FINANCIAL IMPLICATIONS
There are no financial
implications associated with this report.
ATTACHMENTS
Document 1 – Location Map
Document 2 – Draft Official Plan Amendments
DISPOSITION
Development
Services Department -- Complete Public
Notification process of adoption of the Official Plan and Zoning By-law
Amendments.
Location Map Document
1
Draft Official Plan Amendments Document
2
DRAFT
AMENDMENT 18
OFFICIAL PLAN (1997) OF THE
REGIONAL MUNICIPALITY OF OTTAWA-CARLETON
AMENDMENT 62
OFFICIAL PLAN OF THE
CITY OF KANATA
PURPOSE
The purpose of Amendments 18 and 62 is to increase
the amount of office development permitted at the Corel Centre, a National
Hockey League arena in the western area of the City of Ottawa, and reduce the
amount of permitted retail. The revised
mix of development can be accommodated on the site, with no increase in
requirements for transportation facilities or piped servicing.
The Corel Centre occupies a 40 ha site in the
southeast quadrant of Highway 417 and Huntmar Drive, designated as a Major
Community Facility in the official plans of both the Region of Ottawa-Carleton
and the City of Kanata, now the City of Ottawa. The site is within the rural area in both official plans,
although the Region of Ottawa-Carleton approved an amendment to its official
plan in 2000 which designates the site as Business Park and includes it in the
urban area. This amendment has been appealed
to the Ontario Municipal Board.
Development on the Corel Centre site is determined
by site-specific policies set by the Ontario Municipal Board when it approved
the Corel Centre in 1991. The initial
application for the Corel Centre sought 24,000 square metres of office space,
5,580 square metres of retail space and a 400-room hotel. While acknowledging the benefit of mixed use
at the site, the Board reduced the permitted amount of office space to 12,000
square metres, in part to ensure sufficient space on the site was available for
parking, roads, stormwater management, and landscaping. The space initially proposed for offices
should be reserved for these other uses at least until their site requirements
can be determined, the Board said. It
also directed that water and sewer services to the site be sized only to
accommodate the approved level of development.
The
arena was constructed in 1995 and includes several restaurants, meeting rooms
and a fitness facility. Two office
buildings totaling 11,997 square metres (net) received site plan approval in
September 2000 and are scheduled for completion in the spring of 2001.
The applicant, Terrace Corporation, has applied to amend the official plans and zoning by-law provisions to increase the permitted office space and decrease the permitted retail and hotel development. Office space is proposed to increase to 25,200 square metres from 12,000 square metres, with a reduction in retail space to 2,900 square metres from 5,580 square metres. The zoning bylaw amendment also seeks to reduce the size of a hotel permitted on the site to 370 rooms from 400 rooms, and relocates the office, retail, hotel and a portion of the parking area within the site. The area affected by the amendments to the official plans and zoning bylaw is shown on the map below.
Additional office development on the site is an
appropriate land use in the context of current and future surrounding
development. The area east of the
subject site is developing with a mix of retail, office, and high-technology
manufacturing uses. The land north and
south of the site is proposed for business park development attractive to the
high-technology industry. West of the
site, approvals are in place for an automobile sales facility, office space and
a farmers’ market.
Within the site, the additional office space and
associated parking can be accommodated.
The stormwater management ponds serving the site, in combination with
on-site controls as per the initial stormwater management plan, can accommodate
the change in use. The change in use
will create a minor increase in peak hour vehicle trips, which can be readily
accommodated by existing roads. Using
current criteria the amount of wastewater flow from the development as proposed
is within the peak flows approved for the site originally. There is sufficient water to provide peak
flow and fire flow requirements.
The reduction in the size of hotel and amount of retail on the site is unlikely to impair the overall quality or nature of development on the site. When built, these facilities and others already within the Corel Centre will provide goods and services to future office employees.
1.
Policy
10 d) in Section 3.5.2 is hereby amended by deleting the figure, “12,000” from
the phrase reading “office space not exceeding 12,000 square metres” and
inserting the figure “25,200”. Policy
10 d) is further amended by deleting the figure “5,580” from the phrase “retail
space not exceeding 5,580 square metres” and inserting the figure “2,900”. The policy as amended reads:
“d) the
Major Community Facility shall consist of a National Hockey League Arena with a
capacity that shall not exceed 18,500 seated and standing and uses accessory
thereto, and may have such separate ancillary facilities as a hotel, office
space not exceeding 25,200 square metres, and retail space not exceeding 2,900
square metres, and associated parking;”
AMENDMENT 62 CITY OF KANATA
OFFICIAL PLAN
1. That
Subsection 4.9.2 Permitted Uses is
hereby amended by deleting the reference to “12,000 m2” in the fifth line and inserting “25,200 m2” in its place and
deleting the reference to “5,580 m2”
in the sixth line and inserting “2,900
m2 in its place. The policy
as amended reads:
“ The primary use permitted
in the Major Community Facility designation shall be an NHL arena with a
capacity that shall not exceed 18,500 people seated and standing and uses
accessory thereto. Separate ancillary
uses such as a hotel, office space not exceeding 25,200 m2, retail
space not exceeding 2,900 m2, associated parking and transit
facilities may also be permitted. No
uses ancillary to the NHL arena shall be permitted on the subject lands until
50% of the above-ground structure of the NHL arena, as certified by the project
architect, has been constructed. [OPA 7, June 22, 1992]”
2. That policy a) of Subsection 4.9.3.9 Office
Commercial is hereby amended by deleting the reference to “12,000 m2” in the second
line and inserting “25,200 m2” in its
place. The policy as amended reads:
“a) a free standing office uses limited to not more than
25,200 m2”
3. That policy a) of Subsection 4.9.3.10 Retail Centres is hereby amended by
deleting the reference to “5,580 m2
in the second line and inserting 2,900
m2 in its place. The policy
as amended reads:
“a)
free standing retail uses which shall not exceed 2,900 m2. [OPA 7, June 22, 1992]
Draft Zoning By-law
Amendment Document
3
BY-LAW NO. -01
THE
CORPORATION OF THE CITY OF OTTAWA
BEING a By-law to amend By-law No. 125-90 of the
former City of Kanata, now the City of
Ottawa.
WHEREAS By-law No. 125-90 is a By-law to regulate
the use of lands and the erection, use, bulk, height, location, size, floor
area and spacing of buildings and structures in the City of Ottawa therein
defined:
AND WHEREAS the Council of the City of Ottawa deems
it desirable to amend By-law 125-90, for the purpose of making the following
text changes and changing the zoning on lands described as Blocks 5, 6 and part
of Block 11 on Registered Plan 4M-818.
NOW THEREFORE, the Council of the Corporation of the
City of Ottawa enacts as follows:
1.
THAT Section 5.1(c) of
Section 5 GENERAL PROVISIONS FOR ALL ZONES, of By-law 125-90, be amended, by
deleting the figures “5,580 m2 and 12,000 m2” from the
phrase reading “retail space not exceeding 5,580 m2, office space
not exceeding 12,000 m2”” and inserting the figures “2,900 m2
and 25,200 m2”.
2.
THAT Subsection 7.2.1(h) of
Section 7 MAJOR COMMUNITY FACILITY-2 ZONE (MCF-2), of By-law 125-90, be
amended, by deleting it in its entirety and replacing it with the following:
“(h) Maximum number of rooms 370 rooms”
3. THAT Subsection 8.2.1(h) of Section 8 MAJOR COMMUNITY FACILITY-3 ZONE
(MCF-3), of By-law 125-90, be amended, by deleting it in its entirety and
replacing it with the following:
“(h) Maximum Net
Floor Area 25,200 m2”
4. THAT Subsection 9.2.1(h) of Section 9 MAJOR
COMMUNITY FACILITY-4 ZONE (MCF-4), of By-law 125-90, be amended, by deleting it
in its entirety and replacing it with the following:
“(h) Maximum
Net Floor Area 2,900 m2”
Page 2 of By-law -01
5. That Schedule “A” of By-law 125-90,as
amended, is hereby further amended by deleting the designation “MCF-P, MCF-2
and MCF-4” on said Schedule “A” insofar
as it relates to the lands shown on Schedule
“A” to this By-law and
substituting therefore the zoning designations “MCF-P, MCF-2 and MCF-3” as
shown on Schedule “A” to this By-law.
6. This By-law shall come into full force and
effect on the date of passage by Council subject to the provisions of Section
17 and 34 of the Planning Act R.S.O. 1990, as amended from time to time.
ENACTED
AND PASSED in open Council this day
of 2001.
____________________ _____________________
Clerk,
Pierre Pagé Mayor, Bob Chiarelli