Branch/Division |
Vehicle
Description |
Qty |
Project Number |
Estimated Capital
Cost |
Operating Impact |
2011 Requirement
Prorated |
2012 Balance |
Programming
Rationale |
|
|
Roads and Traffic Operations and Maintenance |
|
|
South
Roads |
Single Axle
Combo c/w plow and wing |
1 |
|
$ 270,840.00 |
$ 59,373.00 |
$
14,429 |
$
44,944 |
Addition of
Strandherd extension, widening of Woodroffe, Prince of Wales, Strandherd
bridge and additional roads in subdivision off Jockvale/ Bren Maur |
|
|
South Roads |
Single
Axle Combo c/w plow and wing |
1 |
|
$ 270,840.00 |
$ 59,373.00 |
$
14,843 |
$
44,530 |
Additional
roads to maintain in Manotick Minto subdivision, Half Moon Bay, Riverside
South, Limebank Road widening |
|
|
South Roads |
Asphalt
Hox Box Trailer |
1 |
|
$
30,528.00 |
$ 10,114.00 |
$
5,057 |
$
5,057 |
Increased demand on surface treated roads and
availabity of year round hot patching material |
|
|
Special Operations Roads |
Four
Wheel Drive Tractor complete with Snowplow Blade and Snowblower with high
chute and side discharge capability (drum rotation). |
1 |
|
$ 122,112.00 |
$ 22,440.00 |
$
5,610 |
$
16,830 |
City
wide growth in Transitway and Park and Ride inventory of 7.6 lane kms and
1,041 Parking Stalls is expected for 2011.
In order to service the increase in roadway and parking facilities
inventory, an extra tractor with blade and snowblower unit is required to
complete winter plowing and removal operations to meet maintenance quality
standards. |
|
|
Core Roads |
Asphalt
Hox Box Trailer |
1 |
|
$
30,528.00 |
$ 10,114.00 |
$
5,057 |
$
5,057 |
Increased
demand for asphalt-related repairs on hard surface roads, and availability of
year-round hot asphalt material. |
|
|
Core Roads |
Sidewalk scrubber was 50. |
1 |
|
$
80,000.00 |
$ 15,000.00 |
$
7,500 |
$
7,500 |
Increased
demand to scrub sidewalks in the Byward Market and BIA areas. |
|
|
West Roads |
Tandem
Axle Combo spreader c/w one-way plow and cable wing |
1 |
|
$ 305,280.00 |
$ 66,925.00 |
$
16,731 |
$
50,194 |
Additional
snow clearing and road salting/sanding associated with the additions of the
Terry Fox extension, and the widening of March and Hazeldean roads. |
|
|
West Roads |
Asphalt
Hot Box Trailer |
1 |
|
$
30,528.00 |
$ 10,114.00 |
$
5,057 |
$
5,057 |
Increased demand on surface treated roads, and
availabity of year round hot patching material. |
|
|
East Roads |
Single
Axle Combo c/w plow and wing |
1 |
|
$ 270,840.00 |
$ 59,373.00 |
$
14,843 |
$
44,530 |
Additional
hard surfaced roads added to inventory through gravel road upgrades - O'Toole
Rd, French Hill Rd, Smith Rd, Tenth Line Rd, and Willhaven Rd. |
|
|
East Roads |
One
(1) Ton Crew cab Pickup Truck |
1 |
|
$
40,000.00 |
$ 11,880.00 |
$
5,940 |
$
5,940 |
Increased
demand for ditching on upgraded gravel to hard surface roads to improve
performance of road. |
|
|
East Roads |
Tandem
Hot Box Trailer |
1 |
|
$
30,528.00 |
$ 10,114.00 |
$
5,057 |
$
5,057 |
Increased
demand for asphalt-related repairs on hard surface roads, and availability of
year-round hot asphalt material. |
|
|
East Roads |
Crew
cab Landscape dump truck , towing
package |
1 |
|
$
80,000.00 |
$ 39,500.00 |
$
9,875 |
$
29,625 |
Year-round
use as tow unit to transport staff and haul andem Hot Box Trailer. |
|
|
Signs and Pavement Markings |
1
Ton PU Truck- Automated Cone Holder Machine |
1 |
|
$ 132,288.00 |
$ 26,771.00 |
$
10,001 |
$
16,770 |
Purchase
is required to address a safety concern with the way we place and pick-up
traffic cones during pavement marking opeartion. Issue has been identified
through Service Excellence initiative and through Occupation Health &
Safety Committee. |
|
|
Signals |
2
Ton Trailer ( 5,000 lbs. ) |
1 |
|
$
6,614.00 |
$
2,306.00 |
$
1,153 |
$
1,153 |
Increasing
traffic signals network has resulted in the saturation of the only other
existing flatbed unit within Traffic Operations Branch. This additional trailer will support the
continued expansion of the traffic signals network and will permit staff to
transport traffic signal materials to new and existing sites. |
|
|
Signals |
Aerial
Device - non material handler - Articulating telescopic - Low profile chassis
- |
1 |
|
$ 183,168.00 |
$ 37,832.00 |
$
8,847 |
$
28,985 |
Year
round use as unit for the proposed 2011 "Growth" Signal Maintenance
Crew as result of the increase in number of new Traffic Signals and the
amount of material/equipment used in Signal System. |
|
|
Traffic Management and Operational Support |
|
|
Traffic Management |
1/2 Ton Extended
PU Trucks |
4 |
|
$ 122,112.00 |
|
$ - |
$ - |
Replace
(4) Lease vehicles (B2-6604, B2-6605,
B2-6606 and B2-6607), due July 2011, with (4) new vehicles. Short box
required - factors: turning radius, length of vehicle. These vehicles will be
working in the downtown core, Glebe areas etc. Background information provided in
report. Moving to own these vehicles
rather than leasing will be advantageous because the City will avoid paying
high lease rates, over usage penalties, and damage penalties when the vehicle
is returned to the dealer |
|
|
|
|
|
|
|
|
|
TOTAL |
19 |
|
$2,006,206 |
$441,229 |
$130,001 |
$311,229 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|