Branch/Division |
Vehicle
Description |
Qty |
Project Number |
Estimated Capital
Cost |
Operating Impact |
2011 Requirement
Prorated |
2012 Balance |
Programming
Rationale |
Standing Committee |
Paramedic Services |
Paramedic
Response Unit Equivalents |
2 |
|
$309,350 |
$140,000 |
$60,000 |
$80,000 |
Fleet
increase to correspond with Paramedic staff growth. |
Staff
increase |
|
|
|
|
|
|
|
|
|
|
Fire Services |
Kanata West
Station |
0 |
|
$0 |
$140,000 |
$140,000 |
$0 |
Operating
funding for growth units already approved in previous years - 1 pumper for 12
months ($80K) and 1 aerial for 6 months (60K) |
|
South Barrhaven Station |
0 |
|
$0 |
$70,000 |
$70,000 |
$0 |
Operating funding for growth units already
approved in previous years - 1 pumper ($30K) and 1 aerial ($40K) for 4
months |
|
|
|
|
|
|
|
|
|
|
|
Buildings-Special Operation Division ( Attn: Ray Summers ) |
Scissor
Lift |
1 |
|
$15,264 |
$3,627 |
$1,814 |
$1,814 |
New Ministry of labour guidelines now require
staff to utilize personnel-lifts vs. ladders to service many of the thousands
of HVAC units within the City. |
|
Buildings-Special Operation Division ( Attn: Ray Summers) |
Covered
Trailer |
1 |
|
$9,158 |
$2,543 |
$1,272 |
$1,272 |
A
covered trailer is required to transport the scissor lift across the City to
over 250 sites. It protects the scissor lift from the elements while in
transit and external storage at the works yards. |
|
Buildings - South |
1/2
Ton PU Truck |
1 |
|
$51,390 |
$22,622 |
$11,311 |
$11,311 |
Additonal
vehicle required to service new growth and expanded existing facitlities |
|
Buildings - West |
Scissor
Lift for Golbourne Rec Complex |
1 |
|
$15,264 |
$3,627 |
$1,814 |
$1,814 |
Growth
in Goulbourne Recreation Center requires lift to access high reaching areas
to clean , change lights , etc. |
|
Buildings - West |
3/4
Ton Truck for Golbourne Rec Complex |
1 |
|
$40,704 |
$15,480 |
$7,740 |
$7,740 |
Additonal
vehicle required to service new growth and expanded existing facitlities |
|
Parks - Core |
Scissor
Lift |
1 |
|
$15,264 |
$3,627 |
$1,814 |
$1,814 |
The
Ministry's increased safety requirementin in recent years requires our staff
to utilize personnel lifts instead of ladders to service much of the
thousands of HVAC systems throughout the the Core Division facilities .This
growth lift will address the operational needs existing in the larger
complexes and centres. |
|
Parks - Core |
Mini
Garbage Packer |
1 |
|
$113,971 |
$25,597 |
$6,399 |
$19,198 |
Similar
to 19-1112 c/w A/C |
|
Parks - Core (Catherine) |
Fertilizer
Spreader- 3 Point Hitch |
1 |
|
$6,106 |
$1,954 |
$977 |
$977 |
Enhanced
turf management is required to improve the condition of the sports fields
playing surface. Growth vehicles are required for this enhanced intergrated
turf management strategy to satify increase demand for useage. |
|
Parks - Core (Catherine) |
Single
Axle Tilt and Load trailer |
1 |
|
$8,141 |
$2,484 |
$1,242 |
$1,242 |
Enhanced
turf management is required to improve the condition of the sports fields
playing surface. Growth vehicles are required for this enhanced intergrated
turf management strategy to satify increase demand for useage. |
|
Parks - Core (Catherine) |
Reciprocating Aerator |
1 |
|
$25,440 |
$6,572 |
$3,286 |
$3,286 |
Enhanced
turf management is required to improve the condition of the sports fields
playing surface. Growth vehicles are required for this enhanced intergrated
turf management strategy to satify increase demand for useage. |
|
Parks - Core (Catherine) |
Sand Sifter |
1 |
|
$19,334 |
$4,241 |
$2,121 |
$2,121 |
To
maintain playground sand for new and upgraded play structures. |
|
Parks - Core (Catherine) |
Overseeder
( Silt seeder ) |
1 |
|
$50,880 |
$7,349 |
$3,675 |
$3,675 |
Enhanced
turf management is required to improve the condition of the sports fields
playing surface. Growth vehicles are required for this enhanced intergrated
turf management strategy to satify increase demand for useage. ( see
Bannerman Silt seeder B-PPS-6 ) |
|
Parks - Core (Bloomfield) |
Bannerman Master Ball Diamond
Groomer |
1 |
|
$9,565 |
$3,184 |
$1,592 |
$1,592 |
Reduce
lease requirements |
|
Parks - Core (Bloomfield) |
Gravely PM320HD
ride on mower |
1 |
|
$13,229 |
$6,449 |
$3,225 |
$3,225 |
Required
for Britania Park ( if not we we need to lease ) |
|
Parks - Core (Bloomfield) |
Service
Truck |
1 |
|
$50,880 |
$13,197 |
$3,299 |
$9,898 |
Required
for new Minor Maintenance employee ( see B4-2168 ) |
|
Parks - East (Cyrville) |
Aerator |
1 |
|
$28,289 |
$5,266 |
$2,633 |
$2,633 |
Aerator
is required as part of the Integrated Turf Management Program and the
pesticide ban in Ontario. This attachment decompacts the soil and can aerate
at depths up to 10" with litle surface disruptiion |
|
Parks - East (Cyrville) |
Barber
Sand Sifter |
1 |
|
$21,370 |
$4,512 |
$2,256 |
$2,256 |
To
maintain playground sand in the growth Parks. |
|
Parks - East (Trim) |
22'
Trailer ( 12,000 lbs ) |
1 |
|
$14,246 |
$3,193 |
$1,597 |
$1,597 |
Trailer required to transport
new growth Kubota F3680 FD. |
|
Parks - East (Trim) |
Kubota
F3680 FD |
1 |
|
$20,352 |
$7,395 |
$3,698 |
$3,698 |
To maintain
grass cutting service in growth Parks. |
|
Parks - East (Trim) |
Smithco
Ball Diamond Groomer |
1 |
|
$25,440 |
$5,674 |
$2,837 |
$2,837 |
To
maintain Ball Diamond Groomer in growth Parks. |
|
Parks - East (Trim) |
Rear
mounted rear facing blower for Tractor |
1 |
|
$14,246 |
$3,942 |
$1,971 |
$1,971 |
Required
for new buildings snow removal requirements. |
|
Parks - East (Cyrville) |
12'
Tilt Bed Trailer for Sifter |
1 |
|
$9,158 |
$2,579 |
$1,290 |
$1,290 |
Trailer
required to transport new growth Barber and Sifter. |
|
Parks - East (Cumberland) |
Tractor |
1 |
|
$91,584 |
$22,272 |
$5,568 |
$16,704 |
Specs
to be provided. |
|
Parks - South |
Aerator |
1 |
|
$23,405 |
$4,617 |
$2,309 |
$2,309 |
Attachment
required to support additional new sports field and the Intergrated turf
management program. |
|
Parks - South |
17'
Woods 9204RD |
1 |
|
$18,317 |
$5,987 |
$2,994 |
$2,994 |
Mower
attachment required for Half Moon Bay community and Riverside South growth
areas. New parkland coming on line. |
|
Parks - South |
2
Yd. Electric Salt Spreader |
1 |
|
$12,211 |
$1,346 |
$673 |
$673 |
Attachment
required for winter maintenance of facility lots.. |
|
Parks - South |
16'
Landscape Trailer |
1 |
|
$12,211 |
$2,827 |
$1,414 |
$1,414 |
Growth in the
South Division has seen the construction of more parks and boulevards .
Additional equipment required to service these growth areas. |
|
Parks - South |
10' Landscape
Trailer |
1 |
|
$10,176 |
$2,638 |
$1,319 |
$1,319 |
Growth
in the South Division has seen the construction of more parks and boulevards
. Additional equipment required to service these growth areas. |
|
Parks - South |
Brillion
Precision Seeder |
1 |
|
$12,720 |
$2,874 |
$1,437 |
$1,437 |
Attachment
required for seeding of new parks. |
|
Parks - South |
Landscape
Groomer/ Cultivator |
1 |
|
$7,123 |
$868 |
$434 |
$434 |
Attachment
required for preparing soil for seeding of new parks. |
|
Parks - South |
Drag Harrow |
1 |
|
$3,053 |
$387 |
$194 |
$194 |
Attachment
required for preparing soil for seeding of new parks. |
|
Parks -
West |
3/4 Ton Van Utility Body |
1 |
|
$30,528 |
$11,381 |
$5,691 |
$5,691 |
Growth in the
West Division has seen the construction of more Parks and boulevards.
Additional equipment required to service these growth areas. |
|
Parks - West |
16' Landscape
trailer |
1 |
|
$12,211 |
$2,827 |
$1,414 |
$1,414 |
Growth in the
West Division has seen the construction of more Parks , pathways, sportfield
and boulevards. Additional equipment required to service these growth areas. |
|
Parks -
West |
16' Landscape trailer |
1 |
|
$12,211 |
$2,827 |
$1,414 |
$1,414 |
Growth in the
West Division has seen the construction of more Parks , pathways, sportfield
and boulevards. Additional equipment required to service these growth areas. |
|
Parks - West |
16' Landscape
trailer |
1 |
|
$12,211 |
$2,827 |
$1,414 |
$1,414 |
Growth in the
West Division has seen the construction of morepParks and boulevards.
Additional equipment required to service these growth areas. |
|
Parks - West |
Reciprocating
Aerator |
1 |
|
$25,440 |
$6,572 |
$3,286 |
$3,286 |
Aerator
is required as part of the Integrated Turf Management Program and the new
pesticide ban in Ontario. This attachment decompacts the soil and can aerate
at depths up to 10" with litle surface disruptiion |
|
Parks - West |
Aerator |
1 |
|
$23,405 |
$4,617 |
$2,309 |
$2,309 |
Attachment
required to support additional new sports field and the Intergrated Turf
Management program. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
39 |
|
$1,193,847 |
$579,981 |
$369,724 |
$210,257 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|