2. 90 George Street – Proposed Valet Parking 90,
Rue George - Service Voiturier Proposé |
That Council approve:
1. That the Director of Real Estate Partnership and Development Office be authorized to enter into a License of Occupation agreement on behalf of the City with the Owner in accordance with the terms and conditions as set out in Document 1, which terms and conditions will provide a 10 year term for the License of Occupation agreement with a nominal yearly fee of $1.00 for the 10 year term, which will be subject to renegotiation for further renewals based on applicable City land lease policy in place thereafter.
2. That the Deputy City Manager, Infrastructure Services and
Community Sustainability provide for the issuance of the required road cut
permit to allow the Owner to undertake the proposed improvements subject to all
technical matters related to the works being to the satisfaction of the Deputy
City Manager and subject to any securities as set out in Document 1 being
posted.
3. That the
following condition from the “Contents of License of Occupation Agreement”
(Document 1):
“Should the City and/or
Public Utilities operating within the Public Right of Way decide to renew or
repair infrastructure below the surface of the Lands, the Owner must remove the
improvements and repair or renew the surface of the lands at its expense upon
the time specified within written notice from the City.”
be
replaced with:
"Should
the City or utility companies decide to renew or repair infrastructure below
the surface of the lands, the City or utility company is responsible for
compacting while the owners are responsible for removing and replacing the
pavers within time periods specified in written notice from the City.
Que le Conseil
approuve :
1. Que le directeur du Bureau
des partenariats et du développement en immobilier soit autorisé à délivrer un permis d’occupation
au Propriétaire au nom de la Ville conformément aux modalités établies dans le
document 1, lesquelles prévoient que le permis d’occupation durera 10 ans
moyennant des frais annuels modiques de 1 $ pendant ces 10 ans et
qu’il pourra être renouvelé en fonction de la politique municipal en vigueur concernant
les baux fonciers après de nouvelles négociations par la suite.
2. Que
le directrice municipale adjointe, Services d’infrastructure et de la viabilité
des collectivités, permette la délivrance du permis de terrassement requis pour
que le Propriétaire procède aux améliorations proposées, sous réserve de la
conformité de tous les éléments techniques liés aux travaux aux règles, à la
satisfaction du directeur général, et de l’affichage des valeurs, comme le
stipule le document 1.
3. Que la condition suivante du document
1, Contenu de l’accord concernant le
permis d’occupation,
« Si la Ville ou les Services publics
exploitant l’emprise publique décident de procéder à la réfection de
l’infrastructure souterraine, le propriétaire devra retirer tout ce qu’il aura
lui-même installé et réparer ou renouveler la surface à ses frais, selon
l’échéancier figurant dans l’avis écrit qui lui aura été transmis. »
soit remplacée par :
« Si la Ville ou les
entreprises de services publics décident de procéder à la réfection de l’infrastructure
souterraine, elles devront procéder au compactage, alors que le propriétaire
aura la responsabilité de retirer et de replacer le pavé, selon l’échéancier
figurant dans l’avis écrit qui lui aura été transmis. »
Documentation
1. Transportation Committee report dated
18 December 2009, English and French (ACS2010-CCS-TRC-0002).
2. Extract of Draft Minute, 6 January 2010
(Immediately follows the French report).
Comité des transports
18 December
2009 / Le 18 décembre 2009
Submitted by / Soumis par : Georges Bédard, Councillor / Conseiller
SUBJECT:
|
|
|
|
OBJET :
|
That the Transportation
Committee recommend that Council approve:
1. That the Director of Real Estate Partnership and Development Office be authorized to enter into a License of Occupation agreement on behalf of the City with the Owner in accordance with the terms and conditions as set out in Document 1, which terms and conditions will provide a 10 year term for the License of Occupation agreement with a nominal yearly fee of $1.00 for the 10 year term, which will be subject to renegotiation for further renewals based on applicable City land lease policy in place thereafter.
2. That
the Deputy City Manager, Infrastructure Services and Community Sustainability
provide for the issuance of the required road cut permit to allow the Owner to
undertake the proposed improvements subject to all technical matters related to
the works being to the satisfaction of the Deputy City Manager and subject to
any securities as set out in Document 1 being posted.
Que le Comité des transports recommande au
Conseil d’approuver :
1. Que le directeur du Bureau
des partenariats et du développement en immobilier soit autorisé à délivrer un permis d’occupation
au Propriétaire au nom de la Ville conformément aux modalités établies dans le
document 1, lesquelles prévoient que le permis d’occupation durera 10 ans
moyennant des frais annuels modiques de 1 $ pendant ces 10 ans et
qu’il pourra être renouvelé en fonction de la politique municipal en vigueur
concernant les baux fonciers après de nouvelles négociations par la suite.
2. Que le directrice
municipale adjointe, Services d’infrastructure et de la viabilité des
collectivités, permette la délivrance du permis de terrassement requis pour que
le Propriétaire procède aux améliorations proposées, sous réserve de la
conformité de tous les éléments techniques liés aux travaux aux règles, à la
satisfaction du directeur général, et de l’affichage des valeurs, comme le
stipule le document 1.
On 2 December 2009, the aforementioned Notice of Motion was submitted for consideration at a subsequent meeting of the Transportation Committee. The full Motion is attached as Document 3 to this report.
The Owner of 90 George Street Ltd., and 135 Rideau Street obtained site plan approval for the construction of a mixed commercial residential condominium, provided that the Owner:
The improvements provided for specialized landscaping and surface treatments to distinguish the forecourt area in front of 90 George Street from the remaining parking courts along George Street, so as to establish a forecourt area for the commercial and residential condominium. The Owner wishes to undertake additional improvements to this forecourt area, as reflected on Document 2. The effect of these further improvements would be to have the forecourt further distinguished and separated from the remaining parking courts along George Street.
Further, the Owner also wishes to be given the right to use and maintain the improved forecourt to manage drop off and pick-up activities and a valet parking service to be provided in conjunction with the commercial/residential condominium at 90 George/135 Rideau.
The improvements proposed are seen as being beneficial from an aesthetic, safety and operational perspective to ensure that activities associated with drop-off and pick-up and the valet parking service will be managed for the benefit of residents of the residential condominium, staff and customers of the commercial condominium and the public who will use the public parking provided. It is considered reasonable in view of these benefits, to provide for a nominal yearly fee of $1.00 for a term of 10 years which would provide an amount equal to the capital cost of the improvements.
The proposed improvements have been reviewed and accepted by staff, subject to the Owner entering into a License of Occupation agreement with the City that sets out obligations on the part of the Owner to improve and maintain the lands and provides to the Owner the right to manage and operate activities in the forecourt. The Owner is prepared to enter into such an agreement but wishes to have the fee waived in consideration of the investment being made in the proposed improvements, estimated at $260,000. The normal fee in accordance with Council policy would provide for a yearly payment to the City of $26,000 based on current market rent.
The proposed improvements are supported by the ByWard Market and Rideau Street BIAs.
Site plan approval for 90 George Street was negotiated and approved prior to the Municipal Parking Management Strategy’s approval by Council in April 2009. The site plan approval provides for the elimination of 6 public parking spaces in the parking court in front of 90 George Street and requires that 20 publicly accessible parking spaces be provided as part of the development. It is understood that the proposed License of Occupation Agreement is intended to allow the owner to improve and manage vehicular activity in the public ROW in front of 90 George, support the proposed valet parking service and accommodate pick-up and drop-off activities associated with the uses within 90 George. The Parking Management Strategy therefore will not apply to or govern either the parking in the ROW that will serve the 90 George Street development or the parking that will be accessible to the public that is located within the development. These spaces will be managed and controlled by the owner as publicly accessible commercial parking.
The agreement reached through the site plan approval
process would today not be supported by the Parking Management Strategy.
However, as this arrangement pre-dates the Parking Management Strategy and, in
recognition of the potential overall benefit to the community of having this
proposal formalized through a License of Occupation Agreement and recognizing
that the Ward Councillor and BIA’s are in support of this, Public Works staff
see the proposed License of Occupation as concluding understandings reached
through the site plan approval process related to the function of the right of
way in front of 90 George and are in support of having these understandings
finalized as set out in this report. Public Works staff would however, request
that the terms of the agreement ensure that the design and signage make it
obvious to the public that the parking is publicly accessible. Further, should
the developer wish to reintroduce metered or non-metered public parking within
the right-of-way, it should be managed by the Parking Branch as part of the
municipal public parking system.
Infrastructure
Services
Staff have worked with the Councillor in drafting Document three. Issues identified by staff for the use of the Public Right of Way as part of this private development have been identified and dealt with in the conditions for the License of Occupation Agreement. Infrastructure Services and Community Sustainability supports the motion.
Planning and Growth Management
Staff have worked with the Councillor in drafting Document 3.
Staff have worked with the Councillor on
this agreement and support the motion.
After the agreement expires, staff will negotiate with the building
owner renewals based on the applicable
City land lease policy in place thereafter.
There are no rural implications associated with this Motion.
There are no legal/risk management impediments to the implementation of this Report's recommendations.
There are no financial implications.
Document 1 - Contents of the License of Occupation Agreement
Document 2 – Forecourt Grading and Drainage Plan
Document 3 – Motion submitted on 2 December 2009
Subject to Council approval:
1. The Director of Real Estate Partnership and Development Office to enter into a License of Occupation agreement with the Owner, on behalf of the City, in accordance with the terms and conditions as set out in Document 1.
2. The Deputy City Manager of Infrastructure Services and Community Sustainability will provide the required road cut permit to allow the Owner to undertake the proposed improvements.
Document 1
Document 3
90 George Street –
Notice of Motion
WHEREAS 90 George Street Ltd the owner of the lands known municipally as 90 George Street and 135 Rideau Street (the “Owner”) obtained Site plan Approval for the construction of a mixed commercial residential condominium;
AND WHEREAS the Site plan approval provided the Owner undertake improvements to the parking court within the right-of-way (ROW) in front of 90 George Street that resulted in the elimination of 6 parking spaces and included a requirement for the Owner to provide a minimum 20 parking spaces for use by the public within the underground parking garage of the condominium to offset the elimination of these 6 parking spaces;
AND WHEREAS the improvements provided for specialized landscaping and surface treatments to distinguish the forecourt area in front of 90 George Street from the remaining parking courts along George Street so as to establish a forecourt area for the commercial and residential condominium;
AND WHEREAS the Owner wishes to undertake additional improvements to this forecourt area in front of 90 George Street as reflected on Document 2;
AND WHEREAS the effect of these further improvements would be to have the forecourt further distinguished and separated from the remaining parking courts along George Street;
AND WHEREAS the Owner also wishes to be given the right to use and maintain the improved forecourt to manage drop off and pick-up activities and a valet parking service to be provided in conjunction with the commercial/residential condominium at 90 George/135 Rideau;
AND WHEREAS the proposed improvements will not result in any further elimination of on-street parking beyond the six spaces for which approval has been given as part of the Site Plan Approval;
AND WHEREAS the proposed improvements are supported by the ByWard Market and Rideau Street BIAs;
AND WHEREAS the proposed improvements have been reviewed and accepted by City staff subject to the Owner entering into a License of Occupation agreement with the City that sets out obligations on the part of the owner to improve and maintain the lands and provides to Owner the right to manage and operate activities in the forecourt;
AND WHEREAS the Owner is prepared to enter into such an agreement but wishes to have the fee waived in consideration of the investment being made in the proposed improvements, estimated at $260,000;
AND WHEREAS the normal fee in accordance with Council policy would provide for a yearly payment to the city of $26,000 based on current market rent;
AND WHEREAS the improvements proposed are seen as being beneficial from an aesthetic, safety and operational perspective to ensure that activities associated with drop-off and pick-up and the valet parking service will be managed for the benefit of residents of the residential condominium, staff and customers of the commercial condominium and the public who will use the public parking provided;
AND WHEREAS it is considered reasonable in view of these benefits, to provide for a nominal yearly fee of $1.00 for a term of 10 years which would provide an amount equal to the capital cost of the improvements;
AND WHEREAS the Owner wishes to undertake the proposed works before the end of the 2009 construction season, if possible, so as to implement the management of drop off and pick-up activities and the valet parking service for the commercial/residential and the public;
THEREFORE BE IT RESOLVED that the Director of Real Estate Partnership and Development Office be authorized to enter into a License of Occupation agreement on behalf of the City with the Owner in accordance with the terms and conditions as set out in Document 1 which terms and conditions will provide a 10 year term for the License of Occupation agreement with a nominal yearly fee of $1.00 for the 10 year term, which will be subject to renegotiation for further renewals thereafter;
AND BE IT FURTHER RESOLVED that the Deputy City Manager of Infrastructure Services and Community Sustainability provide for the issuance of the required road cut permit to allow the Owner to undertake the proposed improvements subject to all technical matters related to the works being to the satisfaction of the Deputy City Manager and subject to any securities as set out in Document 1 being posted.
Comité des transports
Transportation Committee
Le 18 décembre 2009 / 18 December 2009
Soumis par / Submitted by: Georges Bédard,
Councillor / Conseiller
N° de réf./Ref N°: ACS2010-CCS-TRC-0002 |
OBJET :
|
90, rue George - SERVICE VOITURIER PROPOSÉ |
SUBJECT:
|
90 George Street – PROPOSED
VALET PARKING |
|
|
Que le Comité des transports recommande au
Conseil d’approuver :
1. Que le directeur du Bureau
des partenariats et du développement en immobilier soit autorisé à délivrer un permis d’occupation
au Propriétaire au nom de la Ville conformément aux modalités établies dans le
document 1, lesquelles prévoient que le permis d’occupation durera 10 ans
moyennant des frais annuels modiques de 1 $ pendant ces 10 ans et
qu’il pourra être renouvelé en fonction de la politique municipal en vigueur
concernant les baux fonciers après de nouvelles négociations par la suite.
2. Que le directrice
municipale adjointe, Services d’infrastructure et de la viabilité des collectivités,
permette la délivrance du permis de terrassement requis pour que le
Propriétaire procède aux améliorations proposées, sous réserve de la conformité
de tous les éléments techniques liés aux travaux aux règles, à la satisfaction
du directeur général, et de l’affichage des valeurs, comme le stipule le
document 1.
That the Transportation
Committee recommend that Council approve:
1. That the Director of Real Estate Partnership and Development Office be authorized to enter into a License of Occupation agreement on behalf of the City with the Owner in accordance with the terms and conditions as set out in Document 1, which terms and conditions will provide a 10 year term for the License of Occupation agreement with a nominal yearly fee of $1.00 for the 10 year term, which will be subject to renegotiation for further renewals based on applicable City land lease policy in place thereafter.
2. That
the Deputy City Manager, Infrastructure Services and Community Sustainability
provide for the issuance of the required road cut permit to allow the Owner to
undertake the proposed improvements subject to all technical matters related to
the works being to the satisfaction of the Deputy City Manager and subject to
any securities as set out in Document 1 being posted.
Le 2 décembre 2009, l’avis de motion
susmentionné a été soumis pour examen lors d’une réunion subséquente du Comité
des transports. La motion complète se trouve dans le document 1 ci-joint.
DISCUSSION
Le propriétaire du 90, rue George, et du 135,
rue Rideau, a obtenu l’approbation de son plan d’implantation pour la
construction d’une copropriété commerciale et résidentielle, sous
réserve :
Afin de bien marquer la démarcation entre
l’avant-cour de la copropriété commerciale et résidentielle du 90, rue George,
et les autres aires de stationnement de cette artère, un aménagement paysager
professionnel et des traitements de surface spécialisés ont été effectués. Le
propriétaire souhaite apporter des améliorations additionnelles à l’avant-cour,
comme en témoigne le document 2; celles-ci auront pour effet de la distinguer
encore davantage des autres aires de stationnement de la rue George.
De plus, le propriétaire souhaite obtenir le
droit d’utiliser et d’entretenir cette avant-cour réaménagée pour des activités
de livraison et de cueillette et un service voiturier liés à la copropriété
commerciale et résidentielle du 90, rue George/135, rue Rideau.
Les améliorations proposées sont jugées
bénéfiques du point de vue de l’esthétisme et de la sécurité. Elles sont
également avantageuses au plan opérationnel en permettant que les activités de livraison et de cueillette
ainsi que le service voiturier profitent tant aux résidents, aux commerçants et
aux clients de la copropriété qu’aux
gens qui utiliseront le stationnement public. À la lumière de ces
avantages, il est jugé raisonnable de n’exiger pendant 10 ans qu’un
paiement annuel symbolique d’un dollar (1 $), ce qui permettrait au
propriétaire de couvrir les coûts d’immobilisation des améliorations à
apporter.
Le personnel a examiné et accepté les
améliorations proposées, étant entendu que le propriétaire signe une entente
sur le permis d’occupation avec la Ville qui établit les obligations du
propriétaire en ce qui concerne l’amélioration et l’entretien des terrains et
lui donne le droit de gérer et d’exercer des activités dans l’avant-cour. Le
propriétaire est prêt à signer une telle entente, mais souhaite être exempté
des frais en considération de l’investissement dans les améliorations
proposées, estimé à 260 000 $. Conformément à la politique du Conseil, les
frais normaux consisteraient en un paiement annuel à la Ville de 26 000 $
en fonction du loyer du marché
actuel.
Les
zones d’amélioration commerciale du marché By et de la rue Rideau appuient les
améliorations proposées.
Le plan
d’implantation approuvé pour le 90, rue George a été négocié et approuvé avant
l’approbation de la Stratégie municipale de gestion du stationnement par le
Conseil en avril 2009. Le plan
d’implantation approuvé comprend l’élimination de six places de stationnement
public situées sur le terrain de stationnement devant le 90, rue George et
nécessite l’établissement de 20 places de stationnement accessibles au public
dans le cadre du projet d’aménagement. On convient que l’entente proposée du
permis d’occupation vise à permettre au propriétaire d’améliorer et de gérer
l’activité des véhicules sur l’emprise routière publique située devant le 90,
rue George, d’appuyer le service voiturier proposé et de tenir compte des
activités de livraison et de cueillette liées aux utilisations de la propriété
du 90, rue George. Ainsi, la Stratégie municipale de gestion du stationnement
ne s’appliquera pas au stationnement situé sur l’emprise routière desservant le
90, rue George, ni au stationnement rendu accessible au public situé sur place,
et ne pourra servir à leur exploitation.
Ces places de stationnement seront gérées et contrôlées par le
propriétaire en tant que stationnement commercial accessible au public.
L’entente
établie dans le cadre du processus d’approbation du plan d’implantation ne
serait pas conforme aujourd’hui à la Stratégie municipale de gestion du
stationnement. Toutefois, puisque cette
entente a été établie avant l’adoption de la Stratégie municipale de gestion du
stationnement et, grâce à l’avantage général que représente pour la communauté
l’officialisation de cette proposition sous forme d’une entente de permis
d’occupation et à l’appui du conseiller du quartier et de la ZAC, le personnel
des Travaux publics voit le permis d’occupation proposé comme la conclusion des
ententes établies dans le cadre du processus d’approbation du plan
d’implantation lié à la fonction de l’emprise routière située devant le 90, rue
George et il appuie la conclusion de ces ententes telles qu’établies dans le
présent rapport. Le personnel de Travaux
publics souhaite toutefois s’assurer que les conditions de l’entente permettent
de garantir que la conception et les enseignes indiquent clairement que le
stationnement est accessible au public.
De plus, si le promoteur prévoit l’intégration d’un stationnement public
avec ou sans parcomètre sur l’emprise routière en question, ce stationnement
sera géré par la Direction du stationnement dans le cadre du système de
stationnement public municipal.
Les questions relevées par le personnel en ce
qui concerne l’utilisation de l’emprise publique dans le cadre de cet
aménagement privé sont énumérées dans les conditions de l’entente sur le permis
d’occupation. Les emprises publiques, spécialement celles situées dans le
centre de la ville, constituent une ressource limitée qu’il faut gérer en ayant
soin d’en assurer la meilleure utilisation publique possible.
Le
personnel a collaboré avec le conseiller à la rédaction du document 3.
La décision de ne pas offrir les
renouvellements en fonction de leur valeur sur le marché est contraire à la
politique. Si une telle décision est prise, il doit donc en être question dans
ce rapport.
Cette
motion n’entraîne aucune répercussion rurale.
Sur le plan juridique ou de la gestion des
risques, rien n’empêche la mise en oeuvre des recommandations contenues dans le
présent rapport
Il n’y a
pas de répercussion financière.
Document 1
– Contenu de l’accord concernant le permis d’occupation
Document 2
– Plan de
nivellement et de drainage de l’avant-cour
Document 3
– Motion présentée le 2 décembre 2009
Sous
réserve de l’approbation du Conseil :
1. Le
directeur du Bureau des partenariats et du développement en immobilier
conclura, au nom de la Ville, un accord concernant le permis d’occupation avec
le propriétaire, conformément aux conditions énoncées dans le
document 1.
2. Le
directeur municipal adjoint des Services d’infrastructure et Viabilité des
collectivités délivrera le permis de terrassement dont le propriétaire a besoin
pour apporter les améliorations proposées.
Document 1
Document 3
90, rue George – Motion
ATTENDU QUE 90 George Street Ltd, propriétaire
des terrains dont la désignation municipale est le 90, rue George, et le 135,
rue Rideau,(le « propriétaire ») a obtenu l’approbation de son plan
d’implantation pour la construction d’une copropriété commerciale et
résidentielle;
ATTENDU QUE cette approbation était
conditionnelle à ce que le propriétaire apporte des améliorations à l’aire de
stationnement située dans l’emprise en face du 90, rue George, ce qui a
entraîné la disparition de six places de stationnement, et à ce qu’au moins 20
places soient réservées au public dans le stationnement souterrain de la
copropriété, pour pallier la disparition de ces six places;
ATTENDU QUE ces améliorations ont nécessité un
aménagement paysager professionnel et des traitements de surface spécialisés
afin de bien marquer la démarcation
entre l’avant-cour de la copropriété commerciale et résidentielle du 90, rue
George et les autres aires de stationnement de cette artère;
ATTENDU QUE le propriétaire souhaite apporter
des améliorations additionnelles à l’avant‑cour
du 90, rue George, comme en témoigne le document 2;
ATTENDU QUE ces améliorations auront pour effet
de distinguer encore davantage l’avant-cour du 90, rue George des autres aires
de stationnement de cette artère;
ATTENDU QUE le propriétaire souhaite obtenir le
droit d’utiliser et d’entretenir cette avant-cour réaménagée pour des activités
de livraison et de cueillette et un service voiturier liés à la copropriété
commerciale et résidentielle du 90, rue George/135, rue Rideau;
ATTENDU QUE les améliorations proposées
n’entraîneront la disparition d’aucune autre place de stationnement sur la rue
George, hormis les six autorisées dans le cadre du plan d’implantation;
ATTENDU QUE les améliorations proposées ont été
avalisées par le marché By et les ZAC de la rue Rideau;
ATTENDU QUE les améliorations proposées ont été
examinées et acceptées par le personnel de la Ville sous réserve que le
propriétaire conclue avec la Ville un accord concernant le permis d’occupation
qui l’oblige à améliorer et à entretenir les terrains et lui donne en retour le
droit de gérer et d’exploiter des activités dans l’avant-cour;
ATTENDU QUE le propriétaire est disposé à
conclure un tel accord, mais souhaite que les frais soient suspendus en raison
du montant investi, dans les améliorations proposées, estimé à
260 000 $;
ATTENDU QUE les frais normaux, en vertu de la
politique du Conseil, équivaudraient, sur le marché actuel, à un paiement
annuel de 26 000 $ à la Ville;
ATTENDU QUE les améliorations proposées sont
jugées bénéfiques du point de vue de l’esthétisme et de la sécurité, et
qu’elles sont également avantageuses au plan opérationnel en permettant que les activités de livraison et de
cueillette ainsi que le service voiturier profitent tant aux résidents, aux commerçants
et aux clients de la copropriété qu’aux
gens qui utiliseront le stationnement public;
ATTENDU QUE compte tenu de ces avantages, il
est jugé raisonnable de n’exiger pendant 10 ans qu’un paiement symbolique
d’un dollar (1 $), ce qui permettrait au propriétaire de couvrir les coûts
d’immobilisation des améliorations;
ET ATTENDU QUE le propriétaire souhaite, dans
la mesure du possible, entreprendre les travaux proposés avant la fin de la
saison de construction 2009, de manière à pouvoir mettre en œuvre des activités
de livraison et de cueillette et un service voiturier dont pourront profiter
tant les résidents, les commerçants et les clients de la copropriété que les
gens qui utiliseront le stationnement public;
IL EST RÉSOLU QUE le directeur du Bureau des
partenariats et du développement en immobilier soit autorisé à conclure, au nom
de la Ville, un accord concernant le permis d’occupation, conformément aux
conditions énoncées dans le document 1, soit un contrat d’une durée de
10 ans au cours duquel le propriétaire s’engage à payer un montant
symbolique annuel d’un dollar (1 $), et dont les renouvellements
subséquents devront faire l’objet de renégociations.
IL EST EN OUTRE RÉSOLU QUE le directeur
municipal adjoint des Services d’infrastructure et Viabilité des collectivités
délivre le permis de terrassement dont le propriétaire a besoin pour apporter
les améliorations proposées, sous réserve que toutes les questions techniques
relatives à l’exécution des travaux soient à la satisfaction du directeur
municipal adjoint, et que les garanties établies dans le document 1 soient
fournies.
90 GEORGE STREET – PROPOSED VALET
PARKING - MOTION
90, RUE GEORGE - SERVICE VOITURIER PROPOSÉ - MOTION
ACS2010-CCS-TRC-0002 Rideau-Vanier (12)
Councillor Bédard indicated he had a technical amendment which had been agreed upon by staff and the property owner, but which had not been reflected in the report.
Moved by G. Bédard
That the
following condition from the “Contents of License of Occupation Agreement”
(Document 1):
“Should the City and/or Public
Utilities operating within the Public Right of Way decide to renew or repair
infrastructure below the surface of the Lands, the Owner must remove the
improvements and repair or renew the surface of the lands at its expense upon
the time specified within written notice from the City.”
be
replaced with:
"Should
the City or utility companies decide to renew or repair infrastructure below
the surface of the lands, the City or utility company is responsible for
compacting while the owners are responsible for removing and replacing the
pavers within time periods specified in written notice from the City.
CARRIED
That the Transportation Committee recommend
that Council approve:
1. That the Director of Real
Estate Partnership and Development Office be authorized to enter into a License of Occupation agreement on
behalf of the City with the Owner in accordance with the terms and conditions
as set out in Document 1, which terms and conditions will provide a 10 year
term for the License of Occupation agreement with a nominal yearly fee of $1.00
for the 10 year term, which will be subject to renegotiation for further
renewals based on applicable City land lease policy in place thereafter.
2. That the Deputy City
Manager, Infrastructure Services and Community Sustainability provide for the
issuance of the required road cut permit to allow the Owner to undertake the
proposed improvements subject to all technical matters related to the works
being to the satisfaction of the Deputy City Manager and subject to any securities
as set out in Document 1 being posted.
CARRIED,
as amended