Branch/Division Vehicle Description Qty Project Number Estimated Capital Cost Operating Impact   Programming Rationale Standing Committee
RPAM / Transit New Garage Solid Waste:              
  Total for Water 6   #REF!        
                 
Building Services Compact Cars 4   $80,000 $37,726   Building Code Statute Law Amendment Act and Ontario Regulation 305/03 required the establishment of new Building Officials to undertake the mandatory inspections within a mandatory timeframe.  Vehicles are required for these new positions and the purchase of these is being phased in over a number of years, with 2009 identified as the last year.  The cost of these vehicles is funded 100% through building permit revenues per the Act.
Solid Waste Services Tool Cat 1   $50,000 $12,500   Growth to accommodate increased tonnage, maintain safe surface of small load public drop off facility year round utilizing bucket and power brush, load compost for public.
Hooklift Truck (Roll-off Truck) 1   $270,000 $67,500   Growth to accommodate increased tonnage, significant increase in small load facility attendance requires additional truck and 4 bins to maintain waste handling capacity.  Additional bins used to collect and deliver recyclable metals directly to market.  This could result in over $100K annually in additional revenue.
Surface Operations 1/2 Ton PU Trucks-Reg Cab, c/w A/C 2   $55,000 $28,917 Forestry Report Vehicles and equipment to implement the Trees and Forest maintenance programs as approved by Council 26 Sept. 2007.Ref # ACS2006-PWS-SOP-0005 Trees and Forests Maintenance Program, Quality Standards and Improvement Implementation Strategy
1/2 Ton PU Truck -Ext. Cab 1   $30,000 $14,791 Forestry Report Vehicles and equipment to implement the Trees and Forest maintenance programs as approved by Council 26 Sept. 2007 Ref # ACS2006-PWS-SOP-0005 Trees and Forests Maintenance Program, Quality Standards and Improvement Implementation Strategy
1 Ton Crew Cab PU Truck 1   $41,000 $15,058 Forestry Report Vehicles and equipment to implement the Trees and Forest maintenance programs as approved by Council 26 Sept. 2007 Ref # ACS2006-PWS-SOP-0005 Trees and Forests Maintenance Program, Quality Standards and Improvement Implementation Strategy
Bucket Truck 1   $210,000 $62,091 Forestry Report Vehicles and equipment to implement the Trees and Forest maintenance programs as approved by Council 26 Sept. 2007 Ref # ACS2006-PWS-SOP-0005 Trees and Forests Maintenance Program, Quality Standards and Improvement Implementation Strategy
1 Ton  Crew Cab PU Truck 1   $41,000 $15,058 Infrastructure Growth As a result of the increase in the forestry inventory an additional crew to trim trees is required to adequately response to concerns.
1 Ton Landscape Dump 1   $65,000 $21,724 Infrastructure Growth As a result of the increase in the forestry inventory and a limited number of contracted service providers in the stump removal services arena, a crew is required to adequately response to concerns from residents.
60HP Stump Grinder c/w Trailer 1   $75,000 $22,536 Infrastructure Growth As a result of the increase in the forestry inventory and a limited number of contracted service providers in the stump removal services arena, a crew is required to adequately response to concerns from residents.
1/2 Ton PU Truck-Reg Cab,c/w A/C 1   $27,500 $14,459 Infrastructure Growth As a result of the increase in the forestry inventory an additional vehicle is required for supervision of work being carried out.
Water and Wastewater Branch 3/4 Ton Cargo Vans 3 $105,000 $51,249 Utilities / Water / CS Two of the vehicles will support the Lead Replacement  Program  and their operating costs will be recovered from the Lead Capital Project.  The other cargo van is required for field operations due to system growth.
5 Ton Step Van (150K); Fit Up (45K)k, Compressor/Generator (30K) 1 $225,000 $32,264 Utilities / Water CCM Associated with the annual system growth.
Wheeled Excavator 1 $325,000 $75,786 Utilities / Water CCM The Wheeled Excavator will be utilized for larger excavations eliminating the need to contract out this service.
Diesel Plate Tamper 1 $15,000 $4,385 Utilities / Water CCM This tamper will be used for compacting backfill in trench/excavation areas which will limit the need for  operators in confined spaces when backfilling. 
Float Trailer 1 $30,000 $7,100 Utilities / Water CCM Trailer needed to transport slow moving equipment to job sites.
Extended Cab Pickup 1 $30,000 $14,791 Utilities / WWater Collection This vehicle will be use for new staff in Collection due to growth.
Cargo Van 1 $35,000 $17,083 Utilities / WWater Pump Station This vehicle will be use for new staff in Pump Station due to growth.
Cargo Van 2   $70,000 $26,832 Waste Water  This vehicle will be used for Sewer Lateral replacement and repairs.
$1,779,500 $541,850