8.       EAST URBAN COMMUNITY STORM WATER MANAGEMENT FACILITY
POND NO. 3, REDESIGN

                ÉTANG NO 3 DE L’INSTALLATION DE GESTION DES EAUX PLUVIALES
DE LA COMMUNAUTÉ URBAINE EST – NOUVELLE CONCEPTION


 

 

planning and environment Committee Recommendation

 

That Council approve that the City enter into a front-ending agreement with Jean-Guy Rivard for the redesign of the EUC Pond 3 based upon the principles set forth in Document 1 with the final form and content of the front-ending agreement being to the satisfaction of the General Manager, Planning and Development Department and the City Solicitor.

 

Corporate Services and economic Development Committee
Recommendation                                                                                                                

 

That Council approve the expenditure of $150,000 (or less) for the revision to the design of EUC Pond 3 subject to the execution of the front-ending agreement.

 

 

Recommandation du Comité de l’urbanisme et de l’environnement

 

Que le Conseil municipal approuve que la Ville signe une convention initiale avec Jean-Guy Rivard pour la nouvelle conception de l’étang 3 de la CUE basée sur les principes indiqués au Document 1 et que la forme et le contenu finals de la convention initiale satisfassent le directeur général du Service de l’urbanisme et de l’aménagement et le chef du contentieux

 

Recommandation du Comité des services organisationnels

et du développement économique                                                                           

 

Que le Conseil municipal approuve les dépenses de 150 000 $ (ou moins) pour la révision de la conception de l’étang 3 de la CUE sous réserve de la signature de la convention initiale.

 

 

For the information of Council

 

At its meeting of 08 June 2004 the Planning and Environment Committee approved the above-noted recommendation to Council.

 

 

Documentation

 

1.         Planning and Development Department General Manager's report dated 31 May 2004 (ACS2004-DEV-APR-0131).



Report to/Rapport au :

 

Planning and Environment Committee

Comité de l'urbanisme et de l'environnement

 

and / et

 

Corporate Services and Economic Development Committee

Comité des services organisationnels et du développement économique

 

31 May 2004 / le 31 mai 2004

 

Submitted by/Soumis par : Ned Lathrop, General Manager/Directeur général,

Planning and Development / Urbanisme et Aménagement 

 

Contact Person/Personne ressource : Larry Morrison, Manager / Gestionnaire

Infrastructure Approvals / Approbation des demandes d’infrastructure

(613) 580-2424 x27807, Larry.Morrison@ottawa.ca

 

Cumberland (19)

Ref N°: ACS2004-DEV-APR-0131

 

 

SUBJECT:

EAST URBAN COMMUNITY STORM WATER MANAGEMENT FACILITY POND # 3, REDESIGN 

 

 

OBJET :

ÉTANG NO 3 DE L’INSTALLATION DE GESTION DES EAUX PLUVIALES DE LA COMMUNAUTÉ URBAINE EST – NOUVELLE CONCEPTION

 

REPORT RECOMMENDATIONS

 

That Planning and Environment Committee recommend to Council that the City enter into a front-ending agreement with Jean-Guy Rivard for the redesign of the EUC Pond 3 based upon the principles set forth in Document 1 with the final form and content of the front-ending agreement being to the satisfaction of the General Manager, Planning and Development Department and the City Solicitor.

 

That Corporate Services and Economic Development Committee recommend to Council that the expenditure of $150,000 (or less) for the revision to the design of EUC Pond 3 be approved subject to the execution of the front-ending agreement.

 

RECOMMANDATIONS DU RAPPORT

 

Que le Comité de l’urbanisme et de l’environnement recommande au Conseil municipal que la Ville signe une convention initiale avec Jean-Guy Rivard pour la nouvelle conception de l’étang 3 de la CUE basée sur les principes indiqués au Document 1 et que la forme et le contenu finals de la convention initiale satisfassent le directeur général du Service de l’urbanisme et de l’aménagement et le chef du contentieux.

 

Que le Comité des services organisationnels et du développement économique recommande au Conseil municipal que les dépenses de 150 000 $ (ou moins) pour la révision de la conception de l’étang 3 de la CUE soient approuvées sous réserve de la signature de la convention initiale.

 

BACKGROUND

 

The Gloucester East Urban Community (EUC) is situated between Innes Road, Page Road, Mer Bleue Boulevard and the Via Rail line adjacent to the Mer Bleue Wetland.  In 1992, the City of Gloucester completed a Master Drainage Plan (MDP) Report, pursuant to the Provincial Class EA process.  The MDP report identified a requirement for a storm water management pond, known as Pond 3, to be situated at the south west limit of the EUC area, just south of Renaud Road.  In 2000, the City of Gloucester completed a Schedule B Class EA and design, which further refined the design details of Pond 3.  Pond 3 will provide storm outlet for approximately one third (190ha) of the EUC area, and it is proposed to be situated on lands which are currently owned by Mr. Jean Guy Rivard.  A sketch of the drainage area is attached as Document 2.

 

Because the Rivard lands are situated within 120 metres of the Mer Bleue Wetlands, the Official Plan required a Wetland Impact Study to be prepared.  The original design of the pond was based upon there being a buffer of 120 metres.  However, the Official Plan permits a buffer zone of less than 120 metres, provided that the reduction could be supported by appropriate Environmental Studies. After extensive review by staff, the Conservation Authority and environmental experts, a reduction in the buffer zone has been accepted.

 

Mr. Rivard has now requested that a redesign of Pond 3 take place in order to maximize the yield within his lands.     

 

 

DISCUSSION

 

The estimated cost of the redesign of the pond is $150,000.  Mr. Rivard is prepared to front-end the cost of the redesign.  However, Mr. Rivard has requested that the redesign be included as a development charge item in the current review of the City's Development Charge Background Study and By-law.  Should the Development Charge By-law which includes EUC Pond 3 be approved without appeal, staff would bring forward a proposal for Council's consideration to add the amount of the redesign to the 2005 Capital Budget.  Subject to approval of the development charge and the item in the 2005 budget, Mr. Rivard would be then be paid back for the cost of the study.

 

It is the opinion of staff that the possibility of the redesign of the pond is worthy of examination.  Given that the studies provided by Mr. Rivard have indicated that development of lands in this location within 120 metres of the Mer Bleu Wetland is possible in accordance with the policies for the protection of wetlands, it is appropriate to determine if the pond can be redesigned such that the development can take place.

 

The principles provided in Document 1 are such to ensure that:

 

a)         The redesign process is directed by the City;

b)         The liability for the cost of the redesign is with Mr. Rivard until all required approvals are obtained; and

c)         The obligation to repay Mr. Rivard for the redesign does not crystallize until the necessary funding is approved in a capital budget.

 

 

CONSULTATION

 

The  majority of the effected developers with lands within the benefiting area have been contacted by Mr. Rivard's planning consultant and advised of the content of this report and are in support.  All revisions to the design of the pond will comply with the Class Environmental Assessment process.  Mr. Rivard has agreed to the principles set forth in Document 1.

 

 

FINANCIAL IMPLICATIONS

 

The estimated cost of the redesign of the pond is $150,000.  Mr. Rivard is prepared to front-end the cost of the redesign.  However, Mr. Rivard has requested that the redesign be included as a development charge item in the current review of the City's Development Charge Background Study and By-law.  Should the Development Charge By-law which includes EUC Pond 3 be approved without appeal, staff would bring forward a proposal for council's consideration to add the amount of the redesign to the 2005 Capital Budget, Internal Order 900815 : DCA Stormwater Mgt. Fac. EUC Pond #3.  Subject to approval of the development charge and the item in the 2005 budget, Mr. Rivard would then be paid back for the cost of the study.     

 

 

SUPPORTING DOCUMENTATION

 

Document 1 - Conditions of Front-Ending Agreement

Document 2 - Reference Map

 

 

DISPOSITION

 

The final form of the agreement will be prepared by Legal Services in consultation with the Planning and Development Department.     

 


Document 1

 

CONDITIONS OF FRONT-ENDING AGREEMENT                                                               

 

1.                  Mr. Rivard shall be required to post a letter of credit in the amount of $150,000.

 

2.                  The contract for the redesign shall be between the City and a consulting engineering firm.  The City shall retain complete control over the terms of reference for the redesign of the pond and the provision of direction to the consulting firm conducting the redesign.

 

3.                  The estimated cost of the redesign must continue at all times to be $150,000 or less, inclusive of the Goods and Services Tax.  Should the cost at any time exceed this amount, the City shall only be obliged to continue with the redesign if Mr. Rivard first provides security for the cost in excess of $150,000.

 

4.                  The City shall invoice Mr. Rivard upon completion of the redesign or upon a quarterly basis, whichever will lead to earlier payments to the City.

 

5.                  The City will undertake to exercise its best efforts to obtain all required regulatory approvals for the redesigned pond.  However, in the event that the required approvals are not obtained, including the approval of a development charge by-law which permits the collection by the City of the cost of the original and redesign of the pond, there will be no obligation upon the City to repay Mr. Rivard for the cost of the redesign of the pond.

 

6.                  The repayment of the redesign costs shall only take place when Council has approved the necessary funds in a capital budget.  Council is under no obligation to approve such funding.

 


Document 2

REFERENCE MAP