PROJECT
NAME |
FROM/AT |
TO |
DETAILED
DESCRIPTION & JUSTIFICATION |
STATUS |
COMMENTS |
PROJECT TYPE |
|
|
Albert
Corridor (OT6) |
Bank |
Elgin |
Bicycle Facility |
Completed |
Complex project to provide good
facilities on key route. Portion on
Slater (Bank to Elgin) repainted with wide shared lanes in 1999. |
Roadway Modification |
|
|
Albion
Road (OT3) |
Cahill |
Johnston |
Between Cahill and Johnston -
paint edge lines at narrowing |
Completed |
Concern expressed about width of
pavement and cars squeezing cyclists. |
Roadway Modification |
|
|
Alta
Vista Drive (OT10) |
Ayres |
Industrial |
Bicycle lanes and intersection
widenings |
Completed |
Construction complete - pavement
markings painted. |
Roadway Modification |
|
|
Ancaster
Avenue at Carling Avenue |
Carling Avenue |
|
Bicycle access through
roadwayclosure |
Completed |
Completed -No Straight-through -
Bicycles Exempt signage. |
Traffic
Control |
|
|
Bay
Street at Catherine Street (OT6) |
Catherine |
|
Access at roadway closure |
Completed |
Completed Fall 1998. |
Roadway Modification |
|
|
Bay
Street/Gloucester Street (OT6) |
|
Bicycle lane painting |
Completed |
Completed June 1997. |
Roadway Modification |
|
|
Belanger
Street (OT9) |
|
Identify roadway as bicycle
facility (signage) |
Completed |
Completed March 1997. |
Network Issue |
|
|
Bicycle
Parking - City Facilities ( OT5 & OT6) |
|
Upgrade/install bicycle parking
at all City lots & garages |
Completed |
Completed July 1997. |
Bike
Parking |
|
|
Bicycle
Parking - Covered (OT6) |
|
2 locations for covered bicycle
parking - Laurier at Elgin and Slater at Bank |
Completed |
Completed 1996. |
Bike
Parking |
|
|
Bicycle Parking - On-street |
|
Five (5) locations (SE corner -
Nepean at Bank, NE corner - Lisgar at Bank,
SW corner - Cooper at Bank, NW
corner - MacLaren at Bank) |
Completed |
Monitoring and evaluation
undertaken (Summer 1999). Project
abandoned at end of 2000. Eight (8)
post racks installed on intersection narrowings. |
Bike
Parking |
|
|
Bicycle
Resource Guide 2000 |
|
Insert to Ottawa Citizen |
Completed |
Completed 2000 |
Promotion |
|
|
Blair
Road 1 |
Ogilvie |
Meadowbrook |
Barrier to crossing Highway 174
because of multiple lanes, ramps and weaving, and lack of bike facilities. |
Completed |
2000 resurfacing allowed
repainting of pavement markings to improve cyclist comfort by adding wide
shared lanes, but final solution is build bike lanes. |
Roadway Modification |
|
|
Blair
Road 2 |
Ogilvie |
Meadowbrook |
Barrier to crossing Highway 174
because of multiple lanes, ramps and weaving, and lack of bike facilities. |
Completed |
Consultant developed detailed
design and cost estimate to add bike lanes.
Cost partly covered by proposed MBNA Bank funded intersection
modifications at 174 off-ramp/Blair. |
Roadway Modification |
|
|
Blair
Road 4 |
Ogilvie |
Montreal Road |
Bike facilities to create a
continuous route on this CTN link |
Completed |
Paved cycling shoulder added in
coordination with RMOC road overlays on west side in 2000 and 1.75-2.0 m.
bike lane added by Gloucester in connection with sidewalk on east side in
1998 |
Roadway Modification |
|
|
Botsford
Street (OT10) |
|
Realignment of Planter Boxes |
Completed |
Completed January 1997. |
Roadway Modification |
|
|
Brewer
Park Pathway (OT9) |
Bronson |
Cameron |
Upgrade pathway connecting
Bronson Avenue to Cameron Avenue |
Completed |
Completed July 1997. |
Off-Road Modification |
|
|
Bronson
Avenue at Laurier Avenue (OT6) |
Laurier Avenue |
|
Signalized Intersection |
Completed |
Completed 1998. |
Traffic Control |
|
|
Brookfield
Road Pathway - East to Brookfield Road West/Flannery Drive intersection (OT8) |
Brookfield Road East |
Brookfield Road West |
Emergency vehicle access |
Completed |
Work Order sent to ROC May 2000. |
Traffic Control |
|
|
Brookfield
Road Pathway (OT8 & OT9) |
Brookfield Road East |
Brookfield Road West |
Upgrade pathway |
Completed |
Completed January 1997. |
New Off-Road Link |
|
|
Byron
Avenue (OT7) |
Roosevelt |
Churchill |
Bicycle Lanes (Churchill to
Roosevelt) to improve narrow section of road |
Completed |
Completed 2000 |
Roadway Modification |
|
|
Byron
Avenue/Fraser Avenue Light Signal (OT7) |
Fraser |
|
Traffic signal to improve
crossing for cyclists. |
Completed |
ROC installed push buttons.
Completed 1996. |
Traffic
Control |
|
|
Cameron
Avenue 1 (OT9) |
Seneca |
Bank |
Contra-flow bicycle lane |
Completed |
Completed. |
Roadway Modification |
|
|
Cartier
Street (OT6) |
Argyle |
Lisgar |
Bicycle route signage |
Completed |
Completed January 1997. |
Network Issue |
|
|
Cobourg
Street (OT5) |
Besserer |
|
Bicycle access through closure
at Besserer Street |
Completed |
Completed June 1997. |
Roadway Modification |
|
|
Community
Bicycle Tours |
|
Demonstrate benefits of cycling
through discovery of convenient local routes |
Completed |
No further action. |
Promotion |
|
|
Conroy
Road (OT3) |
Hunt Club Road |
Walkley Road |
Multi-use pathway |
Completed |
Construction complete. Ramping on pathways finalized in Spring
2000. |
New Off-Road Link |
|
|
Conroy
Road Bike Lane |
Hunt Club Road |
Walkley Road |
Bike lanes |
Completed |
|
Roadway Modification |
|
|
Cummings
Bridge (OT5) |
Rideau Pl. |
River Road |
Bicycle Facilities |
Completed |
Completed 1998. |
Roadway Modification |
|
|
Echo
Drive Pathway at Avenue Road (OT9) |
Avenue Road |
|
Improve pathway connection |
Completed |
Completed January 1998. |
Off-Road Modification |
|
|
Edgeworth
at Richmond |
Richmond Road |
|
Access closed to motorists with
barrier |
Completed |
Barrier constructed to allow a 5
foot opening on left side for cyclists |
Intersection Modification |
|
|
Edgeworth
Avenue at Carling Avenue (OT7) |
Carling Avenue |
|
Barrier at Richmond Road |
Completed |
Completed. |
Roadway Modification |
|
|
Flannery
Drive (OT8) |
|
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Georgina
Drive (OT1) |
|
Bicycle Route Signage |
Completed |
Completed 1998. |
Network Issue |
|
|
Gladstone
Avenue (Lebreton to Bay)
(OT6) |
Lebreton |
Bay |
Bicycle Facility as part of
roadwayReconstruction |
Completed |
4.25 m curb lanes provided. Final asphalt lift laid in Spring
2001. Pavement marking done in Spring
2001. |
Roadway Modification |
|
|
Gladstone
Avenue (OT6 & OT7) |
|
Bicycle route signage/logos |
Completed |
Completed March 1997. |
Network Issue |
|
|
Gladstone
Avenue Contra-flow Lane (OT6) |
Elgin |
Cartier |
Contra-flow bicycle lane |
Completed |
Completed. |
Roadway Modification |
|
|
Glen
Avenue (OT9) |
|
Barrier at Brewer Park |
Completed |
Construction completed 99.10. |
Roadway Modification |
|
|
Graham
Avenue (OT9) |
Echo Drive |
Main Street |
Contra-flow
Bicycle Lane |
Completed |
Completed. |
Roadway Modification |
|
|
Graham
Avenue at Echo Drive (OT9) |
Echo Drive |
|
Bicycle facility to provide
access from Pretoria Bridge to Echo Drive |
Completed |
Completed. |
Roadway Modification |
|
|
Guigues
St. (OT 5 R12) |
King Edward Avenue |
|
Barrier (West side) at King
Edward Ave. |
Completed |
No Parking zone implemented |
Traffic Control |
|
|
Hardy
Avenue/Coventry Road Pathway (OT4) |
Hardy |
Coventry |
Pathway link required to provide
access. |
Completed |
Completed 1996. |
New Off-Road Link |
|
|
Hunt
Club, West - Bike Facilities 4 |
Moodie Drive. 375 m. west of |
Moodie Drive. 375 m. east of |
Bicycle facilities. Heavy truck %; dangerous; busy cycling
route Kanata-Nepean, W.Barrhaven-Nortel Carling |
Completed |
Cycling paved shoulders added in
connection with realignment of intersection of Moodie and West Hunt Club Road |
Roadway Modification |
|
|
Iris
Street (at Pinecrest Shopping Centre) (OT2) |
|
Straight through restriction |
Completed |
Completed April 1998. Signage installed. |
Traffic Control |
|
|
Island
Park Drive Pavement Markings (OT7) |
Carling Avenue |
Ottawa River Parkway |
Bicycle lanes continued up to
intersections |
Completed |
Line painting completed. |
Roadway Modification |
|
|
Kilborn
Avenue (OT10) |
|
Bicycle facility - signage |
Completed |
Completed January 1997. |
Network Issue |
|
|
King
Edward at St. Patrick |
St. Andrew |
King Edward |
double
right turn created difficulties for through cyclists. |
Completed |
SIP improvement worsened
intersection. Reconfiguration of
lines completed 2000; monitor for problems.
King Edward reconstruction study commences 2001. |
Traffic
Control |
|
|
Kitchener
Avenue (OT8) |
|
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Lamira
Pathway (OT10) |
Lamira |
Pleasant Park |
Pathway Centreline Striping |
Completed |
Completed 2000. |
Traffic
Control |
|
|
Lancaster
Road (OT10) |
Walkley Road |
Shelbourne |
Bicycle lanes |
Completed |
Completed July 1997. |
Roadway Modification |
|
|
Lees
Avenue (OT5) |
Chapel Street |
|
Upgrade pathway at Chapel Street |
Completed |
Completed July 1997. |
Off-Road Modification |
|
|
Lees
Avenue Transit Station |
|
Improper bicycle route sign at
Lees Transitway Station |
Completed |
|
Transit Integration |
|
|
Lyon
Street (OT9) |
Fifth Avenue |
|
Barrier at Fifth Avenue |
Completed |
Built. |
Roadway Modification |
|
|
Madawaska
Avenue (OT9) |
Opeongo |
Bronson |
Bicycle route signage |
Completed |
Completed March 1997. |
Network Issue |
|
|
McCarthy
Road (OT8) |
Southmore |
Paul Anka |
Bicycle lanes/parking (Southmore
Drive to Paul Anka Drive) |
Completed |
Completed October 1998. Sidewalk and curb built on west side; edge
lines painted. |
Roadway Modification |
|
|
Monk
Street (OT9) |
Wilton |
Fifth |
Bicycle Route Signage |
Completed |
Completed 1997. |
Roadway Modification |
|
|
Mooney's
Bay Redevelopment Plan (OT8) |
|
Pathway layout and bicycle route
connection |
Completed |
Re-alignment of pathway
intersection with Riverside Drive at Mooney's Bay Place. Construction completed 2000. |
New Off-Road Link |
|
|
Nelson
Street (OT5) |
Besserer |
|
Barrier at Besserer Street -
requires bicycle access. |
Completed |
Completed. |
Roadway Modification |
|
|
New
Edinburgh Park Pathway (OT4) |
Beechwood |
Dufferin |
Phase 1 - Pathway paving from
Beechwood Avenue to Dufferin Street |
Completed |
Phase 1 -
Construction completed. Bollards
installed. |
Off-Road Modification |
|
|
New
Edinburgh Park Pathway (OT4) |
Stanley |
|
Phase 2 - Pathway paving from
Stanley Avenue to connect with existing paths |
Completed |
Phase 2 - Construction
completed. Bollards installed. Transition area in parking lot to be
improved. |
Off-Road Modification |
|
|
O'Connor
Street (OT6) |
Isabella |
|
Access at Isabella Avenue |
Completed |
Depressed curb re-done. Pavement markings completed. |
Intersection Modification |
|
|
O'Connor
Street (OT6) |
Catherine |
|
Bicycle lane (Catherine Street
to Isabella Street) to provide straight through access for bicycles |
Completed |
Construction completed; pavement
markings installed. Aug '98 |
Roadway Modification |
|
|
Ogilvie
Road |
St.
Laurent Blvd. |
Blair Place |
Bike lanes as part of road works |
Completed |
|
Roadway Modification |
|
|
Old
Riverside Drive (OT9) |
Smythe Road |
|
Barrier at Smyth Road - requires
bicycle access. |
Completed |
Completed. |
New Off-Road Link |
|
|
Ottawa
Hospital Pathway (Riverside Campus) (OT9) |
Rodney |
Hospital Ring Road |
Pathway Centreline Striping |
Completed |
Completed 2000. |
Traffic
Control |
|
|
Percy
Street 1 (OT6 & OT9) |
Chamberlain |
Catherine |
Bicycle boulevard upgraded and
loop detector installed. |
Completed |
Completed 1996. |
New Off-Road Link |
|
|
Percy
Street 2 (OT6) |
Catherine |
Flora |
Raised 2-way boulevard |
Completed |
Completed 1999. |
New Off-Road Link |
|
|
Percy
Street at Fifth Avenue (OT6) |
Fifth Avenue |
|
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Pinecrest
Creek Pathway |
Woodroffe Transitway Station |
Iris Pathway cross over |
Busy bike commuter route had
become degraded. |
Completed |
Shoddy condition of OCTranspo
pathway. Repaired in 2000 (to be
confirmed on-site). |
Off-Road Modification |
|
|
Pleasant
Park Rd. 1 (OT10) |
St.
Laurent Blvd. |
Alta Vista |
Install signage. Designate as a new Bicycle Route. |
Completed |
Completed August 1998. |
Network Issue |
|
|
Presland
Street at Dead End |
|
Repairs to curb ramp |
Completed |
Completed Fall 1998. |
Roadway Modification |
|
|
Prince
of Wales at Experimental Farm (OT8) |
Experimental Farm |
|
Parking irregularities on south
side of street. Bicycle lanes end
abruptly on north side of street at traffic circle. |
Completed |
2000 resurfacing of Prince of
Wales eliminated problem. |
Roadway Modification |
|
|
Rideau
River Pedestrian Bridge |
Algonquin College (Lees) |
Hurdman Park |
Rehabilitation of
pedestrian/cyclist bridge |
Completed |
Construction completed 2000. |
Off-Road Modification |
|
|
River
Road (Cummings Bridge/Presland Road (OT4) |
Presland |
Cummings Bridge |
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Riverdale
Avenue (OT9) |
|
Bicycle Route Signage |
Completed |
Completed January 1996. |
Network Issue |
|
|
Riverside
Hospital Pathway (OT10) |
|
Pathway connection to Hospital
roadway |
Completed |
Completed January 1998. |
New Off-Road Link |
|
|
Roosevelt
Avenue (north end)/Pathway/Scott Street (OT7) |
|
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Ryder
Street (OT10) |
|
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Safe
Routes to School |
|
Work with School Boards to
identify safe routes |
Completed |
No further action. |
Promotion |
|
|
Signs
and Markings 1 |
|
Various locations (as marked by
***) |
Completed |
|
Traffic
Control |
|
|
Slater
Corridor (OT6) |
Bank |
Elgin |
Bicycle Facility |
Completed |
Complex project to provide good
facilities on key route. Portion on
Slater (Bank to Elgin) repainted with wide shared lanes in 1999. |
Roadway Modification |
|
|
St.
Andrew St./Beausoleil and St. Patrick
(OT5) |
St. Patrick Street |
|
Barrier (North Side) at St.
Patrick. Bicycle access required. |
Completed |
Pedestrian access currently
provided Review cyclist access in
conjunction with above location.
Built in 2000, reflective tape being installed on railing in 2001. |
Roadway Modification |
|
|
St.
Andrew Street (OT5) |
King Edward Avenue |
|
Barrier at King Edward Avenue
(west and east side) |
Completed |
Completed |
Roadway Modification |
|
|
St.
Andrew Street (OT5) |
St. Patrick Street |
|
Barrier at Beausoleil Street and
St. Patrick Street (north side) |
Completed |
Reflective tape to be installed
on railing. |
Roadway Modification |
|
|
St.
Laurent Blvd. (OT10) |
Walkley |
Pleasant Park |
Bicycle lanes |
Completed |
Completed January 1996. |
Roadway Modification |
|
|
Stewart
Street 1 (OT5) |
Waller |
Cumberland |
Contra-flow bicycle lane (Waller
St. to Cumberland St.) |
Completed |
|
Roadway Modification |
|
|
Stewart
Street 2 (OT5) |
Waller |
Cumberland |
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Stewart
Street 3 (OT5) |
Waller |
Cumberland |
Detailed evaluation of contra
flow lane. |
Completed |
Pavement marking modifications
completed. |
Roadway Modification |
|
|
Sussex
Drive (OT5) |
Boteler |
King Edward |
Bicycle Facility |
Completed |
Wide shared straight through
lane painted in 2000. |
Roadway Modification |
|
|
TV
Promotion |
|
Safety/encouragement - Public
Service Announcements |
Completed |
No further action. |
Promotion |
|
|
Waller
Street ( OT5) |
MacKenzie King Bridge |
|
Bicycle facility to connect with
Mackenzie King Bridge |
Completed |
Completed 1998. |
Roadway Modification |
|
|
Wilbrod
Street (OT5) |
|
Bicycle Route Signage |
Completed |
Completed 1997. |
Network Issue |
|
|
Albion
Road Bike Facilities |
Lester |
Mitch Owens |
Bike lanes on Albion extended
southwards to Mitch Owens (development-driven). |
Completed-Declined |
Not done because of inadequate
available funding. Therefore bike
pockets were not introduced in front of the Raceway |
Roadway Modification |
|
|
Bruyere
St. at King Edward (OT5, R12) |
King Edward Avenue |
|
Barrier (on west side) |
Completed-Declined |
Not recommended.Curb depression
provides access to sidewalk on west side of King Edward Ave. ; uncontrolled
intersection not recommended for bicycle facility. |
Roadway Modification |
|
|
Cambridge
St. North (Northbound)(OT6, R17) |
|
Barrier |
Completed-Declined |
Two-way bicycle travel not
feasible.Narrow roadwaydesign (one-way) result of extensive public
consultation with community. Cyclists
may use adjacent roadway (i.e. Arthur St. ) |
Roadway Modification |
|
|
Charlotte
St. at St. Patrick St. (OT5, R12) |
St. Patrick Street |
|
Barrier |
Completed-Declined |
Ramp for cyclists could be
considered at pedestrian opening.
Cannot provide another opening in guard rail for separate cyclist
access.Can not support curb cuts if encourages peds to cross. |
Roadway Modification |
|
|
Hawthorne
Avenue Contra-flow Lane (OT9) |
Concord Street |
Main Street |
Contra-flow Bicycle Lane |
Completed-Declined |
Community opposed to any change
in parking, therefore, project abandoned. |
Roadway Modification |
|
|
Kilborn
Place and Bank (OT10) |
Kilborn Ct. |
Bank |
Barrier - pathway connection to
Bank Street. Roadway closure at Bank
Street |
Completed-Declined |
Curb depression/Access to Bank
St. at end of dead end requested. Site visit July 1999. No - safety issue, don’t do curb
cuts. Also, Committee expressed
concerns about tie-in with Bank Street and felt that any improvement may
encourage poor cycling behaviour at/on Bank Street. |
Off-Road Modification |
|
|
Lynda
Lane (OT10) |
Smythe Road |
|
Possible re-alignment of road |
Completed-Declined |
File Closed. |
Roadway Modification |
|
|
Opeongo Rd. at Carling Ave.
Westbound |
Carling Avenue |
|
Barrier |
Completed-Declined |
NCC advise that they will not
winter maintain pathway access to Booth Street crossing due to environmental
impact on tulip beds |
Off-Road Modification |
|
|
Smyth/Othello/Russell
(OT10) |
Smythe Road |
|
Intersection requires
improvements for bicycles |
Completed-Declined |
Region has reviewed advance stop
bars (proposed by OCAG) and does not approve this facility. |
Traffic
Control |
|
|
Wendover
Avenue/Warrington Drive (OT9) |
Cameron |
|
Connection to Cameron Avenue |
Completed-Declined |
Project deemed unnecessary. |
Network Issue |
|
|
Barr
Haven East Development Area Pathways |
|
3.0 m pathways for new
development in south Nepean; all 3.0 m. wide and asphalt except for one being
left stone dust for aesthetics |
Current |
part of a larger initiative,
being funded through Nepean's development charges. Estimated cost ~ $250,000 |
New Off-Road Link |
|
|
Bicycles
Exempt Signage (City-wide) |
|
Bicycle Exempt signage,
roadwayclosures |
current |
Ongoing - see list of city-wide
locations. |
Traffic
Control |
|
|
Blair
Road |
Ogilvie |
Meadowbrook |
Barrier to crossing Highway 174
because of multiple lanes, ramps and weaving, and lack of bike facilities. |
Current |
Detailed design and construction
drawings incorporating bike lanes available for use, pending funding. Circulations complete. Monitor results of Blair 1 project to
determine priority. Seek comments from OCAC. |
Roadway Modification |
|
|
Byron
Avenue Ironworks(OT7) |
Woodroffe |
Golden |
Overlay Repairs/Catch Basins |
Current |
Edgeline on south side to be
painted. Concern expressed about depression of some catch basins. CTN shifted to Richmond Road in 1999 |
Roadway Modification |
|
|
Cameron
Avenue 2 (OT9) |
Bank |
|
Intersection modifications to
reinforce CFBL signage. New median at
Bank Street. |
Current |
Construction to be undertaken
fall 2001. |
Roadway Modification |
|
|
Castlefrank
Road 1 |
Campeau |
Katimavik |
New crossing of Queensway. |
Current |
Castlefrank is intended to be
for local traffic primarily. 4.5
metre shared lanes to be implemented.
Off-road cycling/pedestrian connections proposed - under review. |
New Roadway |
|
|
Castlefrank
Road 2 |
Katimavik |
Hazeldean Road |
Neighbourhood
traffic concerns study to tie in with roadway modifications to the north. |
Current |
Cycling needs to be examined in the context of the study. |
Roadway Modification |
|
|
Cathcart
St. at King Edward (OT5, R12) |
King Edward Avenue |
|
Barrier (West Side) |
Current |
Modifications to westbound turn
restriction would require community consultation. Uncontrolled intersection - bicycle facility not
recommended. To be discussed in
context of King Edward Ave. Traffic Study, which commenced 2001. |
Area Study |
|
|
Cedarview |
Fallowfield |
Lytle |
Cedarview north of Lytle has
bike facility to West Hunt Club, needs to be continuous |
Current |
Was on RCAG priority list and is
a high Nepean priority (March 2001).
It should be considered for an upgrade to city arterial
standards. In house work ongoing. May be able to share costs with Guardrail
Program. |
Roadway Modification |
|
|
Crestway
Drive Bike Lanes |
Strandherd |
Prince of Wales Drive |
bike lanes being added to new
collector roads by (former) Nepean |
Current |
part of a larger initiative,
being funded through Nepean's development charges |
New Roadway |
|
|
Eagleson/CPR
Crossing |
Eagleson |
|
pedestrian/cyclist crossing
signal at midblock requested. |
Current |
Requested by member of the
public - to be investigated. |
Traffic
Control |
|
|
Fallowfield
Transit Bike Lockers |
Woodroffe |
|
Pilot project to encourage
bus-bike trips from Barrhaven |
Current |
Integrated with new Transitway
Station. Council approved in Nov. 99
10% of the number of car parking spaces be bike lockers. 8 lockers to be installed fall 2001. |
Bike
Parking |
|
|
Fisher
Avenue 1 |
Baseline |
Carling |
last overlay - shoulder used tar
& stone chips not good anymore |
Current |
Is on 2001 roadway resurfacing list.
Full paved shoulders to be constructed. |
Roadway Modification |
|
|
Fisher
Avenue at Meadowlands |
Meadowlands |
|
3.0 metre lanes squeeze cyclists
at intersection. |
Current |
2001 overlay program can provide
an oppportunity to improve conditions, including a design review. Overlay deferred to 2002. |
Intersection Modification |
|
|
Hunt
Club Road 1 |
Riverside Drive |
Bowesville Road/Royal Route |
Bicycle facility required -
missing link (speeds, traffic conditions an issue) |
Current |
Consultant undertaking
feasibility analysis/functional design. |
Roadway Modification |
|
|
Hunt Club
Road 2 |
Airport Parkway |
Cahill |
Bicycle facility required -
missing link (speeds, traffic conditions an issue) |
Current |
Consultant undertaking
feasibility analysis/functional design. |
Roadway Modification |
|
|
Hunt Club
Road 3 |
Esson |
Hawthorne |
Bicycle facility required -
missing link (speeds, traffic conditions an issue) |
Current |
Consultant undertaking
feasibility analysis/functional design. |
Roadway Modification |
|
|
Hunt
Club, West - Bike Facilities 1 |
Merivale Road |
Railroad bridge |
Needs bike lanes to connect with
existing lanes at each end of section. |
Current |
Consultant undertaking
feasibility analysis/functional design.
Section is on 2001 resurfacing program. |
Roadway Modification |
|
|
Hunt
Club, West - Bike Facilities 2 |
Railroad bridge |
Prince of Wales Drive |
Needs bike lanes to connect with
existing lanes at each end of section. |
Current |
Consultant undertaking
feasibility analysis/functional design.
Section is on 2001 resurfacing program. |
Roadway Modification |
|
|
Hunt
Club, West - Bike Facilities 3 |
Richmond Road |
Moodie Drive. 375 m. west of |
Complete continuous bike
facility on West Hunt Club Road. |
Current |
Functional design completed; no
detailed design required. Engineering
staff produced cost estimates 2000. |
Roadway Modification |
|
|
Hunt
Club, West - Bike Facilities 5 |
Moodie Drive. 375 m. east of |
Cedarview |
Heavy truck %; dangerous; busy
cycling route Kanata-Nepean, W.Barrhaven-Nortel Carling |
Current |
Functional design completed; no
detailed design required. Engineering
staff produced cost estimates 2000. |
Roadway Modification |
|
|
Industrial
Avenue Pathway 1 (OT10) |
Alta Vista |
Neighbourhood Way |
Pathway connection from
Industrial/Alta Vista intersection to Coronation/Neighbourhood Way/Station
Boulevard area. |
Current |
Site
plan/subdivision approved. Pathway
included as condition of approval. To
be constructed within 2 years of issuance of building permit (1999).. |
New Off-Road Link |
|
|
Industrial
Avenue Pathway 2 (OT10) |
Riverside |
Alta Vista |
Pathway connection on south side
of Industrial Ave. from Alta Vista (east side) to Riverside Dr. to link to Hurdman Transit Station. |
Current |
City proceeding to design
multi-use pathway link. Confirm
issues of roadwayROW. Signals has no
objections to removing NB to EB rt channel; cost before intersection
modification is estimated at $83,000 (Dec 99) |
New Off-Road Link |
|
|
Johnston
Road (OT3) |
|
Connection to Conroy Road
(temporary - short to medium term) |
Current |
Bicycle lanes recommended by
staff. Review of intersection design
(Bank Street, Conroy Road, to be undertaken.). 8.5 m temporary road to be constructed. |
Roadway Modification |
|
|
Laurier
Bridge Reconstruction |
Elgin |
Nicholas |
Bridge needing structural
repairs. Is also uncomfortable for
most cyclists due to narrow congested lanes. |
Current |
Is in final design stages. Includes bike lanes, connections to Queen E. Drive and a
friendlier intersection design at Nicholas Street. |
Roadway Modification |
|
|
Leggat
Drive Pathway |
Herzberg |
Solandt |
former Kanata project, part of
their Cycling Master Plan. Demand for
facilities by walkers, cyclists and skaters is very high in this area |
Current |
Part of a larger plan to raise
the profile of the Kanata North Business park's image. Cycling budget from former Kanata ($38k)
is only a small part of project.
Construction to start pending funding. |
New Off-Road Link |
|
|
Legget
Drive Bike Lanes |
Herzberg |
Solandt |
former Kanata project, part of
their Cycling Master Plan. Demand for
facilities by walkers, cyclists and skaters is very high in this area |
Current |
Part of road reconstruction
project to include bike lanes.
However, this has not been finalised and the possibility of the space
being used for parking exists. |
Roadway Modification |
|
|
Leikin
Bike lanes |
Crestway |
Bill Leathem |
bike lanes being added to new
collector roads by (former) Nepean |
Current |
part of a larger initiative,
being funded through Nepean's development charges |
New Roadway |
|
|
McIlraith
Bridge Pathway |
Rideau River Dr. |
Rideau Garden |
Pathway
connection between Rideau River Dr. and Rideau Garden. |
Current |
Pathway construction completed
2000. Barrier railing to be installed
in 2001. |
New Off-Road Link |
|
|
Minto
Bridges |
King Edward Avenue |
Stanley Avenue |
Lifecycle rehabilitation of
bridges required. |
Current |
Bicycle lanes to be
preovided. Project will also examine
implementation of bicycle lanes from Highway 5 overpass to Stanley Avenue. |
Roadway Modification |
|
|
Mooney's
Bay Pathway Extension (OT8) |
Mooney's Bay Place |
Walkley Road |
Extend pathway along Riverside
Drive to Walkley Road |
Current |
Assessing feasibility of
project. |
New Off-Road Link |
|
|
Oriska-Fallowfield
Transit Station Pathway Connection |
Oriska Extension@Fallowfield Road |
Transitway Entrance@Fallowfield
Road |
Problem for westbound cyclists
to turn into subdivision, to access either the pathway or the Oriska
Extension |
Current |
Project to be scoped. |
Transit Integration |
|
|
Ottawa
Hospital (General Campus) (OT10) |
Hospital Ring Road |
Station |
Pathway connection across Alta
Vista Parkway lands to link with Station Blvd. |
Current |
Concept Plan prepared. Review in context of Alta Vista Parkway
study |
Off-Road Modification |
|
|
Ottawa
Municipal Buildings Bike Parking |
|
To set an example all city
offices should be fitted with some bike parking facilities (i.e. 255 Centrum
Boulevard, former Cumberland) |
Current |
Full review of all municipal
facilities being undertaken. |
Bike
Parking |
|
|
Ottawa-Carleton
Trailway |
Main Street, Stittsville |
Ashton Station Road |
Extension of existing abandoned
CPR railway |
Current |
Being upgraded with signage and
stonedust in 2001. Work being done in conjuntion with public group. |
New Off-Road Link |
|
|
Pathway
to Train Station Pathway 1 (OT9) |
Hurdman Park |
|
1. Upgrade of pathway |
Current |
2. NCC to pave pathway as funds
permit (2000?). |
Off-Road Modification |
|
|
Pathway
to Train Station Pathway 2 (OT9) |
Hurdman Park |
|
2. Grading of pathway segment |
Current |
1. NCC to carry out upgrade
(2000?). |
Off-Road Modification |
|
|
Pleasant
Park Road 2 (OT10) |
Riverside |
|
Pathway access at Riverside
Drive |
Current |
Construction scheduled for late
summer 2001. |
New Off-Road Link |
|
|
Pooley's
Bridge Reconstruction |
Fleet Street |
Old Wellington |
Key cycling-pedestrian linkage
undergoing rehabilitation |
Current |
Bridge to have 4.5 metre shared
recreation pathway with centreline striping. Bridge re-opened September 2001. |
Off-Road Modification |
|
|
Preston
St.-Ottawa River Capital Pathway Link (OT7) |
Scott |
Ottawa R. Pathway |
need a link across the
Transitway; then add to CTN |
Current |
Signal modification, and
construction work scheduled for fall 2001.
Requires approval of NCC. |
New Off-Road Link |
|
|
Richmond
Road 4 (OT1 & OT7) |
Sherbourne |
Tweedsmuir |
Bike facilities (wide curb
lanes) to be added as part of rehab from Sherbourne to Tweedsmuir (2001) |
Current |
Project started in 1999. |
Roadway Modification |
|
|
Rideau
Canal Pedestrian Bridge |
Queen Elisabeth Drive |
Rideau Canal Eastern Pathway |
Project
intended to improve pedestrian connections.
Secondary purpose to act as a new cycling link. |
Current |
Well designed linkages to QED,
pathway & U. of Ottawa are integral.
Conceptual design complete. |
New Off-Road Link |
|
|
Sussex
at St. Patrick southbound |
St. Patrick Street |
|
Conflict between sb to wb
(bridge) motorists and sb through cyclists. |
Current |
Bike pocket to right of right
turn lane replaced a through-right turn lane, but motorists are using the
right turn lane incorrectly and going straight ahead, posing a risk to
cyclists and other motorists. Review
design and survey motorist behaviour.
Staff recommended restoration of pre-November 2000 markings. Monitoring to be undertaken. |
Roadway Modification |
|
|
Ottawa
Urban Cycling Awards |
|
Awards program to recognize
organizations and individuals who promote cycling |
Current- Ongoing |
Ongoing for 2001. |
Promotion |
|
|
Bicycle
Parking - Supervised Lots |
|
Supervised Bicycle Parking
project - By Ward Market |
Current-Ongoing |
Full service operation. |
Bike
Parking |
|
|
Bicycle Parking - Velocity |
|
Contract to provide bike parking
on public ROW (City/ROC/Velocity) |
Current-Ongoing |
Monitor contract. |
Bike
Parking |
|
|
Bicycle
Resource Guide 2001 |
|
Insert to Ottawa Citizen |
Current-Ongoing |
Distributed in April 2001 |
Promotion |
|
|
Brochures |
|
Winter Cycling, Bicycles and the Law, Bicycle Parking |
Current-Ongoing |
Maintain current stock and
identify distribution points. |
Promotion |
|
|
Pathway
Centre-line Striping (City-wide) |
|
Pavement markings |
Current-Ongoing |
See Appendix B. (5 Projects) |
Traffic
Control |
|
|
Signs and
Markings 2 |
|
Various locations (as marked by
***) |
Current-Ongoing |
|
Traffic
Control |
|
|
Website |
|
Update cycling information on
City Web Page. Provide info to
public about which pathways are winter-maintained (public request 16 Jan. 01) |
Current-Ongoing |
Information posted on current
website. Input to staff developing
new city website. |
Promotion |
|
|
Workplace
Education on Commuter Cycling |
|
Provide resources to existing
workplace Bicycle User Groups |
Current-Ongoing |
Compiling resource list.
Consider as a joint effort with Ottawa Cycling Committee. |
Promotion |
|
|
Carling
Avenue at Bronson |
Bronson |
|
Eastbound cyclists turning left
(north) on Bronson have difficulty positioning themselves at the intersection |
Future Pending |
Suggestion made to remove a
westbound traffic lane and shift the median north to permit the construction
of an eastbound left turn pocket for cyclists. Investigate. (one issue:
after cyclists make the turn they do not have a dedicated facility) |
Intersection Modification |
|
|
Ashley-Iris
access (OT2) |
Ashley |
Iris |
Connection along Queensway
off-ramp |
Future-Deferred |
Must be approved by MTO. Safety consideration for cyclists turning
right or proceeding through to Iris because of vehicular speeds from 417 and
right turn channel. Removal of
channel a potential solution. |
Roadway Modification |
|
|
Bank
Street at Echo Drive (east side) at Ottawa Public Library (OT9) |
Echo Drive |
|
Access to signalized crossing
(via parking lot) |
Future-Deferred |
Staff met with Chief Librarian
(Bank Street Branch) 06/00. Concept
plans prepared. Project on hold. |
New Off-Road Link |
|
|
Bay
Street Contra-flow Lane (OT6) |
Wellington |
Gloucester |
Contra-flow Bicycle Lane to
connect Wellington St. to Percy/Bay route south of Laurier Ave. |
Future-Deferred |
Schedule of West Memorial
Building alterations remains uncertain.
Concept plan on hold. |
Roadway Modification |
|
|
Burn St.
and Rainsford to Aviation Parkway (OT5) |
Aviation Parkway |
|
Barrier at Rainsford
Avenue. Access through fence and
across Aviation Parkway |
Future-Deferred |
Site visit made. Concept plan developed. NCC does not supportuncontrolled midblock
crossings. |
New Off-Road Link |
|
|
Byron
Avenue (OT7) |
Richmond Road |
|
Construction of pathway link at
Richmond Road |
Future-Deferred |
Councillor
has requested that dead-end be landscaped; pathway link must be
maintained. Committee requested that
if a 3.0 m pathway is constructed, the access at Richmond Road should also be
3.0 m wide. |
New Off-Road Link |
|
|
Centerpointe/Cobden
Signal |
Baseline |
|
Southbound and northbound thru
movements restricted by turn arrows. |
Future-Deferred |
Turn signals installed to
prevent motorist infiltration into neighbourhoods. Best solution is to use special bicycle green lens to replace
turn arrows, but waiting for MTO/TAC approval. Community Association will not accept solid green lens with
signs saying 'No Thru Movements, Bicycles Excepted' because of anticipated non-compliance by motorists. |
Traffic
Control |
|
|
Centrepointe/Highgate |
Baseline |
|
Southbound and northbound thru
movements restricted by turn arrows. |
Future-Deferred |
Turn signals installed to
prevent motorist infiltration into neighbourhoods. Best solution is to use special bicycle green lens to replace
turn arrows, but waiting for MTO/TAC approval. Community Association will not accept solid green lens with
signs saying 'No Thru Movements, Bicycles Excepted' because of anticipated non-compliance by motorists. |
Traffic
Control |
|
|
Opeongo
Avenue (OT9) |
Carling Avenue |
|
Barrier at Carling Avenue (east
side) |
Future-Deferred |
Access across Carling not
feasible. |
Roadway Modification |
|
|
Tyndall
Street at Parkdale Avenue (OT7) |
Parkdale |
|
Signalized intersection for
cyclists |
Future-Deferred |
ROC staff advise that crossing
can be installed on north side of intersection only. As this would not provide an acceptable
service to cyclists, project has been placed on hold. |
Traffic
Control |
|
|
Bank
Street South |
Johnson |
Ledbury |
Bike lanes on Bank Street over
railroad bridge. |
Future-Pending |
Although there is sufficient
width to permit bike lanes, there are structural modifications required that
could cost 100s of $k. Further
investigation is required. |
Roadway Modification |
|
|
Blair
Road 3 |
Montreal
Road |
Rockcliffe parkway |
Bike facilities to create a
continuous route on this CTN link |
Future-Pending |
Opportunity
to build cycling facilities in coordination with sidewalks |
Roadway Modification |
|
|
Brewer
Park Pathway (OT9) |
Bronson |
Cameron |
Pathway widening |
Future-Pending |
Pathway needs to be upgraded to
meet current standards of width.
Improve grade to ensure proper drainage. Review location and proximity to play strucutre. |
Off-Road Modification |
|
|
Byron-Woodroffe
Median Cut (OT1) |
Woodroffe |
|
Intersection modification at
Woodroffe Avenue to provide crossing for bicycles. Mid-block crossing to link Byron |
Future-Pending |
Requires feasibility analysis. |
Roadway Modification |
|
|
Colonel
By-Prince of Wales Dam Link |
Colonel By |
Prince of Wales |
improve access on a much used
link; add bike ramp on stairs |
Future-Pending |
Hartwell Lock Access-bike guide
on stairs Cost estimate and review
needed. |
New Off-Road Link |
|
|
Corkstown
Signage |
Moodie |
Carling |
confusing signage at both
entrances to Corkstown, for cyclists and motorists |
Future-Pending |
Review required. |
Network Issue |
|
|
Fisher
Avenue Experimental Farm Pathway Crossing |
Merivale Road |
|
NCC has reserved an east-west
corridor west of Merivale to connect to a pathway on the east side of
Merivale. NCC has requested a signal
to permit pedestrians and cyclists to cross at this location. |
Future-Pending |
Must make inquiries to
signals. NCC wants City to cover the
costs. Crossing would be slightly
south of Trent Street. |
Traffic
Control |
|
|
Heron
Westbound at Bronson South Ramp |
Bronson |
|
make 2nd right turn ramp into
through ramp |
Future-Pending |
Review required. |
Roadway Modification |
|
|
Hurdman
Transitway Access |
Riverside |
|
On road access forbidden to
cyclists using Industrial or Terminal.
Heavy cycling demand to access various pathway connection across/along
Rideau River. |
Future-Pending |
Agreement and plan being worked
out with OCTranspo & Signals.
Involves signage changes, a curb depression and line marking
changes. July 4: project on hold
pending results of proposal for railway lands, which may require car access
and intersection modifications |
Area Study |
|
|
Industrial
Avenue at Riverside (OT10) |
Riverside |
|
Relocation of pedestrian
push-button |
Future-Pending |
There are safety concerns about
locating push-button on sidewalk. The
former cycling committee requested that consideration be given to signalizing
the right turn lane. Letter written
to staff requesting reconsideration of intersection design. Staff is investigating (99.10) in context
of review of right turn channelization. |
Intersection Modification |
|
|
Lansdowne
Park (OT9) |
Bank |
|
Access for cyclists |
Future-Pending |
To be reviewed in context of
rehabilitation plan. |
Area Study |
|
|
Main St.
and Riverdale |
Riverdale |
|
Barrier at Riverdale
Ave./Mutchmor |
Future-Pending |
Consultant
has shown bicycle access as part of recommendations for Main Street Traffic
Study. Investigate options in
conjunction with modifications to intersection. |
Intersection Modification |
|
|
Merivale
Road Experimental Farm Bike facilities, east side |
Baseline Road |
Caldwell/rec pathway |
request thru Coun. Ofc; bike
facilities to match those on west side for Central Park Development |
Future-Pending |
Curb lane narrowed due to median
relocation for west side development.
Key link in CTN |
Intersection Modification |
|
|
Murray
St and King Edward Ave (OT5, R12) |
King Edward Avenue |
|
Barrier (East Side) |
Future-Pending |
Will examine
in context with King Edward Traffic Study |
Roadway Modification |
|
|
Ogilvie
Road |
Blair Place |
Montreal |
remove a situation where a good
facility leads to a constricted facility (eb) |
Future-Pending |
Ogilvie bike lanes |
Roadway Modification |
|
|
Pauline-Dunbarton
Link |
Pauline |
Dunbarton |
This is a useful link for
cyclists and pedestrians, and has been constructed of materials that create a
poor surface. |
Future-Pending |
Needs site inspection. |
Off-Road Modification |
|
|
Recreational
Pathway Signage |
|
Wayfinding
signs needed at various locations (i.e. Champlain St. north end pathway
split) |
Future-Pending |
Some system needs to be
developed for identification of watfinding, perhaps a f unction of the OCC. |
Network Issue |
|
|
Scott
Street (OT7) |
Churchill |
Empress |
Bicycle Facility |
Future-Pending |
Region to consider at time of
overlay (2000)? Section from
Churchill to Empress is on preliminary 2001 resurfacing list. |
Roadway Modification |
|
|
Scott
Street Pathway (OT7) |
Western Parkway |
Island Park Drive |
Pathway is discontinued at
Westboro Transitway Station, where buses enter. Cyclists required to dismount. |
Future-Pending |
|
Transit Integration |
|
|
Slater
Corridor (OT6) |
Bronson |
Bank |
Bicycle Facility |
Future-Pending |
Complex project to provide good
facilities on key route. Portion on
Slater (Bronson to Bank) on preliminary 2001 resurfacing list. |
Roadway Modification |
|
|
Survey of
Cycling Commuting in Ottawa |
|
Required information for network
planning and project prioritisation. |
Future-Pending |
Last such survey completed in
1992. Follow up survey to identify
changes in commuter demand and establish trend analysis for network planning. |
Area Study |
|
|
Woodroffe
Avenue Recreational Pathway Crossing |
Baseline, north of |
|
Motorist traffic control
infractions create hazardous conditions for pedestrians and cyclists. Cars going through red lights, especially
in southbound direction. |
Future-Pending |
Review. Survey of motorist infractions completed
July 7, 2001. Results and problem
statement sent to Traffic and Safety Operations. |
Traffic Control |
|
|
York St.
at King Edward Ave (OT5) |
King Edward Avenue |
|
Barrier at King Edward Avenue
(east and west sides). Intersection
crossing (both ways) for cyclists |
Future-Pending |
To be dealt with in context of
King Edward Avenue Study. |
Area Study |
|
|
Abandoned
Railroad/Rail Trail Opportunity |
Manotick Station |
Old Manotick Station |
Improval of connections in
former Osgoode Twsp. |
Future-Planned |
Old railroad abandoned Manotick
Station - Old Manotick Station, through Osgoode Town. Investigate feasibility. |
New Off-Road Link |
|
|
Albert
Corridor (OT6) |
Bronson |
Bank |
Bicycle Facility |
Future-Planned |
Complex project to provide good
facilities on key route. Best
opportunity will be at the next resurfacing. |
Roadway Modification |
|
|
Albion
Road Bridge over railroad tracks |
Johnson |
Ledbury |
Proposed crossing of railway to
link Albion Road north and south. |
Future-Planned |
Lack of access to downtown from
Greensboro/South Keys area because of tracks. Awaiting planning assessment and prioritisation. |
New Off-Road Link |
|
|
Alta
Vista Corridor (OT10) |
Conroy |
Nicholas |
Pathway facility |
Future-Planned |
Scope to be determined at time
of design of roadway. |
New Off-Road Link |
|
|
Bank
Street South |
Heron |
Hunt Club |
Bypass major roadwaybarriers at
Bank/Walkley, Bank/Heron |
Future-Planned |
One option: off road link using
abandoned railroad corridor |
New Off-Road Link |
|
|
Billings
Bridge (OT9) |
Riverdale |
Riverside |
Improved bicycle facilities on
bridge |
Future-Planned |
Long-range project. |
Roadway Modification |
|
|
Blair
Road 5 |
Meadowbrook |
Innes |
Bike facilities to create a
continuous route on this CTN link |
Future-Planned |
Opportunity to build cycling
facilities in coordination with next overlay or road widening |
Roadway Modification |
|
|
Cahill
Drive (OT3 & OT8) |
Cahill Drive |
Greensboro Transit Station |
Overpass connection from Cahill
Drive West to Greenboro Transit Station |
Future-Planned |
Long-range project. |
New Off-Road Link |
|
|
Cardinal
Creek Bridge |
Queen Street/RR 174 |
|
Pathway along Cardinal Creek
must wait for road widening for opportunity to bring pathway under bridge. |
Future-Planned |
Investigate opportunities with
Trim EA |
Roadway Modification |
|
|
Cardinal
Creek Pathway |
Innes Road |
Queen Street/RR 174 |
Future pathway link initiated by
Cumberland. Constraint at RR174
Bridge, must wait for roadwaywidening for opportunity to bring pathway under
bridge. |
Future-Planned |
Project should integrate with
Trim Road EA, which includes Hwy. 174 east to Cardinal Creek. Plans exist, includes connection to future
hydro corridor planned trail, supported by former Cumberland Recreation and
Culture Master Plan |
New Off-Road Link |
|
|
Carling
Avenue Railroad Underpass |
CN Rail Crossing in Greenbelt |
|
Carling narrows as it passes
under the bridge and the lanes are not wide enough to be shared safely. |
Future-Planned |
Bridge needs to be replaced,
very expensive solution. |
Roadway Modification |
|
|
Confederation
Heights (OT9) |
|
Connection to Transit &
various connections; signage on Heron Road at Data Centre Road |
Future-Planned |
Community request. |
Area Study |
|
|
Crestview-Tanglewood
Bike Pathway |
Crestview Community |
Tanglewood Community, Nepean |
Multi use pathway requested in
spring 1999. Would act as alternative
to Merivale. |
Future-Planned |
Crosses a railroad corridor. |
New Off-Road Link |
|
|
Cyrville
Road |
Meadowbrook |
Overpass |
Public at Meadowbrook/Cyrville
Open House identified as priority to
extend bike lanes northwards - add to project list |
Future-Planned |
Investigate feasibility. Project may get help from future private
developments along Cyrville. Road is
2 lane rural (March 2001). |
Roadway Modification |
|
|
Eastbound
Daly |
Charlotte |
|
misleading route signage, should
be a bike route turn left sign |
Future-Planned |
bike network route signage |
Network Issue |
|
|
Fisher
Avenue 2 |
Shillington |
Carling |
Utilty poles at Shillington and
curbs on the approach to Carling squeeze cyclists. |
Future-Planned |
At Shillington the addition of a
northbound left turn lane has left no space for the cycling paved
shoulder. Further north, the street
has curbs which restrict space for a cycling facility to connect to the paved
shoulders. Feasibility of widening
near Carling and adding a short off-road link at Shillington to be evaluated. |
Roadway Modification |
|
|
Hurdman-Rideau
Bridge Pathway |
|
Connection of pathway over
bridge (east side) to Algonquin College Lees, as alternative to west side
which dumps cyclists at bus shelter/curb at Lees Avenue |
Future-Planned |
Project to be identified - see
also project 'Lees Avenue (OT9). |
Off-Road Modification |
|
|
Lees
Avenue (OT9) |
Algonquin College (Lees) Driveway |
|
Intersection improvement at
Algonquin College |
Future-Planned |
No immediate solution. |
Intersection Modification |
|
|
Manotick
Connection - Jockvale Road |
Prince of Wales |
Strandherd |
Lacking a good link from
Manotick |
Future-Planned |
Investigate feasibility of bike
facilities on Jockvale to link Manotick to Greenbank/Strandherd. |
Roadway Modification |
|
|
Merivale
Road Railroad Bridge Underpass |
rr crossing s. of Colonnade,
south of |
rr crossing s. of Colonnade, north
of |
Key missing link. |
Future-Planned |
High priority for cycling
solution to Nepean staff March 2001.
Solution may involve using space under bridge on terrace, cutting off
top of terrace |
Roadway Modification |
|
|
Portobello-Innes
Road Link |
Portobello |
Innes |
New roadway should have bike
lanes/bike facility |
Future-Planned |
Monitor this former Cumberland
City planned link |
New Roadway |
|
|
Queen
Street/RR 174 Widening |
Trim Road |
Frank Kenny Road |
Strong need for cycling
facilities to connect Old Cumberland with urban area. Opportunity to add bike lanes with Queen
St. widening as part of Trim Road EA. |
Future-Planned |
Investigate opportunities with
Trim EA |
Roadway Modification |
|
|
Ramp at
Sheffield Road/Old Innes to Startop/Windmill |
Innes Road |
|
Off road link to reduce travel
distance. |
Future-Planned |
Steep gradient is a
constraint. Needs review. |
New Off-Road Link |
|
|
Richmond
Road 1 |
Stinson Avenue |
416 |
Discontinous, no bike
facilities 417 to Acres and 416 to
CDI. Investigate feasibility. |
Future-Planned |
Commuter cyclists complain about
lack of bike lanes to Computing Devices 3785 Richmond Rd.(Stinson Avenue in
Bell's Corners). Employees said they
would use it if built. |
Roadway Modification |
|
|
Richmond
Road 2 |
Queensway |
Acres |
Discontinous, no bike
facilities 417 to Acres and 416 to
CDI. Investigate feasibility. |
Future-Planned |
Commuter cyclists complain about
lack of bike lanes to Computing Devices 3785 Richmond Rd.(Stinson Avenue in
Bell's Corners). Employees said they
would use it if built. |
Roadway Modification |
|
|
Richmond
Road 3 (OT1 & OT7) |
Bayshore |
Carling |
Important cycling corridor; bike
lanes exist at either end |
Future-Planned |
Functional design work done in
2000 to determine feasibility. Review
in context of future resurfacing or rehabilitation projects. |
Roadway Modification |
|
|
Rideau
Valley Drive (RR#13) |
Manotick |
Roger Stevens |
Would be extensively used,
presently is a barrier |
Future-Planned |
Links to Manotick Connection
Project on Jockvale, but brings facilities to the south. |
Roadway Modification |
|
|
River
Road |
Manotick |
Limebank |
definitely used as commuter
route, not very good presently |
Future-Planned |
Slurry cap/pave shoulders. Full paved shoulders would improve cycling
facility. |
Roadway Modification |
|
|
Russell
Road/Belfast Road (OT10) |
Russell |
Belfast |
Bicycle facility across RR lands
as alternative to St. Laurent Blvd. (see also Industrial Avenue) |
Future-Planned |
Investigating opportunities in
conjunction with proposed development (Railway Lands). |
New Off-Road Link |
|
|
South Key
Mall |
Bank Street |
|
auxiliary right turn lane acts
as through. Curb lane is wide, thru
is narrow |
Future-Planned |
Consider use of bulbouts to
prevent through movements. |
Roadway Modification |
|
|
Terry
Fox/CPR Crossing |
Terry Fox |
|
pedestrian/cyclist crossing
signal or other control at midblock |
Future-Planned |
To be confirmed in connection
with Terry Fox extension. |
Traffic Control |
|
|
Timm Road |
Eagleson |
Moodie Drive |
Bicycle facilities |
Future-Planned |
Road
surface and traffic speeds detrimental to cyclists on this secondary on-road
cyclinig route of the CTN |
Roadway Modification |
|
|
Daly
Avenue and Waller |
Waller |
|
Barrier at Waller |
Status under Review |
|
Intersection Modification |
|
|
Lancaster
Rd. (OT10) Extension to Bicycle Lanes (1997) |
Shelbourne |
St. Laurent |
Bicycle lanes |
Status under Review |
Detailed plan completed.
Deferred, pending confirmation of connecting linkages. |
Roadway Modification |
|
|
Midway
Avenue at Edgeworth Avenue |
Edgeworth |
|
Barrier |
Status under Review |
Include option of full access
for bicycles. |
Roadway Modification |
|
|
|
|
|
|
|
|
|
|
|