PROJECT NAME FROM/AT TO DETAILED DESCRIPTION & JUSTIFICATION STATUS COMMENTS PROJECT TYPE
Albert Corridor (OT6) Bank Elgin Bicycle Facility Completed Complex project to provide good facilities on key route.  Portion on Slater (Bank to Elgin) repainted with wide shared lanes in 1999. Roadway Modification
Albion Road (OT3) Cahill Johnston Between Cahill and Johnston - paint edge lines at narrowing Completed Concern expressed about width of pavement and cars squeezing cyclists. Roadway Modification
Alta Vista Drive (OT10) Ayres Industrial Bicycle lanes and intersection widenings Completed Construction complete - pavement markings  painted. Roadway Modification
Ancaster Avenue at Carling Avenue Carling Avenue Bicycle access through roadwayclosure Completed Completed -No Straight-through - Bicycles Exempt signage. Traffic Control
Bay Street at Catherine Street (OT6) Catherine Access at roadway closure Completed Completed Fall 1998. Roadway Modification
Bay Street/Gloucester Street (OT6) Bicycle lane painting Completed Completed June 1997. Roadway Modification
Belanger Street (OT9) Identify roadway as bicycle facility (signage) Completed Completed March 1997. Network Issue
Bicycle Parking - City Facilities ( OT5 & OT6) Upgrade/install bicycle parking at all City lots & garages Completed Completed July 1997. Bike Parking
Bicycle Parking - Covered (OT6) 2 locations for covered bicycle parking - Laurier  at  Elgin and Slater  at  Bank Completed Completed 1996. Bike Parking
Bicycle Parking - On-street Five (5) locations (SE corner - Nepean at Bank, NE corner - Lisgar at Bank,  SW corner - Cooper at Bank,  NW corner - MacLaren at Bank) Completed Monitoring and evaluation undertaken (Summer 1999).  Project abandoned at end of 2000.  Eight (8) post racks installed on intersection narrowings. Bike Parking
Bicycle Resource Guide 2000 Insert to Ottawa Citizen Completed Completed 2000 Promotion
Blair Road 1 Ogilvie Meadowbrook Barrier to crossing Highway 174 because of multiple lanes, ramps and weaving, and lack of bike facilities. Completed 2000 resurfacing allowed repainting of pavement markings to improve cyclist comfort by adding wide shared lanes, but final solution is build bike lanes. Roadway Modification
Blair Road 2 Ogilvie Meadowbrook Barrier to crossing Highway 174 because of multiple lanes, ramps and weaving, and lack of bike facilities. Completed Consultant developed detailed design and cost estimate to add bike lanes.  Cost partly covered by proposed MBNA Bank funded intersection modifications at 174 off-ramp/Blair. Roadway Modification
Blair Road 4 Ogilvie Montreal Road Bike facilities to create a continuous route on this CTN link Completed Paved cycling shoulder added in coordination with RMOC road overlays on west side in 2000 and 1.75-2.0 m. bike lane added by Gloucester in connection with sidewalk on east side in 1998 Roadway Modification
Botsford Street (OT10) Realignment of Planter Boxes Completed Completed January 1997. Roadway Modification
Brewer Park Pathway (OT9) Bronson Cameron Upgrade pathway connecting Bronson Avenue to Cameron Avenue Completed Completed July 1997. Off-Road Modification
Bronson Avenue at Laurier Avenue  (OT6) Laurier Avenue Signalized Intersection Completed Completed 1998. Traffic Control
Brookfield Road Pathway - East to Brookfield Road West/Flannery Drive intersection (OT8) Brookfield Road East Brookfield Road West Emergency vehicle access Completed Work Order sent to ROC May 2000. Traffic Control
Brookfield Road Pathway (OT8 & OT9) Brookfield Road East Brookfield Road West Upgrade pathway Completed Completed January 1997. New Off-Road Link
Byron Avenue (OT7) Roosevelt Churchill Bicycle Lanes (Churchill to Roosevelt) to improve narrow section of road Completed Completed 2000 Roadway Modification
Byron Avenue/Fraser Avenue Light Signal (OT7) Fraser Traffic signal to improve crossing for cyclists. Completed ROC installed push buttons. Completed 1996. Traffic Control
Cameron Avenue 1 (OT9) Seneca Bank Contra-flow bicycle lane Completed Completed. Roadway Modification
Cartier Street (OT6) Argyle Lisgar Bicycle route signage Completed Completed January 1997. Network Issue
Cobourg Street (OT5) Besserer Bicycle access through closure at Besserer Street Completed Completed June 1997. Roadway Modification
Community Bicycle Tours Demonstrate benefits of cycling through discovery of convenient local routes Completed No further action. Promotion
Conroy Road (OT3) Hunt Club Road Walkley Road Multi-use pathway Completed Construction complete.  Ramping on pathways finalized in Spring 2000. New Off-Road Link
Conroy Road Bike Lane Hunt Club Road Walkley Road Bike lanes Completed Roadway Modification
Cummings Bridge (OT5) Rideau Pl. River Road Bicycle Facilities Completed Completed 1998. Roadway Modification
Echo Drive Pathway at Avenue Road  (OT9) Avenue Road Improve pathway connection Completed Completed January 1998. Off-Road Modification
Edgeworth at Richmond Richmond Road Access closed to motorists with barrier Completed Barrier constructed to allow a 5 foot opening on left side for cyclists Intersection Modification
Edgeworth Avenue at Carling Avenue (OT7) Carling Avenue Barrier at Richmond Road Completed Completed.  Roadway Modification
Flannery Drive (OT8) Bicycle Route Signage Completed Completed 1997. Network Issue
Georgina Drive (OT1) Bicycle Route Signage Completed Completed 1998. Network Issue
Gladstone Avenue (Lebreton to               Bay) (OT6) Lebreton Bay Bicycle Facility as part of roadwayReconstruction Completed 4.25 m curb lanes provided.  Final asphalt lift laid in Spring 2001.  Pavement marking done in Spring 2001. Roadway Modification
Gladstone Avenue (OT6 & OT7) Bicycle route signage/logos Completed Completed March 1997. Network Issue
Gladstone Avenue Contra-flow Lane (OT6) Elgin Cartier Contra-flow bicycle lane Completed Completed. Roadway Modification
Glen Avenue (OT9) Barrier at Brewer Park Completed Construction completed 99.10. Roadway Modification
Graham Avenue (OT9) Echo Drive Main Street Contra-flow Bicycle Lane Completed Completed. Roadway Modification
Graham Avenue at Echo Drive (OT9) Echo Drive Bicycle facility to provide access from Pretoria Bridge to Echo Drive Completed Completed. Roadway Modification
Guigues St. (OT 5 R12) King Edward Avenue Barrier (West side) at King Edward Ave. Completed No Parking zone implemented Traffic Control
Hardy Avenue/Coventry Road Pathway (OT4) Hardy Coventry Pathway link required to provide access. Completed Completed 1996. New Off-Road Link
Hunt Club, West -  Bike Facilities 4 Moodie Drive. 375 m. west of Moodie Drive. 375 m. east of Bicycle facilities.  Heavy truck %; dangerous; busy cycling route Kanata-Nepean, W.Barrhaven-Nortel Carling Completed Cycling paved shoulders added in connection with realignment of intersection of Moodie and West Hunt Club Road Roadway Modification
Iris Street (at Pinecrest Shopping Centre) (OT2) Straight through restriction Completed Completed April 1998.  Signage installed. Traffic Control
Island Park Drive Pavement Markings (OT7) Carling Avenue Ottawa River Parkway Bicycle lanes continued up to intersections Completed Line painting completed. Roadway Modification
Kilborn Avenue (OT10) Bicycle facility - signage Completed Completed January 1997. Network Issue
King Edward at St. Patrick St. Andrew King Edward double right turn created difficulties for through cyclists.  Completed SIP improvement worsened intersection.  Reconfiguration of lines completed 2000; monitor for problems.  King Edward reconstruction study commences 2001. Traffic Control
Kitchener Avenue (OT8) Bicycle Route Signage Completed Completed 1997. Network Issue
Lamira Pathway  (OT10) Lamira Pleasant Park Pathway Centreline Striping Completed Completed 2000. Traffic Control
Lancaster Road (OT10) Walkley Road Shelbourne Bicycle lanes Completed Completed July 1997. Roadway Modification
Lees Avenue (OT5) Chapel Street Upgrade pathway at Chapel Street Completed Completed July 1997. Off-Road Modification
Lees Avenue Transit Station Improper bicycle route sign at Lees Transitway Station Completed Transit Integration
Lyon Street (OT9) Fifth Avenue Barrier at Fifth Avenue Completed Built. Roadway Modification
Madawaska Avenue (OT9) Opeongo Bronson Bicycle route signage Completed Completed March 1997. Network Issue
McCarthy Road (OT8) Southmore Paul Anka Bicycle lanes/parking (Southmore Drive to Paul Anka Drive) Completed Completed October 1998.  Sidewalk and curb built on west side; edge lines painted. Roadway Modification
Monk Street (OT9) Wilton Fifth Bicycle Route Signage Completed Completed 1997. Roadway Modification
Mooney's Bay Redevelopment Plan (OT8) Pathway layout and bicycle route connection Completed Re-alignment of pathway intersection with Riverside Drive at Mooney's Bay Place.  Construction completed 2000. New Off-Road Link
Nelson Street (OT5) Besserer Barrier at Besserer Street - requires bicycle access. Completed Completed. Roadway Modification
New Edinburgh Park Pathway (OT4) Beechwood Dufferin Phase 1 - Pathway paving from Beechwood Avenue to Dufferin Street Completed Phase 1 - Construction completed.  Bollards installed.   Off-Road Modification
New Edinburgh Park Pathway (OT4) Stanley Phase 2 - Pathway paving from Stanley Avenue to connect with existing paths Completed Phase 2 - Construction completed.  Bollards installed.  Transition area in parking lot to be improved. Off-Road Modification
O'Connor Street (OT6) Isabella Access at Isabella Avenue Completed Depressed curb re-done.  Pavement markings completed. Intersection Modification
O'Connor Street (OT6) Catherine Bicycle lane (Catherine Street to Isabella Street) to provide straight through access for bicycles Completed Construction completed; pavement markings installed.  Aug '98 Roadway Modification
Ogilvie Road St. Laurent Blvd. Blair Place Bike lanes as part of road works Completed Roadway Modification
Old Riverside Drive (OT9) Smythe Road Barrier at Smyth Road - requires bicycle access. Completed Completed. New Off-Road Link
Ottawa Hospital Pathway (Riverside Campus) (OT9) Rodney Hospital Ring Road Pathway Centreline Striping Completed Completed 2000. Traffic Control
Percy Street 1 (OT6 & OT9) Chamberlain Catherine Bicycle boulevard upgraded and loop detector installed. Completed Completed 1996. New Off-Road Link
Percy Street 2 (OT6) Catherine Flora Raised 2-way boulevard Completed Completed 1999. New Off-Road Link
Percy Street at Fifth Avenue (OT6) Fifth Avenue Bicycle Route Signage Completed Completed 1997. Network Issue
Pinecrest Creek Pathway Woodroffe Transitway Station Iris Pathway cross over Busy bike commuter route had become degraded. Completed Shoddy condition of OCTranspo pathway.  Repaired in 2000 (to be confirmed on-site). Off-Road Modification
Pleasant Park Rd. 1 (OT10) St. Laurent Blvd. Alta Vista Install signage.  Designate as a new Bicycle Route. Completed Completed August 1998. Network Issue
Presland Street at Dead End Repairs to curb ramp Completed Completed Fall 1998. Roadway Modification
Prince of Wales at Experimental Farm (OT8) Experimental Farm Parking irregularities on south side of street.  Bicycle lanes end abruptly on north side of street at traffic circle. Completed 2000 resurfacing of Prince of Wales eliminated problem. Roadway Modification
Rideau River Pedestrian Bridge Algonquin College (Lees) Hurdman Park Rehabilitation of pedestrian/cyclist bridge Completed Construction completed 2000. Off-Road Modification
River Road (Cummings Bridge/Presland Road (OT4) Presland Cummings Bridge Bicycle Route Signage Completed Completed 1997. Network Issue
Riverdale Avenue (OT9) Bicycle Route Signage Completed Completed January 1996. Network Issue
Riverside Hospital Pathway (OT10) Pathway connection to Hospital roadway Completed Completed January 1998. New Off-Road Link
Roosevelt Avenue (north end)/Pathway/Scott Street (OT7) Bicycle Route Signage Completed Completed 1997. Network Issue
Ryder Street (OT10) Bicycle Route Signage Completed Completed 1997. Network Issue
Safe Routes to School Work with School Boards to identify safe routes Completed No further action. Promotion
Signs and Markings 1 Various locations (as marked by ***) Completed Traffic Control
Slater Corridor (OT6) Bank Elgin Bicycle Facility Completed Complex project to provide good facilities on key route.  Portion on Slater (Bank to Elgin) repainted with wide shared lanes in 1999. Roadway Modification
St. Andrew St./Beausoleil and St. Patrick  (OT5) St. Patrick Street Barrier (North Side) at St. Patrick.  Bicycle access required. Completed Pedestrian access currently provided  Review cyclist access in conjunction with above location.  Built in 2000, reflective tape being installed on railing in 2001. Roadway Modification
St. Andrew Street (OT5) King Edward Avenue Barrier at King Edward Avenue (west and east side) Completed Completed Roadway Modification
St. Andrew Street (OT5) St. Patrick Street Barrier at Beausoleil Street and St. Patrick Street (north side) Completed Reflective tape to be installed on railing. Roadway Modification
St. Laurent Blvd. (OT10) Walkley Pleasant Park Bicycle lanes Completed Completed January 1996. Roadway Modification
Stewart Street 1 (OT5) Waller Cumberland Contra-flow bicycle lane (Waller St. to Cumberland St.) Completed Roadway Modification
Stewart Street 2 (OT5) Waller Cumberland Bicycle Route Signage Completed Completed 1997. Network Issue
Stewart Street 3 (OT5) Waller Cumberland Detailed evaluation of contra flow lane. Completed Pavement marking modifications completed. Roadway Modification
Sussex Drive (OT5) Boteler King Edward Bicycle Facility Completed Wide shared straight through lane painted in 2000. Roadway Modification
TV Promotion Safety/encouragement - Public Service Announcements Completed No further action. Promotion
Waller Street ( OT5) MacKenzie King Bridge Bicycle facility to connect with Mackenzie King Bridge Completed Completed 1998. Roadway Modification
Wilbrod Street (OT5) Bicycle Route Signage Completed Completed 1997. Network Issue
Albion Road Bike Facilities Lester Mitch Owens Bike lanes on Albion extended southwards to Mitch Owens (development-driven). Completed-Declined Not done because of inadequate available funding.  Therefore bike pockets were not introduced in front of the Raceway Roadway Modification
Bruyere St. at King Edward (OT5, R12) King Edward Avenue Barrier (on west side) Completed-Declined Not recommended.Curb depression provides access to sidewalk on west side of King Edward Ave. ; uncontrolled intersection not recommended for bicycle facility. Roadway Modification
Cambridge St. North (Northbound)(OT6, R17) Barrier Completed-Declined Two-way bicycle travel not feasible.Narrow roadwaydesign (one-way) result of extensive public consultation with community.  Cyclists may use adjacent roadway (i.e. Arthur St. ) Roadway Modification
Charlotte St. at St. Patrick St. (OT5, R12) St. Patrick Street Barrier Completed-Declined Ramp for cyclists could be considered at pedestrian opening.  Cannot provide another opening in guard rail for separate cyclist access.Can not support curb cuts if encourages peds to cross. Roadway Modification
Hawthorne Avenue Contra-flow Lane (OT9) Concord Street Main Street Contra-flow Bicycle Lane Completed-Declined Community opposed to any change in parking, therefore, project abandoned. Roadway Modification
Kilborn Place and Bank (OT10) Kilborn Ct. Bank Barrier - pathway connection to Bank Street.  Roadway closure at Bank Street Completed-Declined Curb depression/Access to Bank St. at end of dead end requested. Site visit July 1999.  No - safety issue, don’t do curb cuts.  Also, Committee expressed concerns about tie-in with Bank Street and felt that any improvement may encourage poor cycling behaviour at/on Bank Street. Off-Road Modification
Lynda Lane (OT10) Smythe Road Possible re-alignment of road Completed-Declined File Closed. Roadway Modification
Opeongo Rd. at Carling Ave. Westbound Carling Avenue Barrier Completed-Declined NCC advise that they will not winter maintain pathway access to Booth Street crossing due to environmental impact on tulip beds Off-Road Modification
Smyth/Othello/Russell (OT10) Smythe Road Intersection requires improvements for bicycles Completed-Declined Region has reviewed advance stop bars (proposed by OCAG) and does not approve this facility. Traffic Control
Wendover Avenue/Warrington Drive (OT9) Cameron Connection to Cameron Avenue Completed-Declined Project deemed unnecessary. Network Issue
Barr Haven East Development Area Pathways 3.0 m pathways for new development in south Nepean; all 3.0 m. wide and asphalt except for one being left stone dust for aesthetics Current part of a larger initiative, being funded through Nepean's development charges.  Estimated cost ~ $250,000 New Off-Road Link
Bicycles Exempt Signage (City-wide) Bicycle Exempt signage, roadwayclosures current Ongoing - see list of city-wide locations. Traffic Control
Blair Road Ogilvie Meadowbrook Barrier to crossing Highway 174 because of multiple lanes, ramps and weaving, and lack of bike facilities. Current Detailed design and construction drawings incorporating bike lanes available for use, pending funding.  Circulations complete.  Monitor results of Blair 1 project to determine priority.  Seek comments from OCAC. Roadway Modification
Byron Avenue Ironworks(OT7) Woodroffe Golden Overlay Repairs/Catch Basins Current Edgeline on south side to be painted. Concern expressed about depression of some catch basins.  CTN shifted to Richmond Road in 1999 Roadway Modification
Cameron Avenue 2 (OT9) Bank Intersection modifications to reinforce CFBL signage.  New median at Bank Street. Current Construction to be undertaken fall 2001. Roadway Modification
Castlefrank Road 1 Campeau Katimavik New crossing of Queensway. Current Castlefrank is intended to be for local traffic primarily.  4.5 metre shared lanes to be implemented.  Off-road cycling/pedestrian connections proposed - under review. New Roadway
Castlefrank Road 2 Katimavik Hazeldean Road Neighbourhood traffic concerns study to tie in with roadway modifications to the north. Current  Cycling needs to be examined in the context of the study. Roadway Modification
Cathcart St. at King Edward  (OT5, R12) King Edward Avenue Barrier (West Side) Current Modifications to westbound turn restriction would require community consultation.  Uncontrolled intersection - bicycle facility not recommended.  To be discussed in context of King Edward Ave. Traffic Study, which commenced 2001. Area Study
Cedarview Fallowfield Lytle Cedarview north of Lytle has bike facility to West Hunt Club, needs to be continuous Current Was on RCAG priority list and is a high Nepean priority (March 2001).  It should be considered for an upgrade to city arterial standards.  In house work ongoing.  May be able to share costs with Guardrail Program. Roadway Modification
Crestway Drive Bike Lanes Strandherd Prince of Wales Drive bike lanes being added to new collector roads by (former) Nepean Current part of a larger initiative, being funded through Nepean's development charges New Roadway
Eagleson/CPR Crossing Eagleson pedestrian/cyclist crossing signal at midblock requested. Current Requested by member of the public - to be investigated. Traffic Control
Fallowfield Transit Bike Lockers Woodroffe Pilot project to encourage bus-bike trips from Barrhaven Current Integrated with new Transitway Station.  Council approved in Nov. 99 10% of the number of car parking spaces be bike lockers.  8 lockers to be installed fall 2001. Bike Parking
Fisher Avenue 1 Baseline Carling last overlay - shoulder used tar & stone chips not good anymore Current Is on  2001 roadway resurfacing list.  Full paved shoulders to be constructed. Roadway Modification
Fisher Avenue at Meadowlands Meadowlands 3.0 metre lanes squeeze cyclists at intersection. Current 2001 overlay program can provide an oppportunity to improve conditions, including a design review.  Overlay deferred to 2002. Intersection Modification
Hunt Club Road 1 Riverside Drive Bowesville Road/Royal Route Bicycle facility required - missing link (speeds, traffic conditions an issue) Current Consultant undertaking feasibility analysis/functional design. Roadway Modification
Hunt Club Road 2 Airport Parkway Cahill Bicycle facility required - missing link (speeds, traffic conditions an issue) Current Consultant undertaking feasibility analysis/functional design. Roadway Modification
Hunt Club Road 3 Esson Hawthorne Bicycle facility required - missing link (speeds, traffic conditions an issue) Current Consultant undertaking feasibility analysis/functional design. Roadway Modification
Hunt Club, West -  Bike Facilities 1 Merivale Road Railroad bridge Needs bike lanes to connect with existing lanes at each end of section. Current Consultant undertaking feasibility analysis/functional design.  Section is on 2001 resurfacing program. Roadway Modification
Hunt Club, West -  Bike Facilities 2 Railroad bridge Prince of Wales Drive Needs bike lanes to connect with existing lanes at each end of section. Current Consultant undertaking feasibility analysis/functional design.  Section is on 2001 resurfacing program. Roadway Modification
Hunt Club, West -  Bike Facilities 3 Richmond Road Moodie Drive. 375 m. west of Complete continuous bike facility on West Hunt Club Road. Current Functional design completed; no detailed design required.  Engineering staff produced cost estimates 2000. Roadway Modification
Hunt Club, West -  Bike Facilities 5 Moodie Drive. 375 m. east of Cedarview Heavy truck %; dangerous; busy cycling route Kanata-Nepean, W.Barrhaven-Nortel Carling Current Functional design completed; no detailed design required.  Engineering staff produced cost estimates 2000. Roadway Modification
Industrial Avenue Pathway 1 (OT10) Alta Vista Neighbourhood Way Pathway connection from Industrial/Alta Vista intersection to Coronation/Neighbourhood Way/Station Boulevard area. Current Site plan/subdivision approved.  Pathway included as condition of approval.  To be constructed within 2 years of issuance of building permit (1999).. New Off-Road Link
Industrial Avenue Pathway 2 (OT10) Riverside Alta Vista Pathway connection on south side of Industrial Ave. from Alta Vista (east side)  to Riverside Dr. to link to Hurdman Transit Station. Current City proceeding to design multi-use pathway link.  Confirm issues of roadwayROW.  Signals has no objections to removing NB to EB rt channel; cost before intersection modification is estimated at $83,000 (Dec 99) New Off-Road Link
Johnston Road (OT3) Connection to Conroy Road (temporary - short to medium term) Current Bicycle lanes recommended by staff.  Review of intersection design (Bank Street, Conroy Road, to be undertaken.).  8.5 m temporary road to be constructed. Roadway Modification
Laurier Bridge Reconstruction Elgin Nicholas Bridge needing structural repairs.  Is also uncomfortable for most cyclists due to narrow congested lanes. Current Is in final design stages.  Includes bike lanes,  connections to Queen E. Drive and a friendlier intersection design at Nicholas Street. Roadway Modification
Leggat Drive Pathway Herzberg Solandt former Kanata project, part of their Cycling Master Plan.  Demand for facilities by walkers, cyclists and skaters is very high in this area Current Part of a larger plan to raise the profile of the Kanata North Business park's image.  Cycling budget from former Kanata ($38k) is only a small part of project.  Construction to start pending funding. New Off-Road Link
Legget Drive Bike Lanes Herzberg Solandt former Kanata project, part of their Cycling Master Plan.  Demand for facilities by walkers, cyclists and skaters is very high in this area Current Part of road reconstruction project to include bike lanes.  However, this has not been finalised and the possibility of the space being used for parking exists. Roadway Modification
Leikin Bike lanes Crestway Bill Leathem bike lanes being added to new collector roads by (former) Nepean Current part of a larger initiative, being funded through Nepean's development charges New Roadway
McIlraith Bridge Pathway Rideau River Dr. Rideau Garden Pathway connection between Rideau River Dr. and Rideau Garden.  Current Pathway construction completed 2000.  Barrier railing to be installed in 2001. New Off-Road Link
Minto Bridges King Edward Avenue Stanley Avenue Lifecycle rehabilitation of bridges required. Current Bicycle lanes to be preovided.  Project will also examine implementation of bicycle lanes from Highway 5 overpass to Stanley Avenue. Roadway Modification
Mooney's Bay Pathway Extension (OT8) Mooney's Bay Place Walkley Road Extend pathway along Riverside Drive to Walkley Road Current Assessing feasibility of project. New Off-Road Link
Oriska-Fallowfield Transit Station Pathway Connection Oriska Extension@Fallowfield Road Transitway Entrance@Fallowfield Road Problem for westbound cyclists to turn into subdivision, to access either the pathway or the Oriska Extension Current Project to be scoped. Transit Integration
Ottawa Hospital (General Campus) (OT10) Hospital Ring Road Station Pathway connection across Alta Vista Parkway lands to link with Station Blvd. Current Concept Plan prepared.  Review in context of Alta Vista Parkway study Off-Road Modification
Ottawa Municipal Buildings Bike Parking To set an example all city offices should be fitted with some bike parking facilities (i.e. 255 Centrum Boulevard, former Cumberland) Current Full review of all municipal facilities being undertaken. Bike Parking
Ottawa-Carleton Trailway Main Street, Stittsville Ashton Station Road Extension of existing abandoned CPR railway Current Being upgraded with signage and stonedust in 2001. Work being done in conjuntion with public group. New Off-Road Link
Pathway to Train Station Pathway 1 (OT9) Hurdman Park 1. Upgrade of pathway Current 2. NCC to pave pathway as funds permit (2000?). Off-Road Modification
Pathway to Train Station Pathway 2 (OT9) Hurdman Park 2. Grading of pathway segment Current 1. NCC to carry out upgrade (2000?). Off-Road Modification
Pleasant Park Road 2 (OT10) Riverside Pathway access at Riverside Drive Current Construction scheduled for late summer 2001. New Off-Road Link
Pooley's Bridge Reconstruction Fleet Street Old Wellington Key cycling-pedestrian linkage undergoing rehabilitation Current Bridge to have 4.5 metre shared recreation pathway with centreline striping. Bridge re-opened September 2001. Off-Road Modification
Preston St.-Ottawa River Capital Pathway Link (OT7) Scott Ottawa R. Pathway need a link across the Transitway; then add to CTN Current Signal modification, and construction work scheduled for fall 2001.  Requires approval of NCC. New Off-Road Link
Richmond Road 4 (OT1 & OT7) Sherbourne Tweedsmuir Bike facilities (wide curb lanes) to be added as part of rehab from Sherbourne to Tweedsmuir (2001) Current Project started in 1999. Roadway Modification
Rideau Canal Pedestrian Bridge Queen Elisabeth Drive Rideau Canal Eastern Pathway Project intended to improve pedestrian connections.  Secondary purpose to act as a new cycling link.  Current Well designed linkages to QED, pathway & U. of Ottawa are integral.  Conceptual design complete. New Off-Road Link
Sussex at  St. Patrick southbound St. Patrick Street Conflict between sb to wb (bridge) motorists and sb through cyclists. Current Bike pocket to right of right turn lane replaced a through-right turn lane, but motorists are using the right turn lane incorrectly and going straight ahead, posing a risk to cyclists and other motorists.  Review design and survey motorist behaviour.  Staff recommended restoration of pre-November 2000 markings.  Monitoring to be undertaken. Roadway Modification
Ottawa Urban Cycling Awards Awards program to recognize organizations and individuals who promote cycling Current- Ongoing Ongoing for 2001. Promotion
Bicycle Parking - Supervised Lots Supervised Bicycle Parking project - By Ward Market Current-Ongoing Full service operation. Bike Parking
Bicycle Parking - Velocity Contract to provide bike parking on public ROW (City/ROC/Velocity) Current-Ongoing Monitor contract. Bike Parking
Bicycle Resource Guide 2001 Insert to Ottawa Citizen Current-Ongoing Distributed in April 2001 Promotion
Brochures Winter Cycling,  Bicycles and the Law,  Bicycle Parking Current-Ongoing Maintain current stock and identify distribution points. Promotion
Pathway Centre-line Striping (City-wide) Pavement markings Current-Ongoing See Appendix B.  (5 Projects) Traffic Control
Signs and Markings 2 Various locations (as marked by ***) Current-Ongoing Traffic Control
Website Update cycling information on City Web Page.   Provide info to public about which pathways are winter-maintained (public request 16 Jan. 01) Current-Ongoing Information posted on current website.  Input to staff developing new city website. Promotion
Workplace Education on Commuter Cycling Provide resources to existing workplace Bicycle User Groups Current-Ongoing Compiling resource list. Consider as a joint effort with Ottawa Cycling Committee. Promotion
Carling Avenue at Bronson Bronson Eastbound cyclists turning left (north) on Bronson have difficulty positioning themselves at the intersection Future Pending Suggestion made to remove a westbound traffic lane and shift the median north to permit the construction of an eastbound left turn pocket for cyclists.  Investigate.  (one issue: after cyclists make the turn they do not have a dedicated facility) Intersection Modification
Ashley-Iris access (OT2) Ashley Iris Connection along Queensway off-ramp Future-Deferred Must be approved by MTO.  Safety consideration for cyclists turning right or proceeding through to Iris because of vehicular speeds from 417 and right turn channel.  Removal of channel a potential solution. Roadway Modification
Bank Street at Echo Drive (east side) at Ottawa Public Library (OT9) Echo Drive Access to signalized crossing (via parking lot) Future-Deferred Staff met with Chief Librarian (Bank Street Branch) 06/00.  Concept plans prepared.  Project on hold. New Off-Road Link
Bay Street Contra-flow Lane (OT6) Wellington Gloucester Contra-flow Bicycle Lane to connect Wellington St. to Percy/Bay route south of Laurier Ave. Future-Deferred Schedule of West Memorial Building alterations remains uncertain.  Concept plan on hold. Roadway Modification
Burn St. and Rainsford to Aviation Parkway (OT5) Aviation Parkway Barrier at Rainsford Avenue.  Access through fence and across Aviation Parkway Future-Deferred Site visit made.  Concept plan developed.  NCC does not supportuncontrolled midblock crossings. New Off-Road Link
Byron Avenue (OT7) Richmond Road Construction of pathway link at Richmond Road Future-Deferred Councillor has requested that dead-end be landscaped; pathway link must be maintained.  Committee requested that if a 3.0 m pathway is constructed, the access at Richmond Road should also be 3.0 m wide.  New Off-Road Link
Centerpointe/Cobden Signal Baseline Southbound and northbound thru movements restricted by turn arrows. Future-Deferred Turn signals installed to prevent motorist infiltration into neighbourhoods.  Best solution is to use special bicycle green lens to replace turn arrows, but waiting for MTO/TAC approval.  Community Association will not accept solid green lens with signs saying 'No Thru Movements, Bicycles Excepted'  because of anticipated non-compliance by motorists. Traffic Control
Centrepointe/Highgate Baseline Southbound and northbound thru movements restricted by turn arrows. Future-Deferred Turn signals installed to prevent motorist infiltration into neighbourhoods.  Best solution is to use special bicycle green lens to replace turn arrows, but waiting for MTO/TAC approval.  Community Association will not accept solid green lens with signs saying 'No Thru Movements, Bicycles Excepted'  because of anticipated non-compliance by motorists. Traffic Control
Opeongo Avenue (OT9) Carling Avenue Barrier at Carling Avenue (east side) Future-Deferred Access across Carling not feasible. Roadway Modification
Tyndall Street at Parkdale Avenue (OT7) Parkdale Signalized intersection for cyclists Future-Deferred ROC staff advise that crossing can be installed on north side of intersection only.  As this would not provide an acceptable service to cyclists, project has been placed on hold. Traffic Control
Bank Street South Johnson Ledbury Bike lanes on Bank Street over railroad bridge. Future-Pending Although there is sufficient width to permit bike lanes, there are structural modifications required that could cost 100s of $k.  Further investigation is required. Roadway Modification
Blair Road 3 Montreal Road Rockcliffe parkway Bike facilities to create a continuous route on this CTN link Future-Pending Opportunity to build cycling facilities in coordination with sidewalks Roadway Modification
Brewer Park Pathway (OT9) Bronson Cameron Pathway widening Future-Pending Pathway needs to be upgraded to meet current standards of width.  Improve grade to ensure proper drainage.  Review location and proximity to play strucutre. Off-Road Modification
Byron-Woodroffe Median Cut (OT1) Woodroffe Intersection modification at Woodroffe Avenue to provide crossing for bicycles.  Mid-block crossing to link Byron Future-Pending Requires feasibility analysis. Roadway Modification
Colonel By-Prince of Wales Dam Link Colonel By Prince of Wales improve access on a much used link; add bike ramp on stairs Future-Pending Hartwell Lock Access-bike guide on stairs  Cost estimate and review needed. New Off-Road Link
Corkstown Signage Moodie Carling confusing signage at both entrances to Corkstown, for cyclists and motorists Future-Pending Review required. Network Issue
Fisher Avenue Experimental Farm Pathway Crossing Merivale Road NCC has reserved an east-west corridor west of Merivale to connect to a pathway on the east side of Merivale.  NCC has requested a signal to permit pedestrians and cyclists to cross at this location. Future-Pending Must make inquiries to signals.  NCC wants City to cover the costs.  Crossing would be slightly south of Trent Street. Traffic Control
Heron Westbound at Bronson South Ramp Bronson make 2nd right turn ramp into through ramp Future-Pending Review required. Roadway Modification
Hurdman Transitway Access Riverside On road access forbidden to cyclists using Industrial or Terminal.  Heavy cycling demand to access various pathway connection across/along Rideau River. Future-Pending Agreement and plan being worked out with OCTranspo & Signals.  Involves signage changes, a curb depression and line marking changes.  July 4: project on hold pending results of proposal for railway lands, which may require car access and intersection modifications Area Study
Industrial Avenue at Riverside (OT10) Riverside Relocation of pedestrian push-button Future-Pending There are safety concerns about locating push-button on sidewalk.  The former cycling committee requested that consideration be given to signalizing the right turn lane.  Letter written to staff requesting reconsideration of intersection design.  Staff is investigating (99.10) in context of review of right turn channelization. Intersection Modification
Lansdowne Park (OT9) Bank Access for cyclists Future-Pending To be reviewed in context of rehabilitation plan. Area Study
Main St. and Riverdale Riverdale Barrier at Riverdale Ave./Mutchmor Future-Pending Consultant has shown bicycle access as part of recommendations for Main Street Traffic Study.  Investigate options in conjunction with modifications to intersection. Intersection Modification
Merivale Road Experimental Farm Bike facilities, east side Baseline Road Caldwell/rec pathway request thru Coun. Ofc; bike facilities to match those on west side for Central Park Development Future-Pending Curb lane narrowed due to median relocation for west side development.  Key link in CTN Intersection Modification
Murray St and King Edward Ave (OT5, R12) King Edward Avenue Barrier (East Side) Future-Pending Will examine in context with King Edward Traffic Study Roadway Modification
Ogilvie Road Blair Place Montreal remove a situation where a good facility leads to a constricted facility (eb) Future-Pending Ogilvie bike lanes Roadway Modification
Pauline-Dunbarton Link Pauline Dunbarton This is a useful link for cyclists and pedestrians, and has been constructed of materials that create a poor surface. Future-Pending Needs site inspection. Off-Road Modification
Recreational Pathway Signage Wayfinding signs needed at various locations (i.e. Champlain St. north end pathway split) Future-Pending Some system needs to be developed for identification of watfinding, perhaps a f unction of the OCC. Network Issue
Scott Street (OT7) Churchill Empress Bicycle Facility Future-Pending Region to consider at time of overlay (2000)?  Section from Churchill to Empress is on preliminary 2001 resurfacing list. Roadway Modification
Scott Street Pathway (OT7) Western Parkway Island Park Drive Pathway is discontinued at Westboro Transitway Station, where buses enter.  Cyclists required to dismount. Future-Pending Transit Integration
Slater Corridor (OT6) Bronson Bank Bicycle Facility Future-Pending Complex project to provide good facilities on key route.  Portion on Slater (Bronson to Bank) on preliminary 2001 resurfacing list. Roadway Modification
Survey of Cycling Commuting in Ottawa Required information for network planning and project prioritisation. Future-Pending Last such survey completed in 1992.  Follow up survey to identify changes in commuter demand and establish trend analysis for network planning. Area Study
Woodroffe Avenue Recreational  Pathway Crossing Baseline, north of Motorist traffic control infractions create hazardous conditions for pedestrians and cyclists.  Cars going through red lights, especially in southbound direction. Future-Pending Review.  Survey of motorist infractions completed July 7, 2001.  Results and problem statement sent to Traffic and Safety Operations. Traffic Control
York St. at King Edward Ave (OT5) King Edward Avenue Barrier at King Edward Avenue (east and west sides).  Intersection crossing (both ways) for cyclists Future-Pending To be dealt with in context of King Edward Avenue Study. Area Study
Abandoned Railroad/Rail Trail Opportunity Manotick Station Old Manotick Station Improval of connections in former Osgoode Twsp. Future-Planned Old railroad abandoned Manotick Station - Old Manotick Station, through Osgoode Town.  Investigate feasibility. New Off-Road Link
Albert Corridor (OT6) Bronson Bank Bicycle Facility Future-Planned Complex project to provide good facilities on key route.  Best opportunity will be at the next resurfacing. Roadway Modification
Albion Road Bridge over railroad tracks Johnson Ledbury Proposed crossing of railway to link Albion Road north and south. Future-Planned Lack of access to downtown from Greensboro/South Keys area because of tracks.  Awaiting planning assessment and prioritisation. New Off-Road Link
Alta Vista Corridor (OT10) Conroy Nicholas Pathway facility Future-Planned Scope to be determined at time of design of roadway. New Off-Road Link
Bank Street South Heron Hunt Club Bypass major roadwaybarriers at Bank/Walkley, Bank/Heron Future-Planned One option: off road link using abandoned railroad corridor New Off-Road Link
Billings Bridge (OT9) Riverdale Riverside Improved bicycle facilities on bridge Future-Planned Long-range project. Roadway Modification
Blair Road 5 Meadowbrook Innes Bike facilities to create a continuous route on this CTN link Future-Planned Opportunity to build cycling facilities in coordination with next overlay or road widening Roadway Modification
Cahill Drive (OT3 & OT8) Cahill Drive Greensboro Transit Station Overpass connection from Cahill Drive West to Greenboro Transit Station Future-Planned Long-range project. New Off-Road Link
Cardinal Creek Bridge Queen Street/RR 174 Pathway along Cardinal Creek must wait for road widening for opportunity to bring pathway under bridge. Future-Planned Investigate opportunities with Trim EA Roadway Modification
Cardinal Creek Pathway Innes Road Queen Street/RR 174 Future pathway link initiated by Cumberland.  Constraint at RR174 Bridge, must wait for roadwaywidening for opportunity to bring pathway under bridge. Future-Planned Project should integrate with Trim Road EA, which includes Hwy. 174 east to Cardinal Creek.  Plans exist, includes connection to future hydro corridor planned trail, supported by former Cumberland Recreation and Culture Master Plan New Off-Road Link
Carling Avenue Railroad Underpass CN Rail Crossing in Greenbelt Carling narrows as it passes under the bridge and the lanes are not wide enough to be shared safely. Future-Planned Bridge needs to be replaced, very expensive solution. Roadway Modification
Confederation Heights (OT9) Connection to Transit & various connections; signage on Heron Road at Data Centre Road Future-Planned Community request. Area Study
Crestview-Tanglewood Bike Pathway Crestview Community Tanglewood Community, Nepean Multi use pathway requested in spring 1999.  Would act as alternative to Merivale. Future-Planned Crosses a railroad corridor. New Off-Road Link
Cyrville Road Meadowbrook Overpass Public at Meadowbrook/Cyrville Open House  identified as priority to extend bike lanes northwards - add to project list Future-Planned Investigate feasibility.  Project may get help from future private developments along Cyrville.  Road is 2 lane rural (March 2001). Roadway Modification
Eastbound Daly Charlotte misleading route signage, should be a bike route turn left sign Future-Planned bike network route signage Network Issue
Fisher Avenue 2 Shillington Carling Utilty poles at Shillington and curbs on the approach to Carling squeeze cyclists. Future-Planned At Shillington the addition of a northbound left turn lane has left no space for the cycling paved shoulder.  Further north, the street has curbs which restrict space for a cycling facility to connect to the paved shoulders.  Feasibility of widening near Carling and adding a short off-road link at Shillington to be evaluated. Roadway Modification
Hurdman-Rideau Bridge Pathway Connection of pathway over bridge (east side) to Algonquin College Lees, as alternative to west side which dumps cyclists at bus shelter/curb at Lees Avenue Future-Planned Project to be identified - see also project 'Lees Avenue (OT9). Off-Road Modification
Lees Avenue (OT9) Algonquin College (Lees) Driveway Intersection improvement at Algonquin College Future-Planned No immediate solution. Intersection Modification
Manotick Connection - Jockvale Road Prince of Wales Strandherd Lacking a good link from Manotick Future-Planned Investigate feasibility of bike facilities on Jockvale to link Manotick to Greenbank/Strandherd. Roadway Modification
Merivale Road Railroad Bridge Underpass rr crossing s. of Colonnade, south of rr crossing s. of Colonnade, north of Key missing link. Future-Planned High priority for cycling solution to Nepean staff March 2001.  Solution may involve using space under bridge on terrace, cutting off top of terrace Roadway Modification
Portobello-Innes Road Link Portobello Innes New roadway should have bike lanes/bike facility Future-Planned Monitor this former Cumberland City planned link New Roadway
Queen Street/RR 174 Widening Trim Road Frank Kenny Road Strong need for cycling facilities to connect Old Cumberland with urban area.  Opportunity to add bike lanes with Queen St. widening as part of Trim Road EA. Future-Planned Investigate opportunities with Trim EA Roadway Modification
Ramp at Sheffield Road/Old Innes to Startop/Windmill Innes Road Off road link to reduce travel distance. Future-Planned Steep gradient is a constraint.  Needs review. New Off-Road Link
Richmond Road 1 Stinson Avenue 416 Discontinous, no bike facilities  417 to Acres and 416 to CDI.    Investigate feasibility. Future-Planned Commuter cyclists complain about lack of bike lanes to Computing Devices 3785 Richmond Rd.(Stinson Avenue in Bell's Corners).  Employees said they would use it if built. Roadway Modification
Richmond Road 2 Queensway Acres Discontinous, no bike facilities  417 to Acres and 416 to CDI.    Investigate feasibility. Future-Planned Commuter cyclists complain about lack of bike lanes to Computing Devices 3785 Richmond Rd.(Stinson Avenue in Bell's Corners).  Employees said they would use it if built. Roadway Modification
Richmond Road 3 (OT1 & OT7) Bayshore Carling Important cycling corridor; bike lanes exist at either end Future-Planned Functional design work done in 2000 to determine feasibility.  Review in context of future resurfacing or rehabilitation projects. Roadway Modification
Rideau Valley Drive (RR#13) Manotick Roger Stevens Would be extensively used, presently is a barrier Future-Planned Links to Manotick Connection Project on Jockvale, but brings facilities to the south. Roadway Modification
River Road Manotick Limebank definitely used as commuter route, not very good presently Future-Planned Slurry cap/pave shoulders.  Full paved shoulders would improve cycling facility. Roadway Modification
Russell Road/Belfast Road (OT10) Russell Belfast Bicycle facility across RR lands as alternative to St. Laurent Blvd. (see also Industrial Avenue) Future-Planned Investigating opportunities in conjunction with proposed development (Railway Lands). New Off-Road Link
South Key Mall Bank Street auxiliary right turn lane acts as through.  Curb lane is wide, thru is narrow Future-Planned Consider use of bulbouts to prevent through movements. Roadway Modification
Terry Fox/CPR Crossing Terry Fox pedestrian/cyclist crossing signal or other control at midblock Future-Planned To be confirmed in connection with Terry Fox extension. Traffic Control
Timm Road Eagleson Moodie Drive Bicycle facilities Future-Planned Road surface and traffic speeds detrimental to cyclists on this secondary on-road cyclinig route of the CTN Roadway Modification
Daly Avenue and Waller Waller Barrier at Waller Status under Review Intersection Modification
Lancaster Rd. (OT10) Extension to Bicycle Lanes (1997) Shelbourne St. Laurent Bicycle lanes Status under Review Detailed plan completed. Deferred, pending confirmation of connecting linkages. Roadway Modification
Midway Avenue at Edgeworth Avenue Edgeworth Barrier Status under Review Include option of full access for bicycles. Roadway Modification